Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Zealand's Steel Industry and Other Mineral Developments

    Government established and financed the NZ Steel Investigating Co in 1960. Its investigations showed that a steel industry was feasible and desirable based uponNorth Island titanomagnetite ironsands,

    Jan 1, 1993

  • AUSIMM
    Fusion of molten phase R&D into the metallurgical industry to drive circularity

    By S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows

    The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability

    Aug 21, 2024

  • AUSIMM
    Measuring spatial domain models’ uncertainty for mining industries

    By S A. McManus

    With the advances in software speed and capability, many of us now are running multiple scenarios on entire models rather than just testing small areas or a few blocks. In the authors experience both

    Mar 22, 2022

  • AUSIMM
    Accelerated aging testing of geomembranes for tailings liquor

    By J Folwell, G Phillips, F Gassner

    Geomembranes selected for various applications often start with considering target properties developed by industry organisations such as Geosynthetic Research Institute (GRI), and test methods develo

    Jul 1, 2021

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    A Simulation Approach for Improving the Assessment of Closure Risks

    By D Trembath

    "One of the key risks to the success of a mining operation is the accuracy of the estimates of both the economic mineral and any accompanying contaminants contained within the ore reserve. Misrepresen

    Jun 28, 2016

  • AUSIMM
    Geotechnical Reporting at Olympic Dam Mine

    The need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech

    Jan 1, 2004

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment

    By L Nienaber

    Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper

    Mar 8, 2011

  • AUSIMM
    Situational 3D variography – determining the variogram in the context of geology

    By P Gleeson, J Coombes, P Suresh, T McLennan

    The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u

    Sep 20, 2017

  • AUSIMM
    Algebraic optimisation of excavation alignment using the stress tensor

    By P B. Hills

    A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T

    Nov 29, 2022

  • AUSIMM
    ROES® – Automated Rock Extraction

    By I Gipps

    A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur

    Nov 22, 2011

  • AUSIMM
    Relationship Between Degree and Cost of Crushing and Flotation Recoveries of North Lyell Ore

    IN all wet concentration processes it is of primary importance to determine to what degree the crushing must be carried in order to obtain the maximum profit per ton of ore milled.To effect a clean se

    Jan 1, 1927

  • AUSIMM
    The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine Closure

    By A Hutton, C Dick, D Fletcher

    Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks

    Jul 10, 2012

  • AUSIMM
    Social Licence to Close?

    By J A. Braithwaite

    Social licence to operate is not a new concept for the mining industry, referring to stakeholder approval or acceptance for the activities and impacts of a project, company or industry. It is intangib

    Jun 28, 2016

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    Take 5 – hero or villain

    By M Hassall, E Humphries

    Personal risk assessment processes, also known as Take 5 or SLAM (Stop, Look, Assess, Manage) have been utilised in high hazard industries for over 30 years. However, there is limited research to unde

    Apr 16, 2024

  • AUSIMM
    The perfect storm – mine closure in the Latrobe Valley Victoria

    By A Scrase, J Brereton

    The Latrobe Valley is located approximately 150 kms east of Melbourne. Within a very small area there are 3 large brown coalmines and associated power stations, 3 large towns, and numerous smaller tow

    Aug 2, 2023

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018