Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Review of Trailings Dam Design and Construction Techniques in North America

    There are many factors influencing the way in which a mining company disposes of tailings. Some of the more important factors include physical and chemical properties of tailings, cost, availabilit

    Jan 1, 1989

  • AUSIMM
    Intersection reinforcement with self-drilling anchors for improved productivity at Kanmantoo

    By J Jardine

    An improved ground support method for development intersections, wide spans and stope brows was implemented at Kanmantoo mine. The method uses a jumbo to simultaneously drill and install self-drilling

    Mar 29, 2023

  • AUSIMM
    The Geology of the Golden Cross Orebody - Complex Veining and Evolving Mining Responses

    By W C. Cook, S J. Mathews, A H. Purvis

    The Golden Cross Gold Mine is located at the head of the Waite kauri Ri ver, 8 km northwest of Waihi near the southern end of the Coromandel Range. The mine produces gold and silver from epithermal ve

    Jan 1, 1993

  • AUSIMM
    Mining and the Environment

    Opinions vary widely within the community on what are legitimate environmental social respon- sibilities. The extreme conservationists see the responsibility as the total preservation of the natura

    Jan 1, 1978

  • AUSIMM
    The Occurrence of Gold Antimonide in the Antimony Veins of Costerfield, Victoria

    Gold in the stibnite veins of Costerfield, Victoria, was described in 1922 1, prior to any mineragraphic examination, as (a) free yellow gold (b) free rusty gold and (c) combined gold. The free yellow

    Jan 1, 1952

  • AUSIMM
    A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industry

    By M Haest, O Dominguez, D Mittrup

    Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn

    May 9, 2017

  • AUSIMM
    Survey Work in Connection with the Sinking of No. 7 Shaft, Broken Hill South Limited, Broken Hill, N.S.W.

    THE South Mine. owned by the Broken Hill South Limited, occupies mineral leases 7 and 8 on the Broken Hill lode. The ore reserves are 4,250,000 tons, and the ore hauled for the year ended June, 1930,

    Jan 1, 1930

  • AUSIMM
    Shifting the Cultural Paradigm for the Prevention of Catastrophic and Fatal Events

    By R Russell

    The relative infrequency of fatalities and other serious events can give them an appearance of being random, of being beyond any reasonable degree of anticipation and prevention. In fact, the vast maj

    Nov 20, 2012

  • AUSIMM
    Algebraic optimisation of excavation alignment using the stress tensor

    By P B. Hills

    A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T

    Nov 29, 2022

  • AUSIMM
    High-Speed Motion Picture Photography Analysis in 3D - A New Approach to Analyzing Full Scale Blasts

    By Vanderberg B

    A 3D, PC based computer program is currently under development by Blasting Analysis International, Inc., to analyze the kinetics of full scale blasts with two or more high-speed motion picture camer

    Jan 1, 1990

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°C

    By E Jak, G Khartcyzov, M Shevchenko

    The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco

    Jun 19, 2024

  • AUSIMM
    The Utilization of Manganese Ore Fines by Sintering at Temco, Tas.

    By Nash B. G W

    In June 1976 a 600'tonne/day manganese ore sinter machine, with on-strand cooling, was commissioned at the plant of Tasmanian Electro Metallurgical Company Pty. Ltd. at Bell Bay, Tasmania. Thi

    Jan 1, 1977

  • AUSIMM
    Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New Zealand

    By R H. Sibson

    The gold

    Jan 1, 1995

  • AUSIMM
    Processing Operations at Sino Guizhou Jinfeng Mining Limited's Jin Feng Plant

    By Y Yang, J Skrypniuk

    The Jinfeng mine is Sino Gold's flagship project and is the second largest gold mine in China. Sino Gold Limited (SGL) holds 82 per cent equity in the Sino-Foreign joint venture Sino Guizhou Jinf

    Jan 1, 2009

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Application of Gas Suspension Calciner in Relation to Bayer Hydrate Properties

    By Nickelsen J, Theisen KG, Hansen PH

    The use of stationary calciners in the processing of aluminium hydroxide has emphas- ized the importance of Bayer hydrate properties with respect to particle breakdown during calcination and subsequ

    Jan 1, 1981

  • AUSIMM
    The Selective Flotation of Xenotime from Heavy Minerals

    By H Hutchinson

    Froth flotation is applied to mineral sand concentrates in order to produce commercially viable xenotime concentrates. Experiments indicate that a xenotime product containing 38% Y2O3 at 47% recovery

    Jan 1, 1990

  • AUSIMM
    The Dilemma of Gold Companies

    Thank you for your introduction and the opportunity to speak at such an important forum. I feel honoured to be the Tas McKee speaker for this yearÆs conference. I can honestly say that Tas McKee typif

    Jan 1, 2006

  • AUSIMM
    Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to Implementation

    Tailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of

    Jan 1, 2009