Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport Indonesia

    By M E. Rakidjan

    The DOZ underground mine at PT Freeport Indonesia is a copper and gold mine in Indonesia with current ore production of 42 000 tpd. Because of the mine expansion into the West DOZ more ventilation rai

    Jan 1, 2005

  • AUSIMM
    Development of a Ground Support and Reinforcement Philosophy for Stoping at the Porgera Underground Gold Mine, PNG

    The initially cautious approach taken towards ground support and reinforcement at the Porgera Underground Gold Mine in the Highlands of Papua New Guinea has evolved rapidly in the two years since stop

    Jan 1, 1993

  • AUSIMM
    Discovery, Geology and Metal Zoning of the Nickel Rim Depth Deposit, Sudbury, Canada

    The Nickel Rim Depth Cu-Ni-PGE deposit, discovered by Falconbridge Limited in 1993, illustrates several trends in exploration in the Sudbury area. Recent discoveries tend to be deep, high grade, foo

    Jan 1, 1996

  • AUSIMM
    Technical Note - The Incorporation of Ash Content into Gas Content Measurement

    By Mahoney M

    For gas content analysis in recent years, it has been standard procedure to report results on a 'dry ash free' (daf) basis, under the assumption that gas only adsorbs onto coaly material. In

    Jan 1, 1995

  • AUSIMM
    Geotechnical Investigation of the South Wall, Mt Whaleback Pit a Case Study - How Goetechnology can Pay its Way

    By Parker RJ, Swindells CF

    The authors have used the geotechnical study for design of the South Wall of Mt. Newman Mining's Mt. Whaleback Mine to illustrate how geotechnical studies can be economically justified. This

    Jan 1, 1986

  • AUSIMM
    The Reduction of Zinc Oxide

    By Hayes P. C

    The reduction of small, dense zinc oxide (ZnO) samples in CO/CO2, and CO/N2 gas mixtures has been investigated at temperatures between 900 and 1100¦C. The microstructural characterisation of the rea

    Jan 1, 1991

  • AUSIMM
    Adsorption Effect on Multi-Heavy Metal Ions in Wastewater by Water-Washing Waste Saccharomyces cerevisiae

    Adsorption Effect on Multi-Heavy Metal Ions in Wastewater by Water-Washing Waste Saccharomyces cerevisiae

    Sep 13, 2010

  • AUSIMM
    Upgrading of Superfine Low-Grade Haematite Ores by Reverse Floatation Direct Reduction Low Intensity Magnetic Separation Process

    Upgrading of Superfine Low-Grade Haematite Ores by Reverse Floatation Direct Reduction Low Intensity Magnetic Separation Process

    Sep 13, 2010

  • AUSIMM
    The Devonian-Carboniferous Intracratonic Burdekin Basin, North Queensland: II. Volcaniclastic Continental Facies of the Dotswood Group

    By Gunther L. M, Rich N

    Remapping of the Burdekin Basin has resulted in the subdivision of the three formations (megafacies) previously recognised in the Late Devonian Dotswood Group. Nine dominantly volcaniclastic facies ar

    Jan 1, 1990

  • AUSIMM
    Estimating Breakage of Fine Ore Particles by Media in a Small Ball Mill Using DEM

    Estimating Breakage of Fine Ore Particles by Media in a Small Ball Mill Using DEM

    Sep 13, 2010

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island Scheelite

    By Bedford D. J

    The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50

    Jan 1, 1977

  • AUSIMM
    Development of the Pike River Coal Mine Access Road

    By D Macfarlane, T McMorran

      This paper describes the design and construction of the upper section of the Pike River Mine Access Road. The road extends 11 km from Logburn Road alongside Big River on the West Coast of the S

    Jan 1, 2007

  • AUSIMM
    Beneficiation Studies of Dolomitic Rock Phosphate in Pursuit of Zero Waste Technology - A Case Study

    Beneficiation Studies of Dolomitic Rock Phosphate in Pursuit of Zero Waste Technology - A Case Study

    Sep 13, 2010

  • AUSIMM
    The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel Intersections

    By Hocking G

    For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D

    Jan 1, 1976

  • AUSIMM
    The Ballarat CAE Mineral Industry Laboratory

    By Middlebrook PD

    The problems of education and research in the extractive metallurgy area are being tackled by the University of Melbourne through activities centring on the Department of Chemical Engineering. The

    Jan 1, 1986

  • AUSIMM
    Combined Pressure Leach Method for the Recovery of the Values from Low-Grade Molybdenite Concentrate

    By K Inoue

    The pressure oxidation of molybdenite concentrates in acidic and alkaline media has been studied. The conditions of the selective oxidation of copper and iron sulphide minerals with a quantitative cop

    Jan 1, 2000

  • AUSIMM
    Application of Lerchs-Grossman Pit Optimization to the Design of Open Pit Mines

    By Whittle J

    Definition of the optimum open pit, whether an intermediate phase or final design, will be sensitive to many factors. The most basic will include geological and mining constraints, mining and proc

    Jan 1, 1986

  • AUSIMM
    Developing a regional data catalogue to support the technical assessment of post-mining land use

    By C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine

    Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai

    Aug 2, 2023

  • AUSIMM
    The Application of Phase Equilibrium Studies to the Characterisation of Zinc and Lead Blast Furnance Sinters

    By Nairin J. D, Hayes P. C

    Detailed studies of the microstructures and compositions of zinc and lead blast furnace sinters have been undertaken. An analysis of the results obtained has indicated that in many cases the microst

    Jan 1, 1992