Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    From Voluntary Codes to Certification

    More than in any other way, the community judges the minerals industry by its environmental performance. Minerals Council of Australia web site www.minerals.org.au/media/code Time is overtaking us. Wh

    Jan 1, 2000

  • AUSIMM
    Effective Blast Engineering

    Of all of the processes in the mining cycle, blasting has the greatest impact on the efficiency of both mining itself and the initial stages of ore processing. The cost of blasting can be readily acco

    Jan 1, 1999

  • AUSIMM
    Water Management Issues for Mining Proposals at the Environmental Impact Assessment Stage

    An Environmental Impact Statement (EIS) for a major mining development typically has to address various aspects of surface water management, including some which generally tend to be the more contenti

    Jan 1, 2003

  • AUSIMM
    Mining and the Environment

    Opinions vary widely within the community on what are legitimate environmental social respon- sibilities. The extreme conservationists see the responsibility as the total preservation of the natura

    Jan 1, 1978

  • AUSIMM
    Use of Large Twin-Power Scrapers in Prestrip Operations (5b96252c-a8e3-4454-b0d8-e41ea665d004)

    The use of scrapers in mining and earthmoving operations is not new; in fact they are one of the earliest methods of bulk earthmoving. A single machine, which can load, haul, and dump material with a

    Jan 1, 2003

  • AUSIMM
    Moving beyond Net Present Value project evaluation to achieve Environmental, Social and Governance goals for mine operations and closure

    By H Simpson, C Gimber

    The financial evaluation of mining projects drives a whole range of decision-making regarding project viability, project design, operating models and closure philosophy. Net Present Value is a financi

    Aug 2, 2023

  • AUSIMM
    University Perspectives on Geological Education

    Universities have had a long history in the education of geology graduates, Analysis of this history reveals a record of success, as judged on a world basis. However there have been significant chan

    Jan 1, 1986

  • AUSIMM
    The Break Up of Recoverable Reserves at High Cut-offs

    By Armstrong M, Kleingeld W. J

    Current low prices for many metals mean that deposits have to be mined at high cut-offs (relative to their mean grade), which means that only a small percentage of mining blocks are above cut-off.

    Jan 1, 1995

  • AUSIMM
    Fundamental Technology Change in the Iron and Steel Industry

    The world is getting flatter through internet, mobile phone technology, relatively low cost travel, massive outsourcing of manufacturing to China and the transfer of company backroom operations to Ind

    Jan 1, 2006

  • AUSIMM
    Back to basics: resourcing the mining industry

    By S Dunbar, S Harrison, J Cilliers

    ‘Those who cannot remember the past are condemned to repeat it.’George Santayana (16 December 1863 in Madrid, Spain to 26 September 1952 in Rome, Italy). Philosopher, essayist, poet and novelist.The m

    Aug 29, 2018

  • AUSIMM
    Where is the Risk in Coarse Gold Projects? - ABSTRACT ONLY

    This presentation addresses the sources and weighting of project risk in coarse gold deposits with relevance to experiences at the Ballarat mine and Castlemaine goldfield. With sample representation a

    Aug 1, 2010

  • AUSIMM
    It’s all about People - Abstract

    By K D. Tuckwell

    The Treasurer, the Hon Wayne Swan, has nominated ‘maximising our advantages’ from ‘Mining Boom Mark II’ as the focus of the 2011/2012 Australian Budget. Australia therefore requires a bolder and bette

    Nov 22, 2011

  • AUSIMM
    Bingham Canyon Mine – from adversity to excellence

    By M Robotham

    In April 2013, Rio Tinto Kennecott Copper’s (RTKC) Bingham Canyon mine experienced what is arguably the world’s largest ever in-pit slope failure. The failure initiated along a major, continuous, low-

    Nov 30, 2018

  • AUSIMM
    Stop investigating everything! How to classify events to maximise organisational learning and reduce systemic risk

    By M Alston

    Organisations’ incident classification processes are plagued by the overclassification of events, often leading to excessive workloads and suboptimal outcomes. This presentation addresses the pressing

    Apr 16, 2024

  • AUSIMM
    A decision framework for comparison of coal void rehabilitation options

    By A Hocking, S Henderson

    Commonwealth of Australia (2016) defines rehabilitation as comprising “the design and construction of landforms as well as the establishment of sustainable ecosystems or alternative vegetation, depend

    Jul 25, 2018

  • AUSIMM
    "Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"

    By Y Xie, L O’Connor, S C. Dominy

    "Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil

    Jun 15, 2016

  • AUSIMM
    Contour banks in spoil rehabilitation – a matter of timing

    By J L. Merritt

    Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t

    Jul 25, 2018

  • AUSIMM
    Relocating Waihi's Cornish Pumphouse

    WaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant

    Jan 1, 2006

  • AUSIMM
    Effect of Dynamic Pressure on Electronic Detonator Timing

    By R Ibarra, H Solis, G Teowee, B E. Papillon

    The authors have previously described a piezoelectric-based system to measure the dynamic pressure during actual detonation in the field. This technique is used in a water hammer test set-up where a d

    Aug 24, 2015

  • AUSIMM
    Blast Engineering ù An Explosive Career

    This presentation is a 20 minute snippet of my professional career, and my progression in the mining industry, from a lazy uni student to an up-and-coming blast engineer in the middle of a mining boom

    Jan 1, 2006