Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Use of Computerised Management Systems for the Blair Athol Coal mine Project

    As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Schedulin

    Jan 1, 1983

  • AUSIMM
    Gold Mineralisation on Sudest Island: Preliminary Findings

    By Ashley P, Neale T

    Alluvial gold was discovered on Sudest Island in 1888, and by 1893, an official production of 10 000 oz had been won by expatriate miners from shallow alluvial and colluvial workings. Hardrock sou

    Jan 1, 1991

  • AUSIMM
    Thermodynamic Properties and Phase Diagram of the Binary Alloy System Gold-Nickel

    Activity-composition-temperature relations for both gold and nickel have been determined for the solid and liquid states of the gold-nickel system by the application of the Margules equations. These r

    Jan 1, 1971

  • AUSIMM
    Bacterial Oxidation - An Economic Alternative for the Treatment of Refractory Gold Concentrates

    By Budden J. R, Rhodes M. K

    Bacterial oxidation technology was successfully applied in a mine site pilot plant for the treatment of refractory gold concentrates. The bacterial culture was proven capable of selectively breaking

    Jan 1, 1991

  • AUSIMM
    Centrifugal and Positive Displacement Pumping of Titanomagnetite Ironsand

    By I Hustwick

    New Zealand Steel Mining Limited operates two independent sand mining operations on the West Coast of the North Island of New Zealand. Waikato North Head 30 km south of Auckland supplies ironsand con

    Jan 1, 1990

  • AUSIMM
    The Hishikari Gold Deposit A Case History and Present Status of Exploration

    By Ibaragi K

    High grade ores were intersected in 1981 by a scout drill carried out by the Metal Mining Agency of Japan during a reconnaissance dril ling programme. The original aim of the hole was to explore

    Jan 1, 1987

  • AUSIMM
    Processing/Development/Technology Advances

    Declining metal prices over the last few years have reduced the number of new metallurgical plants being built and limited opportunities for introducing new processes. However, technological advances

    Jan 1, 2000

  • AUSIMM
    Impact of Entry Air Velocity on the Fire Hazard of Conveyor Belts

    By Dalzell R. W

    A Conveyor Belt Fire Test Program was initiated in 1985 by the Approval and Certification Center (A&CC), Mine Safety and Health Administration (MSHA), U.S. Department of Labor. The purpose was to

    Jan 1, 1988

  • AUSIMM
    Simple Prediction of the Processing Characteristics of Ores Using QEM*SEM

    By Johnson CR, Wilkie G

    The aim of the study was to use quantitative mineralogical measurements to predict the processing characteristics of an ore. Samples were taken from a wide range of concentrators processing ores of

    Jan 1, 1989

  • AUSIMM
    The Negotiated Compressed Process (NCP) (An Alternative Approach to Contracting Practices)

    By Benson R. P

    Building a new tunnel to accommodate CN North America's needs or double stacked container traffic for the next 100 years represents new and unprecedented challenges. Innovative approaches to cont

    Jan 1, 1993

  • AUSIMM
    The Use of an Agitated Bed of Particles as an Electrode System for Metal Deposition (4876d8c2-8782-4927-8ff6-1653abc1cd21)

    Polarization phenomena associated with the use of an agitated bed of particles as an electrode for metal deposition were studied. The concentration polarization at this type of electrode is much small

    Jan 1, 1971

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AUSIMM
    Development Of Lead Flotation Process Control At The Zinc Corporation, Limited

    By Dawes C. A, Mitchell R. A

    A process control strategy has been developed for the lead circuit of the lead- zinc concentrator at The Zinc Corporation, Limited (ZC), Broken Hill, Australia. The general aims of the control syst

    Jan 1, 1983

  • AUSIMM
    Rocktype classification and domaining of complex stratiform Zn-Pb-Ag mineralisation at the George Fisher Mine using high resolution XRF Core scanning

    By R Valenta, I Fahey, M Klawitter, N Spanswick

    Zinc-Lead-Silver (Zn-Pb-Ag) mineralisation at the George Fisher Mine occurs in multiple structurally-disrupted stratiform orebodies hosted within a mid-Proterozoic sequence of calcareous siltstones an

    Nov 21, 2018

  • AUSIMM
    East Kimberley Nickel Province - Characteristics and Origin of the Sally Malay Ni-Cu-Co Deposit, East Kimberley, Western Australia

    By Barnes GJ

    The gabbroid-hosted nickel sulphide deposits of the East Kimberley constitutes one of Australia's most prospective emerging nickel provinces. Sally Malay Nickel NL (SMN), a wholly owned subsidi

    Jan 1, 1996

  • AUSIMM
    Industrial Applications of the High-Intensity Rare Earth Drum Magnetic Separator

    By Merwin RA

    The recent development of rare earth permanent magnets has revolutionised the field of magnetic separation. The advent of rare earth permanent magnets in the 1980s provided a magnetic energy produc

    Jan 1, 1993

  • AUSIMM
    Integrating Bulk Ore Sorting into a Mining Operation to Maximise Profitability

    By P Holtham, K Duffy, W Valery, A Jankovic

    As high grade ore deposits are depleted, remaining deposits are generally lower grade and require the mining and processing of larger volumes of material per tonne of product. These low grade deposits

    Sep 7, 2015

  • AUSIMM
    Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane

    By Baxter D. A

    This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r

    Jan 1, 1993

  • AUSIMM
    The Direct Filling of 1100 Orebody Stopes from Surface at Isa Mine

    In early-1989, subsidence due to voids at the top of previously filled stopes and stopes awaiting filling,began to threaten the 15 level fill conveyor horizon. This together with the need to maintain

    Jan 1, 1992

  • AUSIMM
    The Causes of Heavy Mineral Loss From Mineral Sands Wet Concentrators

    By Alford R. A

    The causes of the loss of heavy mineral from mineral sands wet concentrators were identified through detailed surveys of two such concentrators. It was found that tray and spiral sluices preferentiall

    Jan 1, 1991