Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Update on Cave Development and Draw Control at the Henderson Mine

    By D S. Stewart, K W. Keskimaki

    The Henderson Mine has been utilising a continuous panel caving method to extract molybdenum ore since starting operation in 1976. In the past three decades since the mine was designed, many changes h

    Jan 1, 2000

  • AUSIMM
    Diamond Drill-Blast-Hole Mining in Canada

    Until 1937, the mining of ore was carried out by conventional methods, using pneumatic drills and standard drill steel. The adoption of the diamond drill, formerly used for exploration work, for blast

    Jan 1, 1946

  • AUSIMM
    Some Aspects of the Stratigraphy of the Host Sequence to the Mount Morgan Gold-Copper Deposit, Central Queensland

    The Devonian Mount Morgan gold-copper deposit was situated on the western margin of the Calliope Volcanic Are assemblage, in the northern New England Orogen. Recorded production from commencement of

    Jan 1, 1994

  • AUSIMM
    Mesothermal Gold Deposits of Westland, New Zealand and Southern Alaska: Products of Similar Tectonic Processes?

    By D Skinner, P Haeussler, D Bradley, A Christie

    Mesothermal gold deposits of southernAlaska and Westland, New Zealand have both formed at the seaward edge of major collisional zones in the Pacific basin. In Alaska, production of large fluid volumes

    Jan 1, 1995

  • AUSIMM
    Wear Rate Evaluation of Mill Lining and Grinding Media Materials (6cce772a-f9dd-47eb-bf3c-8700faa7e0f4)

    By Wingham D. W

    Based upon the previous work of Norman & Loeb, a method was used to assess the comparative wearing properties of ten different alloys being used, or being considered for use, as mill liners and gr

    Jan 1, 1963

  • AUSIMM
    Zinc-Rich Massive Sulphide Deposits in Tasmania

    By Gemmell J. B

    Zinc-bearing massive sulphide deposits have been mined in Tasmania since 1900. The current major producers are Hellyer and Rosebery, with total resource tonnages (mined plus reserves) of 16 Mt (mill

    Jan 1, 1993

  • AUSIMM
    Resin Bonded Bolting in French Coal Mines

    Roof bolting with resin bonded bolts has been developed extensively in French coal mines. There are three aspects of this development: 1. The reason for and the care used in the development of roof

    Jan 1, 1971

  • AUSIMM
    Horizontal Stress Control in Underground Coal Mines

    By Nemcik JA, Gale W. J

    The magnitude and orientation of the in situ stressfield has been determined as a key factor in controlling the stability of openings for both coal mine development and extraction. Monitoring of r

    Jan 1, 1992

  • AUSIMM
    Seismic Stability of the Mt Frederick Sidecast

    By S J. Woods

    As a part of Solid Energy's progressive rehabilitation of the Stockton Mine, it was determined that significant rehabilitation of the existing Mt Frederick Sidecast would be required to ensure th

    Jan 1, 2003

  • AUSIMM
    Water Inrush Prevention in Polish Coal Mines

    The short review of hydrogeologic conditions in the three Polish coal basins have been presented as the background for the prevention measures against water inrushes being underta- ken in coal mines

    Jan 1, 1988

  • AUSIMM
    Recovery of Copper from Chalcopyrite Concentrate by Means of Sulphur Activation, Cupric Chloride Leach, and Electrolysis

    Extraction of copper from a chalcopyrite concentrate by means of a cupric chloride leach is described. Initially the concentrate is mixed with sulphur in a 9: 1 ratio, and heated to 350-400°C. Th

    Jan 1, 1974

  • AUSIMM
    The influence of the strain rate and pre-static stress on the dynamic mechanical properties of medium sandstone

    By S Yang, J Wang, J G. Ning

    A series of conventional dynamic uniaxial compression (CDUC) tests and coupled static-dynamic loading (CSDL) tests were conducted using a split Hopkinson pressure bar (SHPB) system to explore the dyna

    Nov 29, 2022

  • AUSIMM
    Hydrogeological Testing in Underground Holes during Grouting

    The development of the SECV brown coal open cut at Loy Yang will require depressurisation of aquifers both within and below the coal seam sequence in order to maintain open cut stability. Prediction

    Jan 1, 1988

  • AUSIMM
    Options in Research Oriented to Production Processes

    Interrelated data for five fundamental features of production processes would help promote the- development of the discipline and profession of extractive metallurgy. The features are the input ma

    Jan 1, 1986

  • AUSIMM
    The Making And Evaluation Of Directly Reduced Iron Pellets (f90b3e65-709c-44cc-8d01-7748562da6e5)

    By Wright J. K

    In recent years the production of steel from directly reduced iron ore pellets has ex- panded rapidly. However continued growth will depend on an adequate supply of suitable raw materials for the va

    Jan 1, 1980

  • AUSIMM
    Application of Leading Practice Spontaneous Combustion Assessment to Exploration at the Doyles Creek Project

    By J Edman, RáBeamish, G Cambourn, B Beamish

    Moist Adiabatic Benchmark (MAB) and R70 testing have been applied to core samples of a multiple seam sequence from a borehole at the Doyles Creek Project. The coal samples range in rank from high vola

    Jul 1, 2013

  • AUSIMM
    Simulation and Animation Model for the Millerton Coal Mine (New Zealand)

    A simulation and animation model was constructed for the Stockton Coal Mine. This mine is located in the north western area of the South Island of New Zealand. This model was used to study the optimum

    Dec 6, 2010

  • AUSIMM
    An Analysis of the Performance of Multi-Stage Grinding and Cyclone Classification Circuits

    By Lynce AJ

    A method has been developed for the prediction 'of 'the- . performance of a multi-stage grinding=cyclone classification circuit of any degree of complexity on any ore for a wide range `of

    Jan 1, 1964

  • AUSIMM
    Philosophy of Enforcement of the Enforcement of the Federal Coal Mine Health and Safety Act of 1969 as it relates to pillar recovery

    Since 1865 when Congress moved to create a Federal Mining Bureau, successive legislations have given rise to the current '!Federal Coal Mine Health and Safety Act, 1969. Coal beds from 22 feet

    Jan 1, 1974

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zeland

    By Gregg PEH, Horne D, Bolan N, Stewart RB

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on si

    Jan 1, 1995