Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Creep Due to Chemical Alteration of Rocks – A Case Study in Brown Coal

    By B J. Wight, R Mackay, S Kim

    Improving the understanding of the processes governing ground movements in and around brown coal open cuts is of significant interest for both operating stability and rehabilitation. Brown coal, ligni

    Nov 5, 2014

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • AUSIMM
    The Art of Coarse Mining

    As an Inspector of Mines in Queensland, my main responsibilities include the enforcement of the Mining Act 1968 - 1986, the Mines Regulation Act 1964 - 1983 and the Metalliferous Mining regulation

    Jan 1, 1989

  • AUSIMM
    Latest Developments in HPGR Technology ù Results of a Field Trial

    By N Patzelt, T C. Logan, I B. Klymowsky

    In 2003, NEWMONT MINING CORPORATION, the worldÆs largest gold producer, set out to prove that High Pressure Grinding Roll (HPGR) technology is sufficiently robust and reliable to be considered for the

    Jan 1, 2004

  • AUSIMM
    Development of the Zafranal Geometallurgical Model

    By G Harbort

    The use of geological data for optimisation of operating plants has become a significant part of the modern process mindset. The underlying principle is to convert spatial geological data into metallu

    Sep 5, 2011

  • AUSIMM
    Computers in Metalliferous Underground Mine Planning Where Are We? Where Are We Going?

    Computerisation of mine planning activities, specifically in the areas of geology, design and surveying, has been in progress for a number of years in underground metalliferous mines. The combined c

    Jan 1, 1995

  • AUSIMM
    The impact of ventilation on demand on impeller fatigue life

    By L Salvestro

    Ventilation on demand (VOD) has been demonstrated to significantly reduce operating costs for ventilation fans, by reducing fan output to meet demand. The most effective method for reducing operating

    Oct 12, 2022

  • AUSIMM
    The influence of roadway configurations on VCD and bulkhead design

    By M Salu

    Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme

    Oct 12, 2022

  • AUSIMM
    Near-Infrared Spectroscopy (NIRS) Sorting in the Upgrading and Processing of Skorpion Non-Sulfide Zinc Ore

    Near-Infrared Spectroscopy (NIRS) Sorting in the Upgrading and Processing of Skorpion Non-Sulfide Zinc Ore In 2008 Anglo American sponsored a research project at RWTH Aachen University to assess the

    Sep 13, 2010

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Sulfur distribution ratio in iron and steelmaking slags

    By R G. Reddy, A Yahya

    The sulfur distribution ratio (Ls) is an expression of the amount of sulfur in slag to the amount of sulfur in molten metal. The sulfide capacities calculated from Reddy-Blander (RB) model were used t

    Aug 21, 2024

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Paper No. 191. Notes on The Great Fitzroy Mines Limited.

    THE Great Fitzroy Mines Limited, comprising an area of 183 acres, and held under lease, are situated at Mt. Chalmers, within the Cawarral goldfield, 18 miles from the city of Rockhampton, Queensland,

    Jan 1, 1911

  • AUSIMM
    The Central Eyre Iron Project – Process Selection and Design

    By D Connelly

    The Iron Road Limited Central Eyre Iron Project (CEIP) area, located on the Eyre Peninsula of South Australia, covers extensive Archaean iron formations that occur as coarse-grained magnetite bearing

    Jul 11, 2011

  • AUSIMM
    Recent Legal Developments Affecting The Future for Exploration & Mining

    The Court rejected the suggestion that CRAE had actively misled DMR concerning the worth of its tenements. The Court agreed that CRAE remained silent about certain significant information concerning

    Jan 1, 1990

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Enhancing Water Efficiency Through Regional Cooperation - The Case of Kwinana

    By R van Berkel

    Regional synergies concern the capture, recovery and reuse of by-products, water and energy between industrial operations in close proximity. The Centre for Sustainable Resource Processing (CSRP) unde

    Jan 1, 2006

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Leadership - The Passion that Makes it Happen

    As an older member of The AusIMM, I received my 30 year æPearl AwardÆ in June and had my 50th birthday two weeks ago, I am honoured to be here today. I thank those responsible for their confidence in

    Jan 1, 2007

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021