Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recovery of the Undercutting Front in a Mine with Conventional Panel Caving – Case Study at North Reserves Sector, El Teniente Mine

    By N Rivera, A Music, C Cisternas

    In an underground mine operated with panel caving and subjected to high stresses, geotechnical events such as collapses or rock bursts are fairly recurrent. Both situations can involve risks for peopl

    May 9, 2016

  • AUSIMM
    The Operation of Queensland Alumina Limited

    An international raw material partnership, a $164 million 900,000 long ton per year aluxAna plant; an ideal location at Gladstone, Queensland, Australia - this is Queensland Alumina Limited, on strea

    Jan 1, 1969

  • AUSIMM
    Geochemical and Isotopic Constraints for High-Grade Gold Mineralisation at Waitangi Deposit, Thames District, Coromandel Peninsula, North Island, New Zealand

    By S Henderson

    The Thames gold-silver deposits are part of the Hauraki goldfield, situated within the Miocene to Pliocene calc-alkaline Coromandel Volcanic Zone (CVZ). The Waitangi vein system is one of the minerali

    Jan 1, 1993

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Water Management Systems in Australian Mines

    By Gillies A. D S

    Replies to a comprehensive questionnaire on mine water resource management systems (WRMS), which were distributed to a selection of Australian mining operations in 1991, are analysed. Although the rep

    Jan 1, 1995

  • AUSIMM
    Developments in Mining Resource Rent Taxation

    A resource rent taxation scheme is based on the concept of taxing the rent or surplus profit generated from primary industry activity. Rent has been defined as profits that remain after deduction of c

    Jan 1, 1990

  • AUSIMM
    Geohazmap Implementation in Block Cave Mines

    By S Talu, E Savage, S Howe

    Major falls of ground, strainbursts, airblast and mudrush events are the major hazards in block caving environments, resulting in both safety and financial consequences and losses. Rio Tinto mines hav

    May 9, 2016

  • AUSIMM
    Electrical and Radiometric Logging of Mining Exploration Drill Holes in the Woodcutters Area, Rum Jungle District, N.T.

    Except for uranium search, conventional oil well logging techniques are relatively little-used in mining exploration. The main reasons for this are cost and an apparent lack of awareness of the potent

    Jan 1, 1978

  • AUSIMM
    The Discovery and Early History of the Mt Leyshon Gold Deposit, North Queensland

    By J E. Lynch

    The Mt Leyshon gold deposit produced in excess of three million ounces of gold and considerable silver over a period of approximately 130 years. Most of this production occurred between 1987 and 2001.

    Jan 1, 2004

  • AUSIMM
    Porphyry Type Gold Mineralization in Shoshonite at Vunda, Fiji

    Disseminated gold mineralization in the Vunda River area 12 km SE of Lautoka in Viti Levu occurs sporadically in shoshonite volcanics within an alteration area of some 6 km2. No definite intrusions ha

    Jan 1, 1978

  • AUSIMM
    TBM Design and Performance of Today - A Rapid Development - Where Will it End?

    The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more

    Jan 1, 1993

  • AUSIMM
    Advances in Regolith Research ù A CRC LEME Perspective

    By R R. Anand

    Recent research by CRC LEME from an Australian mineral exploration perspective, has focussed on regolith architecture and mechanisms of geochemical anomaly formation, within transported regolith. Meth

    Jan 1, 2004

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    The Care and Maintenance of Winding Ropes and Attachments, as Practised at the South Mine, Broken Hill, N.S.W.

    By Howell M. W

    The purpose of this paper is to outline the main points in the construction of the various types of wire ropes more commonly used for winding in Australia; and the maintenance of the ropes, and cage a

    Jan 1, 1940

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    The Significance of Superincumbent Strata Stiffness and its Impacts on Coalmine Design

    By J M. Galvin

    The traditional engineering approach to assessing stability is based on comparing resisting force (capacity) to driving force (demand), or strength to working stress. In underground coal geomechanics,

    Nov 5, 2014

  • AUSIMM
    A phenomena-based model to investigate the possibility of scrap melting in an Open Slag Bath Furnace (OSBF) for green ironmaking

    By S van der Sluijs, M van Ende, Y Tang, A Emami

    This paper presents a phenomena-based model for investigating the possibility of scrap melting in an Open Slag Bath Furnace (OSBF) for green ironmaking. The goal of this study is to enhance the circul

    Jun 19, 2024

  • AUSIMM
    Development and Construction Update of the Grasberg Block Cave Mine

    By A T. Yuniar, C A. Brannon, N D. Pascoe, H H. Firdausi

    This paper describes the key components of the Grasberg Block Cave (GBC) mine design and the development and construction status of the mine. Drawpoint production from GBC will be initiated in 2018 fo

    May 9, 2016

  • AUSIMM
    Selection of Entrainment Control Processes in Copper Solvent Extraction Plants

    By K Dudley, D Readett

    The design of entrainment control processes in copper SX plants has been studied by use of models based on achievable plant performance. A number of alternatives have been assessed for their suitabili

    Jan 1, 2002