Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
McKee Memorial Address - Investment in Mining PeopleMr. Chairman, distinguished guests, ladies and gentlemen. Thank you for asking me to your conference, with its most fundamental and appropriate topic of 'Investment in Mining'. I must conf
Jan 1, 1988
-
Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central QueenslandBy T Laurencont
The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham
Jan 1, 2003
-
The Pitfalls of Exploring a Shallow Dipping Orebody at Depth ù A Case Study, Otter/Juan Mine, Kambalda, WAExploring for deep shallow dipping orebodies can be very expensive and very difficult. Surface exploration is often not an option and obtaining the best location for underground drilling can cause pro
Jan 1, 2003
-
An Investigation of Factors Affecting the Long-term Reliability of Extraction Level Pillars in Deep Block and Panel CavesBy P Duplancic and C R Lilley, R Hudson, D Beck
For deep block and panel caving mines, undercut or extraction level instability can have as much impact on overall recovery as underbreak or the premature ingress of waste. If the area of the mine aff
May 9, 2016
-
The impact of the weighting errorBy G J. Lyman
In sampling a process stream, conventional sampling theory deals only with the variation of the analyte content and neglects the impact of the variation in the mass flow on the sampling variance, whet
May 9, 2017
-
Chamfered backs to improve open stope stability in poor ground conditionsBy G Capes
A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann
Mar 29, 2023
-
Emerging Market Risk - Perceptions and RealityBy N Robson, E Stephens
Australian mining companies are actively exploring for and developing mineral deposits throughout the world with interests in emerging markets such as Africa, Asia and South America. It is important t
Jan 1, 2007
-
Application of Lifecycle Assessment to Mineral Sector Sustainable Development ù Developing Sustainability IndicatorsNo one process, product or effect of the minerals sector can be viewed in isolation when addressing sustainable development. Meaningful assessments of the minerals sector require that its processes an
Jan 1, 2002
-
Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines OperationBy T Howard, J E. Everett
BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc
Jan 1, 2002
-
Benefits Related to Applications of a Mass Blast in Open Cut MiningBy C Muñoz, N Ortega, J Vergara, D Avilés
Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b
Aug 24, 2015
-
Yilgarn Star ù Just in Time Methodology ù Planning and Scheduling ImplicationsBy G Haywood
This paper presents the evolution of the planning, scheduling and mining practices at the Yilgarn Star underground. The paper will concentrate on the principals of æjust in timeÆ and the impact of suc
Jan 1, 2002
-
Gippsland Basin South Platform: Unprospective or Underexplored?I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r
Jan 1, 1992
-
Variation in the Composition of Seam Gases Issuing from CoalBy Hargraves A. J, Smith J. W
Experiments conducted at Tahmoor Colliery, Sydney Basin, have demonstrated the variability in chemical and isotopic composition of seam gases issuing from boreholes in the Bulli seam and desorbing fro
Jan 1, 1987
-
Developing a Water Accounting Framework for the Australian Minerals IndustryBy K Ringwood, J Cummings, C J. Moran
The development of a water accounting framework that enables consistent and contextual reporting of minerals operationsÆ water use, represents a key sustainable development objective that many Austral
Jan 1, 2009
-
Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation DataBy F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz
A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical
Sep 29, 2013
-
Pipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric FieldPipe Flow Stability of Concentrated Coal-Water Suspensions in the Presence of an Electric Field
Sep 13, 2010
-
The Use of Gravity as an Exploration Tool for the Robertson Range and Davidson Creek Iron Ore Deposits, East PilbaraBy R McCarthy, P Darvall
FerrAus Limited's Robertson Range and Davidson Creek iron ore projects are located on the far eastern margin of the Hamersley Province, approximately 100 km to the east of Newman, Western Austral
Jan 1, 2009
-
Mining in Papua New Guinea - an Internal Revenue Commission PerspectiveIn November 1992, the Internal Revenue Commission (IRC) was formed from the rperggr of the Papua New Guinea Taxation Of- fice (PNGTO) and the Bureau of Customs, and now has the re- sponsibility for t
Jan 1, 1997
-
Concentration of Silver-Lead OresThe following brief paper is intended, to apply to the concentration of the silver-lead ores at Broken Hill, New South Wales, generally, but more particularly to the process as applied to the ores in
Jan 1, 1904
-
Removal of Horizontal Level Pillar by Means of Blast Hole Diamond Drilling at New Occidental Gold Mine, Cobar, N.S.W.By Creelman C. A
The removal of a horizontal piIlar between Nos. 9 and 11 levels (1,116 feet from the collar of main shaft) was successfully carried out by blast hole drilling, and, to the best of the authors' kn
Jan 1, 1944