Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mining Safety - The Lessons Learned but not Applied

    By J M TORLACH

    Learning is an iterative process, and we might reasonably expect that after more than a century of mining during an era of sustained technological development, (following a millenium or two of unrel

    Jan 1, 1992

  • AUSIMM
    A Toolbox of Ideas for the Geoscientist Working on Block Cave Mines

    By N Burgio

    Block cave mines are often thought of as rock factories where high volumes of production are mined from a fixed area suggesting little requirement for geological input and control. Yet caving operatio

    Aug 22, 2011

  • AUSIMM
    A New Approach to Mining Research in Canada

    By A Galley, M Plouffe, T Hynes

    Canadian mining research has recently been reinvigorated through a pan-Canadian research strategy driven by the industry, the research community and government departments. These organisations have co

    Jul 10, 2012

  • AUSIMM
    Quantifying Geotechnical Risk in the Mine Planning Process

    By T P. Medhurst

    In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi

    Jan 1, 2000

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    Rocks are not Enough

    Times are changing for the mining industry. Civil society is demanding that miners pay more attention to the ways they impact on, and engage with, communities around their mines. Miners, in turn, are

    Jan 1, 2005

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow Tests

    Traditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel

    Jul 1, 2013

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Australia and it's Minerals Industry-Sharing the Same Future

    In Australia we usually define "resource" in purely material terms, and rarely relate it to intellect and human capacity. We look at the sheer abundance of our natural resources and are satisfied w

    Jan 1, 1986

  • AUSIMM
    Some Notes on Gold Milling Practice in Bendigo

    This paper endeavours to lay as concisely as possible, before the members the salient features of local gold milling practice, and to point out in what respects this practice differs from that of othe

    Jan 1, 1902

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    The Network Centric Mine

    By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly

    To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T

    Nov 20, 2012

  • AUSIMM
    Life-of-Mine Planning in a Dynamic Environment

    By I Manege, S M. Bennett

    The PT Kaltim Prima Coal (KPC) operation is a large scale coalmine operating on the east coast of Kalimantan (Borneo), Indonesia. Originally developed under a coal contract of work (CCOW) with the Ind

    Jul 16, 2014

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Identify, Convert and Sustain – Resource Development in the Pilbara – The Rio Tinto Way

    By G Danckert

    The key technical theme of ‘orebody knowledge’ has been applied by Rio Tinto in the Pilbara iron ore precinct from 1966, when operations first started there. It forms the basis of present day applicat

    Jul 11, 2011

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994

  • AUSIMM
    Long-Term Erosional Stability of Mine Spoils

    By Riley S

    Many regulatory bodies have, or are considering, guidelines that require rehabilitated mine spoils to be erosionally stable (satisfying quantitative limits) over specified design lifetimes. One of

    Jan 1, 1994

  • AUSIMM
    Modern Prospecting on an Industrial Scale

    MR. W. E. WAINWRIGHT occupied the chair, and in introducing the lecturer said, on account of the absence of the vice-president, it fell to his lot to introduce the lecturer. Mr. Tennberg, he said, was

    Jan 1, 1930

  • AUSIMM
    The Use of Common Business Intelligence and Analytics Tools in the Operation and Optimisation of Iron Ore Process Plants

    By T Nassis, P Louw, M R. Fry, T du Toit

    Business intelligence (BI) and business analytics (BA) are established IT technologies that are used extensively in the business environment. This paper discusses the use of these technologies in prod

    Jul 13, 2015