Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Electric-Hydraulic Drilling at Mount Isa Mines Limited

    Since 1975 two electric hydraulic drills, a Robbins 11ND and an Atlas Copco C0P1038, have been part of the production drilling fleet at Mount Isa Mines Limited's Isa Mine. As might be expecte

    Jan 1, 1978

  • AUSIMM
    Properties of rock blasting

    Every text book for blasting in Japan says that Hauser's law can be applied for practice. But recently it came true that there was no historical record about him and no actual datum of his own

    Jan 1, 1990

  • AUSIMM
    Large Scale Rhyolitic Volcanism at a Convergent Plate Boundary: Central North Island, New Zealand

    Large scale rhyolitic volcanism is an important process at some convergent plate margins because it leads to chemical differentiation of the upper.-crust and is responsible for the production of

    Jan 1, 1987

  • AUSIMM
    Hydrothermal Alteration Around Younger Intrusives Near Karamea Bend, North-West Nelson, New Zealand

    Ordovician metasedimenIs near the Karamea Bend and east of Ihe upper Carboniferous Karamea batholith were intruded by acidic stocks during the Cretaeeous. K/ Ar dating of two of the stocks gave 110 &

    Jan 1, 1976

  • AUSIMM
    Sampling Practice at Prestea Goldfields Ltd of Ghana

    By Baafi EY, Appiah HK

    The Prestea Goldfields Ltd of Ghana, West Africa has produced over 170 t of gold with average grade of 11 g/t since 1912. The deposits occur in a wide shear zone which closely follow the Birimian-Tark

    Jan 1, 1976

  • AUSIMM
    Hoesch Ajo System for Granulation of Blast Furnace Slags

    By Kister H

    Hoesch HUttenwerke AG, Dortmund, West Germany, is an integrated steel work of the Estel-group. The nominal annual production capacity-is about 7 Mio tons of steel. Hoesch has along experience in opera

    Jan 1, 1979

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    Living with Change at South Bulli Colliery

    By Ogilvie M

    South Bulli is the oldest and largest underground coal mine in Australia. Two longwall units are in operation and current production is 2.5 to 3 million tonnes of run of mine product per year with a w

    Jan 1, 1991

  • AUSIMM
    Origin of Sedimentary Rock-Hosted Gold Mineralisation at Kyaukpahto, Kawlin-Wuntho District, Northern Myanmar

    The Kyaukpahto gold deposit is located at latitude 23¦ 47Æ 55" N and longitude 95¦ 56Æ 35" E in the Kawlin-Wuntho district, Sagaing Division, Myanmar. Gold mineralisation is hosted in sandstone of the

    Jan 1, 2008

  • AUSIMM
    An Empirical Method of Assessing Rock Mass Blastability

    A method of assessing the blastability of a rock mass is presented which makes use of five, readily available, simple parameters. These are the Rock Mass Description, Joint Plane Spacing, Joint Pl

    Jan 1, 1986

  • AUSIMM
    Air Flow and Respirable Dust Distribution on Longwall Faces

    By Liu Y

    Ventilation, air leakage, and various cutting, loading and support movement operations all have a role in dust distribution on longwall faces as shown by the results of a large number of dust measurem

    Jan 1, 1995

  • AUSIMM
    Understanding Mine Site Water and Salt Dynamics to Support Integrated Water Quality and Quantity Management

    By S D. Golding, K Baublys, V Nanjappa, C J. Moran

    Water reuse is becoming an integral component of the water management strategy on mine sites. This practise is being driven by corporate sustainability goals, community and societal pressures to demon

    Jan 1, 2009

  • AUSIMM
    Demonstrable Data Integrity of Mineral Resource Grade Estimation Decreases Economic Risk

    Mineral resource estimation is commonly based on the accumulation of a series of local estimates. At times, the distribution of these grade estimates is not appropriate to the grade distribution of th

    Jan 1, 2003

  • AUSIMM
    Textural Evaluation of Nickel Sulphide Gossans

    By Travis G. A

    The Mons Cupri Cu-Pb-Zn deposit is situated within a complex Archaean volcanic sequence dominated by rhyolitic fragmental rocks. This sequence is underlain by a 150 m group of rhyolitic ash flow t

    Jan 1, 1973

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • AUSIMM
    Engineering Potential of Seismic Methods of Assessing Rock Breakage Characteristics

    By Walter GW

    Rock mass classification systems for stable excavation design have been studied. The parameters which are important in such a classification system and those which should be included in a classifi

    Jan 1, 1978

  • AUSIMM
    Review of Past and Present Steam Pumping at Mines

    I take it the character of addresses to conventions, should, following precedent, avoid details, and treat subjects rather from a philosophical point of view so far as they will permit.In the subject

  • AUSIMM
    Underground Environment, Health and Safety

    By Clark T. M

    Underground coal mining involves the disturbance of natural strata stresses formerly in equilibrium, the production of noxious and flammable gases and dust which can be both an explosion and a heal

    Jan 1, 1976

  • AUSIMM
    Selection and Evaluation of Tunnel Excavation Methods for Heterogeneous Grounds

    By Tagawa H

    In Japan, geological condition do not only vary in a wide range of strata but are also extremely complex with the existence of faults and aquifers. With respect to rocks, in particular, it is very

    Jan 1, 1987

  • AUSIMM
    Recycling Galvanised Steel: Operating Experience and Benefits

    By Daniels E. J, Morgan W. A

    In response to the increase in consumption of galvanised steel for automobiles in the last decade and the problems associated with remelting larger quantities of galvanised steel scrap, a process is

    Jan 1, 1993