    Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia

    By M Fitzgerald

    Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development

    Aug 22, 2011

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside Tunnels

    By A G. Sheard

    Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t

    Mar 8, 2011

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    Underground Organization

    IN the underground department of a mine, we may fairly say that "good management is based upon three elementals: first, sound engineering; second, proper coordination and efficiency of every huma

    Jan 1, 1912

  • AUSIMM
    Auxiliary ventilation design – why and how mines waste so much power on inferior systems

    By D J. Brake

    There has been a strong trend over the past decade in hard rock mines towards the use of very high powered auxiliary (or secondary) fans; in many mines, the installed power for the secondary ventilati

    Aug 28, 2017

  • AUSIMM
    The Taranaki Oil-Field

    THE Taranaki oil-field is situated on the western side of the North Island of New Zealand, at about its widest part, and may be said to be the most compact and fertile part of the Dominion, for, with

    Jan 1, 1912

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • AUSIMM
    Notes on the Phillips River Gold and Copper Field

    THE Phillips River gold and 'copper field is situated on the south coast of Western Australia, about 200 miles east of Albany, 180 miles west of Esperance, and: 250 miles south of Southern Cross,

    Jan 1, 1917

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Do We Need to Change the Way We Set Up the Stage?

    By A Datar, D Mulligan

    The extractive phase of broad-scale mining can have major impacts on landscapes and associated ecosystems. Post-mining ecological rehabilitation typically starts with reconstructing topography. A fair

    Jul 16, 2014

  • AUSIMM
    Walk or Talk - Is the Current Mine Approval Process in Queensland Delivering Rehabilitation and Closure Success?

    By T Baumgartl, R I. Maczkowiack, O White, P D. Erskine

    Queensland legislation, industry codes and policies relating to mine rehabilitation and closure create the expectation of successful progressive rehabilitation and that the post-mining environment is

    Jul 10, 2012

  • AUSIMM
    Mill Modelling Using an Extensible Station-Based Framework

    By E A. Gunn, J Zhou

    In this paper a project to develop a joint optimisation/simulation model for production planning in a mine-mill complex is presented. The system involves a mill receiving ore from a number of differen

    Sep 26, 2011

  • AUSIMM
    Dependence of the variance of lot average on the sampling mode and heterogeneity type of the lot

    By P Minkkinen

    "Pierre Gy showed in his early works that the results in estimating the variance of the mean value of continuous lots depends on sampling mode (random, stratified or systematic), except in the theoret

    May 9, 2017

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014

  • AUSIMM
    Modelling of Multiple Narrow Veins from Geology to Mining - the Tasmania Reef, Beaconsfield, Tasmania

    By P B. Hills

    This paper discusses the computerisation of the drill hole database, some historical records and the creation of a three-dimensional model of the gold bearing structures for resource estimation and mi

    Jan 1, 1999

  • AUSIMM
    The Case for an International Mining Law

    State ownership of minerals results in domestic legislation regulating mining operations. The mining industry today is dominated by a number of transnational companies, each subject to internal and ex

    Jan 1, 2004

  • AUSIMM
    The Composition of the Lead-Zinc Ores at Captain's Flat, NSW, II

    By Baker G

    The detailed mineral composition of the lead-zinc ores at Captain's Flat was first studied in 1942 (Edwards, 1943).At that time the workings did not extend far below the 750ft. level. Since then

    Jan 1, 1953

  • AUSIMM
    Renewed Exploration in Canada's Premier Iron Ore District - Labrador West

    By J OÆDriscoll, R Butler, L Winter

    The iron ore mining district of Labrador West and adjacent Quebec is Canada's largest iron ore producer with almost 50 years of production. The area is currently experiencing a period of renewed

    Jan 1, 2009