Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical AspectsThe paper describes the geotechnical as- pects of design and construction of two 12 m diameter concrete lined tunnels from the start of design to completion of construction. Prob- lems occurred due
Jan 1, 1981
-
A Possible Alternative to Hardwood Chock Pieces.By Thompson D, Somerville JM, Brock DA
The development of a softwood alternative to the hardwood chockpiece used to build the waste-edge breakers commonly incorporated in gateroad packs is described. The results of laboratory tests on so
Jan 1, 1992
-
The Problem of Increasing Coal Output from the Southern Mining District of New South WalesThis problem is seen as being central to a number of peripheral problems. Of these, the following are considered to be of major importance: 1. Reserves. Changes in Quality. Depths at which they occ
Jan 1, 1976
-
Case Examples of Stability on Surface Mining ProjectsStability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go
Jan 1, 1986
-
Relocable Inpit Crushing and Conveying SystemsAs a result of high fuel prices and substantial haul distances or vertical lift from pits, the development of large inpit crushing and conveying systems at many open pit operations has occurred over t
Jan 1, 1992
-
Cooling Underground Workings North Broken Hill Limited-Case StudyThe subject of heat sources in deep hard rock mines, the limitation of forced ventilation to cope with these heat loads and the sizing of refrigeration plants to boost the cooling effect of the ven
Jan 1, 1982
-
The influence of rock mass defects on pit slope design at the Ok Tedi mine, Papua New GuineaThe Ok Tedi open pit mine will have final wall heights in excess of 750m. The behaviour of these excavated slopes will be influenced by the presence of numerous defects. This paper discusses the ident
Jan 1, 1994
-
Geology, Alteration and Mineralisation of the Tampakan Copper DepositBy A Madera, R Watt
The Tampakan deposit is a strongly telescoped high-sulphidation-epithermal/ porphyry deposit pair which is hosted by a sequence of probable Pliocene age subaerial andesite flows. These host units lie
Jan 1, 1999
-
Geotechnical Engineering at Ok Tedi - A Multidisciplinary ApproachBy A P MACONOCHIE
The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal
Jan 1, 1992
-
The Integrative Technology of Slon Magnetic Separator and Centrifugal Separator for Processing Oxidised Iron OresBy X Dahe
SLon vertical ring and pulsating high gradient magnetic separators possess excellent mineral processing ability and have been widely applied to process oxidised iron ores. SLon centrifugal separators
Jul 11, 2011
-
Technical Considerations of Public Listing and Ongoing Compliance for Minerals CompaniesBy P Stephenson, G Mosher, M Berry, C Arnold, P Stoker
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Globally, private minerals companies considering the transition to a public company and ent
Mar 18, 2015
-
Management of dilution and mining recovery to maximise valueBy R Urie
Dilution and loss of ore during the mining process invariably occur in all underground mining operations. This dilution and ore loss can have a significant effect on the performance and value generate
Mar 29, 2023
-
Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016By J Darbritz
"This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016
Nov 15, 2016
-
The Mining Geology and Grade Control Practices of the Batman Deposit, Mt Todd ProjectMt Todd lies towards the south end of the Pine Creek Geosyncline, sandwiched between the Cullen Batholith and the Edith Falls Basin, in an area of regionally metamorphosed sandstones, siltstones and
Jan 1, 1994
-
The Geology of the Eloise Copper-Gold, Deposit, NW Queensland, AustraliaBy T. Baker
The Eloise Cu-Au deposit is 60 km SE of Cloncurry in NW Queensland and has a current indicated reserve of 3.2 Mt @ 5.8 per cent Cu, 1.5gA Au and I9g/t Ag. It is hosted by metasediments and metabasic
Jan 1, 1994
-
The Geology of the Eastern Distributor TunnelBy T R. Justice
The Eastern Distributor tunnel is located approximately 24 m beneath the suburbs of Woolloomooloo and Darlinghurst to the east of the central business district of Sydney. The 1.7 km long tunnel will c
Jan 1, 1999
-
Stabilisation of Pit Slopes, Waikaka Alluvial Gold MineWet mining of auriferous gravels at L & MÆs Waikaka operation in Southland creates spoil dumps derived from stripping of a clay rich overburden, tailings from past dredging and the processing of aurif
Jan 1, 2002
-
The Effect of Mineralogical Composition and Particle Size on the Relative Ignition Reactivities of Nickel Sulphide ConcentratesBy Davies S. G, Mackey L. C
The oxidation of iron and nickel sulphide concentrates, and the dominant sulphide minerals which comprise them, has been studied under ignition conditions using thermogravimetry (fG). The concentrates
Jan 1, 1989
-
The Graduate Experience - Momentum by MotivationA recent boom in the mining and minerals sector has seen the creation of an increasing number of graduate roles. These positions offer varying experiences, many with the larger international mining ho
Jan 1, 2007
-
An Empirical Method of Assessing Rock Mass BlastabilityA method of assessing the blastability of a rock mass is presented which makes use of five, readily available, simple parameters. These are the Rock Mass Description, Joint Plane Spacing, Joint Pl