Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Facing the Post-Industrial EraGiving the keynote address in the final session of a conference dealing with closely related topics has a disadvantage in that much of what can be said has been said. It also has an advantage, how
Jan 1, 1978
-
The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New ZealandBy T J. McGavin
This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm
Sep 17, 2014
-
The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken HillA Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r
Jan 1, 1988
-
Installation of an Underground Dispatch System and its Use in Business Performance Management Within OsborneÆs Mining DepartmentWithin the Business Process Improvement Program initiated at Placer Dome during 2003 was the Business Performance Management Project (BPM).BPMÆ s aim has been to extract productivity improvements from
Jan 1, 2005
-
Some Geological Investigations Into A Fossil River System in the Roof Strata of the Bulli Seam, Southern Coalfield, N.S.W.By Driver R. C, Moelle K. H R
This paper is dedicated to the memory of our friend Peter McKenzie who contributed much to the knowledge of the New South Wales Coalfields.ABSTRACTA fossil river system was recently mapped over parts
Jan 1, 1967
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case studyBy P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
Innovations in underground hard rock operator efficiency – through simulation-based training technologies and processesBy J A. de la Torre, I R. Cerna, G K. Karadjian
The La Colorada underground mine in Zacatecas, Mexico is a mechanised cut-and-fill silver mine with a capacity of 1250 t/d. The project focused on training the mine’s experienced operators for a fleet
Oct 16, 2017
-
Observations on the Zinc-Lead Lode at Rosebery, TasmaniaThe zinc-lead lode at Rosebery, on the West coast of Tasmania, has a total length of over 4000 ft. It consists of five elongated lenses parallel to the foliation planes of the quartz sericite schist,
Jan 1, 1934
-
Microalgae in mining – environmental and social opportunitiesBy A E. Levett, J Durbin
The environmental, social and governance (ESG) obligations of mining companies promote the consideration of water and land resources as well as the post-mining employment opportunities following the c
Aug 2, 2023
-
The Influence of Elements on the Properties of Lead Part X. The Influence of MagnesiumBy Met M, Orr C. W, Met B. E
As was mentioned in the last paper of this series(l), magnesium was added to lead with the idea that it would act as a de-oxidiser. The magnesium lead alloys give rise to an inter-metallic compound of
Jan 1, 1939
-
Mining for Water - Partnering for Sustainable Water Use in Semi-Arid RegionsBy N Lefebvre, M Jakeman, R Aseervatham
Semi-arid regions suffer from two afflictions; evaporation may exceed precipitation by multiples of two or more and variations in precipitation can be both extreme and difficult to predict. Many Austr
Jan 1, 2006
-
Heat Load Estimation from Conveyor Systems in Mass MinesBy R Moreby, J Kok, L van den Berg
The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems
Aug 31, 2015
-
The Impact of Copper Activation on the Scavenging of Ni-Cu Sulfide OresBy C Tukel
Copper sulfate is traditionally used to activate various types of sulfide minerals. The list of users includes Falconbridge Sudbury operations, where copper sulfate solution is added to the pyrrhotite
Jan 1, 2005
-
Application of sensor-based-sorting technology at pilot plants in South AmericaBy T Soares, P Esteves, C Senna, V Souto, E Dias
Steinert provides a wide portfolio of Sensor Based Sorting (SBS) technologies, including the possibility to combine different sensor data in the development of the separation applications. This multi
Nov 10, 2020
-
A standardised method for the precise quantification of practical minimum comminution energyBy D K. Weatherley, G R. Ballantyne, S Ali, M Yahyaei, M S. Powell
This paper explores development of a novel ore characterisation method for the precise measurement of practical minimum comminution energy. A monolayer of particles with a narrow size distribution is
Aug 24, 2022
-
Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore MineBy D Matthews
With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The
Jul 11, 2011
-
Improving the performance of blind uphole rises at Ernest Henry Mine – a case studyBy T Purvis, Z Liu
Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro
Oct 16, 2017
-
An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, AustraliaThe Department of Mineral Resources is the lead agency in mine site environment management and control in New South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managem
Jan 1, 1995
-
A Study on the Cycle of Movable-Screen JigsBy Sun Yubo
A basic method for designing reasonable jig cycles for movable-screen jigs is presented in this paper. The reliability and effectiveness of the designed jig cycle was verified with tests performed o
Jan 1, 1993
-
Modelling Bulk Density ù The Importance of Getting it RightTonnage and grade are the principal reported components of mineral resource estimates but tonnage is a derivative of two more fundamental estimates; volume and bulk density. Typically, most of the eff
Jan 1, 2000