Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Multi-phase CFD modelling of spiral concentrator – Prediction of particle segregation and separation performance

    By R M. Yanamandra, M Kumar, S K. Tripathy, N Mangadoddy, P Sudikondala

    Spiral concentrators are one of the flowing film gravity concentration devices used to beneficiate coal and mineral ores. The aim of the current study is to understand the particulate flow and separat

    Aug 24, 2022

  • AUSIMM
    Jig Concentrating at Broken Hill, New South Wales, with Special Reference to Broken Hill South Ltd.

    THE nature of the ore deposit of the Broken Hill line of lode is such that it can be broadly divided into two the calcitic and siliceous ore bodies. The principal minerals occurring in these ores are:

    Jan 1, 1928

  • AUSIMM
    Commodity - Linked Borrowing Opportunities for Resource - Oriented Projects and Companies

    The traditional form of project financing for resource related projects has involved project financings structured with either recourse to the project sponsor(s) or commercial banks accepting the proj

    Jan 1, 1985

  • AUSIMM
    The Waihi Epithermal Gold-Silver-Quartz Vein System, New Zealand: A High-Throughput Geothermal System of Late Miocene Age

    By P Blattner

    The Late Miocene gold-silver bearing epithermal system at Waihi has some close similarities in its paleo-thermal and geochemical structure with modern, volcanic-hosted geothermal systems such as Ohaak

    Jan 1, 1995

  • AUSIMM
    A One Step Method to Mass Balance Data and Fit Screen Models

    By Whiten WJ

    A method that allows data to be mass balanced and screen models to be fitted in a single step is described. The inclusion of several variables to describe the feed data in the fitting procedure al

    Jan 1, 1984

  • AUSIMM
    Ilmenite Beneficiation by Roasting and Magnetic Separation

    By J P. van Dyk

    A new crude ilmenite beneficiation process was recently proposed that allowed for the preparation of a smelter grade ilmenite from ilmenite with elevated chromium content. Magnetising roasting was not

    Jan 1, 2001

  • AUSIMM
    Rock Analysis by Direct Reading Emission Spectroscopy

    Using a Jarrell-Ash "Compact" direct reading spectrometer, analyses were made of a wide variety of rocks ranging from acidic to ultrabasic types. Statistical evaluation suggests that accurac

    Jan 1, 1969

  • AUSIMM
    A Multi-year Assessment of Landform Evolution Model Predictions for a Trial Rehabilitated Landform

    By G Hancock, J Lowry, T Coulthard, W Erskine, M Saynor

    An important part of planning for the rehabilitation of uranium mine sites is the ability to assess the geomorphic stability of the final landform, over time frames ranging from decades to millenia. D

    Jul 16, 2014

  • AUSIMM
    Evaluation of Post-tertiary Training Programmes Designed to Develop Practical Skills

    By Baxter J. L

    Post-tertiary training programmes have been designed and produced for geologists at different levels of understanding and expertise in the relationship between gold mineralization and shear zones.

    Jan 1, 1989

  • AUSIMM
    Reliability of Pillar Design in Coal Mines Based Upon Existing State of the Art

    The far reaching consequences of designing pillars for coal mines, while retaining concern for safety and economics, are cause for the search for refinement of the existing engineering methods to cont

    Jan 1, 1991

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill (7122c7bd-f6fa-43f0-828a-39df96a7a19e)

    B. P. Thomson (South Aust. Dept. of Mines): Dr. A. B. Edwards presents in the published discussion on the above paper, his interpretation of the dolerite dyke-lode relationship as a major objection to

    Jan 1, 1959

  • AUSIMM
    Leachwell Versus Fire Assay: Comments from Assay Quality Assurance at Tarmoola Gold Mine

    A fundamental component of grade control at Tarmoola Mine has been the monitoring of assaying through quality assurance programs. The programs have concentrated on issues related to accuracy and preci

    Jan 1, 2000

  • AUSIMM
    Geostatistics for Prediction of Coal Washability Characteristics

    By Cawte D. C, Just G. D, Whitchurch K. D

    The stringent marketing specifications included in coal contracts mean that coal producers must supply cleaner and more consistent coal than may have been formerly required. Geostatistics has the pote

    Jan 1, 1987

  • AUSIMM
    Australian Mining Legislation - A Land Management Concept

    The Australian Mining Industry Council (A.M.I.C.) was established in 1967 as a body to co-ordinate the interests of the mining industry on a nation-wide basis. Its member- ship now embraces the grea

    Jan 1, 1974

  • AUSIMM
    A Simple XRF Fusion Method for Mineral Exploration Samples: Determination of Nickel and Gallium

    By Haukka M. T

    A new low-dilution fusion method which has been successfully used for accurate determination of the major oxide components of silicate rocks, is applicable to rapid, accurate determination of trace or

    Jan 1, 1978

  • AUSIMM
    Jameson Cell Test Work on Copper Streams in the Copper Concentrator of Mount Isa Mines Limited

    By Griffin PT, Espinosa-Gomez R, Jameson GJ

    Two major issues are to be addressed in the Copper Concentrator of Mount Isa Mines Limited. The first of these is the need to increase concentrator flotation capacity to increase copper recovery, wh

    Jan 1, 1993

  • AUSIMM
    Application of Field Measurement Techniques to the Design of Roof Reinforcement Systems in Underground Coal Mines

    By Fabjanczyk M. W

    A limitation to present theoretical roof reinforcement design methods is the inability to derive accurate and quantitative information about the roof rock condition and the action of reinforcement

    Jan 1, 1986

  • AUSIMM
    Physical and Chemical Recycling of Placer Gold: Implications for Exploration in Central Otago

    By D Craw

    Uplift of the antiformal ranges in Central Otago,

    Jan 1, 1992

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • AUSIMM
    Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines

    By J Simpson, M Johnston

    Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n

    Jan 1, 2003