Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Blasting Initiation Technologies in the Mining Industry

    Alfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based

    Jan 1, 2005

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Challenges in determining the capacity of mesh

    By J Hadjigeorgiou, T R. Stacey

    A ground support system is a combination of individual reinforcement and surface support elements that work together to retain and contain the rock mass. The various elements are subjected to external

    Nov 30, 2018

  • AUSIMM
    Mixed Media Grinding - A Refractory Gold Case Study

    By C Bartle

    In many operations the use of less electrochemically reactive grinding media in the first grinding stage (for example, rod milling and high aspect ratio SAG milling) is rarely considered. Therefore, i

    Jan 1, 2008

  • AUSIMM
    Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation

    By C Dowding, C Aimone-Martin, P Abeel

    This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc

    Aug 24, 2015

  • AUSIMM
    Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, Washington

    By L Galisson, E Audigé, D Sowers

    Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington

    Sep 17, 2014

  • AUSIMM
    Muck Pile Shaping for Draglines and Dozers at Surface Coalmines

    By M Nagarajan, S Esen

    This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang

    Aug 24, 2015

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant Performance

    By P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall

    Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con

    Sep 1, 2014

  • AUSIMM
    Panel Caving Scheduling Under Precedence Constraints Considering Mining System

    By E Rubio, N Morales

    Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with

    Sep 26, 2011

  • AUSIMM
    An Integrated Approach to Optimising All Concentrator Products, Including Tailings

    By A Riles

    "Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o

    Jun 15, 2016

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mine

    By C M. Standen

    The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa

    Aug 29, 2018

  • AUSIMM
    A Column Bioleaching Model for Chalcocite ù An Investigation of Oxygen Limitation and Bacterial Inoculation on Leaching

    By M R. Davidson, M P. Schwarz

    A model for column bioleaching is investigated to identify and understand aspects of bacteria in bioleaching applications, which have implications in heap bioleaching operations. The model is used to

    Jan 1, 2004

  • AUSIMM
    Experimental and Comminution Model Framework for Secondary Fragmentation Prediction in Block Caving

    By A Hekmat, R Castro, A Casali, R Gómez

    Block caving is the most economic underground methods for excavating massive orebodies, due to the high productivity and low production costs. The success of block caving operations depends on the fra

    May 9, 2016

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Technical Data Management at Porgera

    By A G. Shellsh, R J. Henham, J R. Foley

    The Porgera Gold Mine, west of Mt Hagen in PNG is a large open pit and underground operation currently producing gold at the rate of almost one million ounces per year. This deposit has produced some

    Jan 1, 2000

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Management of Acid Drainage in the Australian Minerals Industry

    Confirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A

    Jan 1, 2003