Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    Managing steep seam dips and floor shears related dragline bench and lowwall instabilities

    By J Li, J Regan, D Payne

    The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge

    Nov 29, 2022

  • AUSIMM
    A new gas emission prediction model based on Australian longwall mining conditions

    By Q Qu

    Reliable prediction of longwall gas emission sources and rate plays a critical role in mine ventilation and methane drainage capacity planning. Over the years, Australian longwall mines have been usin

    Oct 12, 2022

  • AUSIMM
    The Influence of Seismic Hazard on the Building of Inner Dump in the Belchat=w Lignite Open Cut Mine

    By S Slusarczyk, Z Kozlowski

    Vibration of surface caused by seismic quakes can make a risk to great mining costruction. We have to do with this risk in the Belchatow open cut mine where seismic quakes of various energy and range

    Jan 1, 2003

  • AUSIMM
    Raw Materials Quality Management -An Essential for New and Ongoing Operations

    Better quality at lower cost is today's formula for remaining competitive in a world market. For an integrated steel company, high quality low cost steel production must originate before the

    Jan 1, 1986

  • AUSIMM
    Groundwater Exploration for Mining Development and Groundwater regimes in the Goldfields of Western Australia

    Since gold was first discovered, mining development in the West Australian goldfields has been heavily dependent on the location of groundwater both for potable and mineral processing supplies . Th

    Jan 1, 1988

  • AUSIMM
    XPAC Destination Scheduling for Waste Dumps at BHP Billiton

    By G J. Butler

    Since 2005 BHP Billiton Iron Ore has been working with the consulting company Runge to implement the software XPAC Advanced Destination Scheduler (ADS) in life-of-mine studies. The Mt Whaleback mine,

    Jan 1, 2007

  • AUSIMM
    A Modular Expert System for Diagnosis of Vehicles with Diesel Hydraulic Drive Components Used in the Mining Industry

    By Streichfuss M, KeBler H-W, Burgwinkel P

    This paper describes the design of an expert system used as a part of a diagnostic system for diesel hydraulic drives. A PC-based diagnostic system ruDi (KeBler and Burgwinkel, 1993) was developed t

    Jan 1, 1995

  • AUSIMM
    Agglomeration Heap Leaching

    By Reeve JS

    Heap leaching is a low capital cost alternative to conventional processing techniques for gold recovery from areas that contain small gold particles in a porous host rock.For successful heap leaching

    Jan 1, 1986

  • AUSIMM
    Predicting Flotation Response from Liberation Information

    Predicting Flotation Response from Liberation Information

    Sep 13, 2010

  • AUSIMM
    Treatment Methods and Plant of Gold Mines of Kalgoorlie Ltd.

    The treatment plant of the Gold Mines of Kalgoorlie Ltd. is situated on the Oroya South Lease, on the Eastern edge of the Kalgoorlie Golden Mile.It was designed and erected by Messrs. Alex. Stewart an

    Jan 1, 1948

  • AUSIMM
    Natural Capital Accounting – a Sea Floor Mining Application

    By R Grogan

    Nautilus Minerals Inc is a sea floor resource exploration and development company focused on developing the Solwara 1 Project, a copper-gold sea floor massive sulfide deposit in the territorial waters

    Jun 28, 2016

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006

  • AUSIMM
    Boddington Gold Mine - An Example of Sustaining Gold Production for 30 Years

    By G Veillette, B Parker, S Hart

    This paper provides a history of the challenges that were experienced while treating both the clayey oxide gold ores and the supergene copper-gold ores at the Boddington Gold Mine during the period 19

    Jan 1, 2007

  • AUSIMM
    Stope Blast Vibration Analysis at Dugald River Underground Mine

    By J Player, R de Vries, E Villaescusa, R Hassell

    Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va

    Aug 24, 2015

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • AUSIMM
    A Review of The Literature on The Chemistry and Metallurgy of Tantalum and Columbium

    In 1801, Hatchett discovered the oxide of a new element while he was examining a heavy black mineral from Haddam, America, which had been presented to the British Museum. He named the mineral Columbit

    Jan 1, 1943

  • AUSIMM
    An Overview of New Integrated Geometallurgical Research

    The emerging discipline of ægeometallurgyÆ is not new but is becoming increasingly recognised as a discrete and high-value activity that reflects an ongoing commercial and cultural trend towards more

    Jan 1, 2008

  • AUSIMM
    Inline analysis of washability parameters for process control

    By M P. Cipold, J F. Bachmann, C C. Bachmann, J Ha, H B. Wurst

    In washability, the objective is to establish the set of maximum possible separation performance criteria for a given mineral feed. The method of choice for this has been the conventional sink–?float

    May 9, 2017

  • AUSIMM
    Sirosmelt Investigation - An Example of Process Evalutaion Techniques

    By Nilmani M, Malone J, Taylor RN, Floyd JM, Gray NB, Fountain CR

    CSIRO staff and University of Melbourne staff and students collaborated in an intense programme of investigation on the CSIRO 50 kg Sirosmelt pilot plant.In two days of operation copper matte converti

    Jan 1, 1985