Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design of Copper-Cobalt Hydrometallurgical Circuits

    Copper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni

    Jan 1, 2008

  • AUSIMM
    Differences of Opinion in the Recent Geological Report on Broken Hill, N.S.W.

    IN the recent monograph on Broken Hill, N.S.W., by E. C. Andrews,* two independent petrological reports appear as Appendices 1 and n, by W. R. Browne and F. L. Stillwell respectively. In these conside

    Jan 1, 1924

  • AUSIMM
    Improving Geological and Metallurgical Understanding of Plutonic Gold Mine, Western Australia, using Three-Dimensional Visualisation of Portable X-Ray Fluorescence Data

    By M F. Gazley

    The amphibolite-facies metabasaltic rocks of the Mine Mafic Package at Plutonic Gold Mine, Marymia Inlier, Western Australia, contain an estimated total endowment of 12.2 Moz of Au, which includes 4.7

    Aug 22, 2011

  • AUSIMM
    Lihir Gold Limited - A Large Step Forward for the Lihir Gold Operation

    By D Akis, A Clark

    The Lihir gold operation, located in the New Ireland Province of Papua New Guinea (PNG), approximately 900 km north of Port Moresby, was commissioned in 1997 under the management of the Lihir Manageme

    Jan 1, 2009

  • AUSIMM
    Terranes, Tectonics and the Pacific Rim

    The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th

    Jan 1, 1990

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Trial of 14/12 millMAX <sup>TM</sup> Pump in the Ok Tedi Grinding Circuit

    By O K. Paki

    A 14/12 millMAXTM pump was installed in the SAG1 grinding circuit as a trial replacement for the existing 12/10 Warman for performance comparison and in an attempt to overcome process difficulties. Kr

    Jan 1, 2000

  • AUSIMM
    O and C Isotope Study of Bastnäs-type Rare Earth Element Mineralisation, Bergslagen, Sweden

    By F Sahlström, E M. Jolis, V R Troll, E Jonsson, K Högdahl, C Harris

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Bastnäs-type magnetite-skarn-hosted rare earth element (REE) mineralisations are locate

    Mar 18, 2015

  • AUSIMM
    Pegmont: A Stratiform Lead-Zinc Deposit in the Precambrian of Northwest Queensland

    Stratiform lead-zinc mineralization at the Pegmont prospect occurs as a 4-6 m thick body interbedded within arkose, schist, amphibolite, and pegmatite of the Kuridala Formation in the Eastern Belt of

    Jan 1, 1977

  • AUSIMM
    Equipment Application to the Smaller Underground Mining Operations

    Mining companies in order to compete and succeed in being viable business propositions must look to the future and select mining methods which guarantee improved efficiency and productivity as well as

    Jan 1, 1990

  • AUSIMM
    Metallurgical Operations at the Yabulu Nickel Refinery of Queensland Nickel Pyt. Ltd.

    Geologists employed by Metals Exploration Pty. Ltd. discovered nickel enrichment at Greenvale, 180 kilometres West of Townsville, in 1967. Subsequent drilling proved an ore body containing 45 milli

    Jan 1, 1978

  • AUSIMM
    An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia

    By C F. Stokes

    The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)

    Aug 22, 2011

  • AUSIMM
    The Development of Mining Machinery for Underground Work - Factors of Success

    Competition in the mining industry is the main driving force for both equipment manufacturers and end users to develop and apply the most cost efficient solution to a mining problem. Therefore the cha

    Jan 1, 1991

  • AUSIMM
    Advances in the <i>MillMapper</i> Technology for Grinding Mill Liner Thickness Gauging

    By D Lichti

    This paper presents recent advancements in the MillMapper software technology, developed and used for thickness gauging of liners of cylindrical grinding mills used for mineral comminution. MillMapper

    Jan 1, 2007

  • AUSIMM
    The Education Factor

    By Lynch A. J

    The success of the Australian mining industry depends on the quality of its skills. High quality skills supported by a culture which demands success lead to innovations, good practices and prosperit

    Jan 1, 1995

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    The Geometry of Mineralisation and Exploration Models for the Blackwater Mine in the Reefton Goldfield

    At Waiuta near Reefton there is a remarkable vein of quartz &lt;1 m thick which, apart from small offsets on late-stage faults, is a sheet like body essentially continuous down-dip and along-strike fo

    Jan 1, 2000

  • AUSIMM
    The Application of Hydromechanical Mine-scale Modelling for Large Block Caving Operations

    By A Flatten, F Reusch

    Recent advances in the disciplines involved in simulating large mining operations provide increasingly precise and accurate methods for the study of cave mechanics; however, in large regional-scale mo

    May 9, 2016

  • AUSIMM
    Cleaner circuit optimisation at Cadia Operations

    By J Seppelt, B Akerstrom, J Bubnich, D Seaman, T Waters

    The Cadia Hill concentrator at Newcrest’s Cadia Operations has undergone several modifications and upgrades to treat an increased throughput rate of harder ore from the Cadia East block cave mine.Subs

    Aug 29, 2018

  • AUSIMM
    Enterprise Bargaining and Agreements Under the Workplace Relation Act, 1996 and their Appreciation to the NSW Coal Mining Industry

    The Australian industrial relations system is in a state of constant change. We are undergoing a transformation from a compulsory arbitration and an award based system to one which is fundamentally ro

    Jan 1, 1998