Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014

  • AUSIMM
    The Removal of Zinc from Lead Slag by Sulfation and Chlorination

    By G C. Bolton

    Experiments were conducted to access the feasibility of removing zinc from lead slag by sulfation or chlorination or both. Gaseous sulfation with sulfur dioxide and oxygen released only 50 per cent of

    Jan 1, 1980

  • AUSIMM
    The Water Footprint of Mining Operations in Space and Time - A New Paradigm for Sustainability Assessments?

    As the mining sector increasingly embraces the sustainability agenda, and implements thorough environmental reporting in support of its case for a continued æsocial licence to operateÆ, there is a nee

    Jan 1, 2006

  • AUSIMM
    Process Requirements for the Direct Condensation of Both Zinc and Lead as Metals in the Polymetallic Smelting of Zn-Pb-Cu Sulphides

    By Warner N. A

    There is an inherent problem in producing simultaneously lead, zinc and copper as metals in a single polymetallic smelting furnace. It relates to the condensation of lead and zinc from the gas phas

    Jan 1, 1989

  • AUSIMM
    The Determination of Fe, Si and Al Content in Iron Ore Blastholes by Nuclear Logging

    By A Rojc, J Ronaszeki, C Smith

    Nuclear logging was tested for the in situ determination of Fe, Si, and Al in iron ore blastholes with field tests at the BHP Billiton Iron Ore, Mount Waleback Mine. Prompt gamma neutron activation an

    Jan 1, 2002

  • AUSIMM
    Alternative Joint Venture Structures Applicability to Project Development

    Attention is given to three possible alternative structures namely corporate joint venture, partnership joint venture and unincorporated joint venture. A corporate joint venture involves the form

    Jan 1, 1983

  • AUSIMM
    Geochemical Characterisation of Flinders Mines’ Pilbara Iron Mineralisation

    By G D. McDonald

    Flinders Mines is an ASX300 iron ore explorer and developer with a tenement package located in the Hamersley Ranges region of Western Australia, approximately 70 km north of Tom Price. Exploration ove

    Jul 11, 2011

  • AUSIMM
    Materials Handling in Open Cit Mines State of the Art and Near Future Developments

    Depressed prices for minerals will force the mining industry to became more efficient. The continuous conveying of pit product is one area in which savings can be made. Conveyors are available, or

    Jan 1, 1986

  • AUSIMM
    Deep Well Pumping as an Aid To Shaft Sinking

    MR. L. C. BALL, chief government geologist, Queensland, wrote: This paper is intended as a severely mechanical exposition of the means adopted to deal with tremendous inflows of water concurrently wit

    Jan 1, 1939

  • AUSIMM
    A Laboratory Study of the Effect of Burden and Spacing Parameters on Rock Fragmentation in Blasting

    By Vutukuri VS, Budavari S

    During recent years many investigators have suggested large spacing to burden ratios to improve the fragmentation obtained in blasting. In spite of these suggestions, most operators still use a conv

    Jan 1, 1975

  • AUSIMM
    The Mineralogy and Reactivity of Pyrrhotite from Selected Nickel Ore Deposits and its Effect on Flotation Performance

    The Mineralogy and Reactivity of Pyrrhotite from Selected Nickel Ore Deposits and its Effect on Flotation Performance

    Sep 13, 2010

  • AUSIMM
    Reconstruction Project Pechenganickel Combine Metallurgical Operations

    By B Lindqui, M V. Knyazev, L S. Tsemekhman

    Gipronickel Institute JS that is a Research and Development Centre affiliated to the worldclass Norilsk Nickel Mining and Metallurgical Company, and Outokumpu Technologies AB (Boliden Contech AB) have

    Jan 1, 2004

  • AUSIMM
    Novel Use of Ice Thermal Storage for Energy Management on a Mine Refrigeration Plant

    By R W. Wilson, A R. Branch, T S. Pooe

    The original bulk air cooling system at this particular mine made use of two water chilling refrigeration machines to produce peak cooling of approximately 12 MWR with a downcast air temperature of ab

    Aug 31, 2015

  • AUSIMM
    Veinlike Uranium Deposits in the Rum Jungle Area-Geological Setting and Relevant Exploration Features

    By Borshoff J, Coles R

    The Rum Jungle Uranium Province is lo cated on the western margin of the Pine Creek Geosyncline approximately 60km south of Darwin. Uranium was discovered in the Embayment area (Whites Deposit) in

    Jan 1, 1984

  • AUSIMM
    The Application of a Computerized Coal Inventory in the Formulation on an energy Policy for South Africa

    A Presidential Commission of Enquiry into the conservation of South Africa's coal resources was appointed in 1970. This Commission, in co-operation with the Chamber of Mines of South Africa,

    Jan 1, 1977

  • AUSIMM
    Real Time and In Situ Measurement of Elemental Composition Using Lasers

    Real Time and In Situ Measurement of Elemental Composition Using Lasers

    Sep 13, 2010

  • AUSIMM
    Adsorption of Alkylammoniums in the Interlayer of Montmorillonite and its Effect on the Viscosity of Organo-Montmorillonite Gels

    Adsorption of Alkylammoniums in the Interlayer of Montmorillonite and its Effect on the Viscosity of Organo-Montmorillonite Gels

    Sep 13, 2010

  • AUSIMM
    Bubble Flow Pattern Detection in the Water Model of a Metal Treatment Unit

    By J J. J Chen, J C. Zhao

    A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a gi

    Jan 1, 1995

  • AUSIMM
    Constraining Parameters in Mineral Processing Simulator Calibration Problems through the Use of Transforms.

    A wide range of models are available to computer process simulators that require a large number of parameters which often are physical measurements, coefficients, calibration factors and functional

    Jan 1, 1993

  • AUSIMM
    Ambuklao Tunnel Plug Construction

    By B Hayes

    The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956

    Mar 8, 2011