Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New Blasting Initiation Technologies in the Mining IndustryAlfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut ProjectBy D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Challenges in determining the capacity of meshBy J Hadjigeorgiou, T R. Stacey
A ground support system is a combination of individual reinforcement and surface support elements that work together to retain and contain the rock mass. The various elements are subjected to external
Nov 30, 2018
-
Mixed Media Grinding - A Refractory Gold Case StudyBy C Bartle
In many operations the use of less electrochemically reactive grinding media in the first grinding stage (for example, rod milling and high aspect ratio SAG milling) is rarely considered. Therefore, i
Jan 1, 2008
-
Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting ExcitationBy C Dowding, C Aimone-Martin, P Abeel
This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc
Aug 24, 2015
-
Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, WashingtonBy L Galisson, E Audigé, D Sowers
Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington
Sep 17, 2014
-
Muck Pile Shaping for Draglines and Dozers at Surface CoalminesBy M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
Isasmelt and IsaMills ù Models of Successful R&DMIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen
Jan 1, 2002
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
Panel Caving Scheduling Under Precedence Constraints Considering Mining SystemBy E Rubio, N Morales
Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with
Sep 26, 2011
-
An Integrated Approach to Optimising All Concentrator Products, Including TailingsBy A Riles
"Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o
Jun 15, 2016
-
Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel ProcessingBy A Tawadrous, B Wheeler, D S. Preece, S A. Silling
The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical
Aug 24, 2015
-
An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mineBy C M. Standen
The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa
Aug 29, 2018
-
A Column Bioleaching Model for Chalcocite ù An Investigation of Oxygen Limitation and Bacterial Inoculation on LeachingBy M R. Davidson, M P. Schwarz
A model for column bioleaching is investigated to identify and understand aspects of bacteria in bioleaching applications, which have implications in heap bioleaching operations. The model is used to
Jan 1, 2004
-
Experimental and Comminution Model Framework for Secondary Fragmentation Prediction in Block CavingBy A Hekmat, R Castro, A Casali, R Gómez
Block caving is the most economic underground methods for excavating massive orebodies, due to the high productivity and low production costs. The success of block caving operations depends on the fra
May 9, 2016
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, MalaysiaBy B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
Technical Data Management at PorgeraBy A G. Shellsh, R J. Henham, J R. Foley
The Porgera Gold Mine, west of Mt Hagen in PNG is a large open pit and underground operation currently producing gold at the rate of almost one million ounces per year. This deposit has produced some
Jan 1, 2000
-
Maldon to Dombarton Rail Link – Design Development of the Avon TunnelBy A Bagis, T Baker
In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct
Sep 17, 2014
-
Lihir Gold Five Years On ù Maximising Throughput and Capital UtilisationDuring the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Management of Acid Drainage in the Australian Minerals IndustryConfirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A
Jan 1, 2003