Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Common Infrastructure Project ù Development for the Future of PT Freeport Indonesia

    By B Mennie, R Poedjono, G Coad

    PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char

    Jan 1, 2005

  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada

    By S F. Simmons, J Fleming

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophyi

    Jan 1, 1995

  • AUSIMM
    Using the Floatability Characterisation Test Rig for Industrial Flotation Plant Design

    By J-P Franzidis

    Industrial flotation plant design is a complex process involving many aspects, one of which is the use of pilot-scale plants to test industrial plant flow sheets. Once test work on a pilot-scale has b

    Jan 1, 2004

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Gold, Silver and Base Metal Deposits of the Chillagoe District, Australia: Hypothermal to Epithermal Overprinting

    By J E. Nethery

    At the Red Dome and Mungana deposits in north Queensland, Australia, it is proposed that mineralisation and alteration developed as a 'telescoped' overprinting continuum, ranging in style fr

    Jan 1, 1995

  • AUSIMM
    Geological Controls on the Formation of Gold Rich Porphyry-Type Deposits

    The geological features of the destructive plate margins of the southwest Pacific favour the formation of porphyry type deposits. The major controlling factor favouring the formation of gold-rich depo

    Jan 1, 1995

  • AUSIMM
    Characterisation of Silver Minerals in Lead-Zinc Flotation Tailings and Their Response to Cyanidation

    By N Guresin, M Rohde

    A lead-zinc flotation tailings sample containing silver from BHP Billiton’s Cannington Mine has been characterised to understand occurrences of silver in the tailings by conventional elemental, X-ray

    Sep 1, 2014

  • AUSIMM
    Influence of shear rate on separation of iron ore fines using the REFLUXTM Classifier

    By J Zhou, D M. Hunter, S M. Iveson, K P. Galvin

    The REFLUX Classifier is used to perform particle separations on the basis of density utilising a set of parallel inclined channels positioned above a vertical fluidised section. In continuous mode, f

    Jul 24, 2017

  • AUSIMM
    Blind Shaft Drilling of the Agnew Mine No. 1 Ventilation Shaft

    The Agnew Mine No. 1 Ventilation Shaft is the largest diameter shaft blind drilled in a hard rock mining environment. The selection of this method of shaft development was based on achieving an a

    Jan 1, 1983

  • AUSIMM
    The Modified Metallurgical Upgrading of Ilmenite to Produce High Grade Synthetic Rutile

    Naturally occurring rutile contains approximately 96 per cent titanium dioxide (Ti02), whereas the product from the ilmenite reduction - aeration upgrading process, "sub- rutile", contains only abou

    Jan 1, 1973

  • AUSIMM
    Influence of the Sloping of Ground Surfaces on Mine Subsidence

    By Bhattacharyya AK

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the

    Jan 1, 1992

  • AUSIMM
    Characterisation of Manganese Ores

    Characterisation of Manganese Ores

    Sep 13, 2010

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed

    Jan 1, 1995

  • AUSIMM
    Determination of cyanide and potentially toxic elements in gold tailings at Barberton, Mpumalanga, South Africa

    By K E. Mudzanani, T A. M Msagati, D T. Maiga, T T. Phadi, M R. Letsoal, B M. Chabalala, S W. Limani

    This paper addresses critical environmental, health, regulatory and scientific concerns related to gold mining activities in the specific area of Barberton, Mpumalanga, South Africa. The paper thus ca

    Apr 16, 2024

  • AUSIMM
    Metallurgical Testwork to Define the Design Criteria for the Electrowinning System for KCGM Fimiston Stage III Gold Room Including Initial Commissioning and Operational Experience

    By Mason P, Waller C

    The Phase I electrowinning system at KCGM's Fimiston Operation utilised the well proven technology of electrowinning precious metal values onto steel wool followed by calcining and direct smelt

    Jan 1, 1996

  • AUSIMM
    Effect of Weakness Planes Inclination on the Strength of Coal Pillars

    This paper presents a method for estimating the strength and stability of model coal pillars with bedding planes (weakness planes) inclination. The strength of coal relative to the angular differenc

    Jan 1, 1995

  • AUSIMM
    The Compatibility of Major Economic Criteria for Project Evaluation

    The most frequently applied project evaluation criteria are the Net Present Value, the Internal Rate of Return, and the Pay Back Period. Unfortunately, the Internal Rate of Return and the Pay Back Per

    Jan 1, 1991

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion (e832ca00-fad1-4d25-a701-ac8072a9e7d1)

    The first stage in the refining of lead blast furnace bullion is the removal of copper and is normally done as a batch process in open kettles.A number of attempts have been made to establish continuo

    Jan 1, 1963

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    The Loader Distributor Train - an Advanced System for High Speed Mucking of Hard Rock Tunnels

    By Luck D

    Current methods of mucking out small development tunnels are a major limitation to improved efficiency and high rates of advance. This is particularly true in the deep metalliferous mines of South

    Jan 1, 1986