Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Orebody Definition and Optimisation (Coal)

    Exploration of a coal deposit provides the data on which a range of mine plans can be developed during project feasibility. The stages of exploration use methods and procedures which initially outl

    Jan 1, 1997

  • AUSIMM
    Seafield ResourcesÆ Offshore Alluvial Gold Project, Westland, New Zealand

    By N F. Fraser

    Seafield ResourcesÆ offshore placer gold project covers c.10 000 km2 of the Westland continental shelf between Karamea and Jacksons Head, from the low-water mark out to the 120 m isobath (Figure 1). D

    Jan 1, 2005

  • AUSIMM
    Woodlawn Mine - Ground Control Challenges and Solutions

    By P G. Fuller

    The Woodlawn Mine near Canberra faced the challenge of poor ground conditions from the commencement of underground operations 1987. Talcose shears bounded the dense massive sulphides on both the hangi

    Jan 1, 1998

  • AUSIMM
    Presidential Address (c6bc4496-0254-49d2-8045-842af5b52d7d)

    The selection of Sydney and Port Kembla for the First Ordinary Meeting of the Institute for 1938 was, no doubt, a recognition of the celebrations marking the 150th Anniversary of the first settlement

    Jan 1, 1938

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018

  • AUSIMM
    Findings from preliminary testing to determine alternative sources of ethylene within sealed areas of underground coalmines

    By E Westthorp, J Phillips

    The detection of ethylene in mined-out ‘goaf’ areas of underground coalmines is an industry standard indicator of accelerated oxidation where the coal temperature has exceeded 100°C. If uncontrol

    Aug 28, 2017

  • AUSIMM
    A Simultaneous Optimisation Tool for Open Pit Mine Scheduling

    By Y Ren

    The algorithms employed by the commercial tools are either heuristic algorithm or iterative optimisation of a subsystem. This often results in a suboptimal schedule. In this paper, the author presents

    Sep 26, 2013

  • AUSIMM
    Impact of Co-disposing Mixed Plant Rejects on Spoil Pile Settlements

    By D J. Williams, A K. Kho, A Shokouhi, N Tucker

    The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c

    Jul 27, 2015

  • AUSIMM
    Influence of Blasthole Delay Times on Fragmentation as well as Characteristics of and Blast Damage behind a Remaining Bench Face through Model-scale Blasting

    By P Moser, P Schimek, F Ouchterlony

    This paper summarises the findings of 27 model-scale bench blasts in magnetic mortar, which were conducted from 2011 to 2014 at the blasting site of the Montanuniversitaet Leoben.The aim of the study

    Aug 24, 2015

  • AUSIMM
    Mature Entry Mining Students at Ballarat CAE

    By Pratt IJ

    A report is given of the problems of finance and physical resources that currently affect The University of New South Wales, and of some of the measures adopted to alleviate them. Partly as'

    Jan 1, 1986

  • AUSIMM
    Longwall Mining at Appin Colliery

    A four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes

    Jan 1, 1976

  • AUSIMM
    Safety Legislation and its Effectiveness (ac5e8ac3-fdc6-4268-ac21-d01fd1825ebf)

    By Golledge P

    Safety legislation has a long history and widespread application, but how can one test its effectiveness? One way is to examine safety statistics. Another way is to compare the legislation with pri

    Jan 1, 1975

  • AUSIMM
    Equilibrium distribution of Pb between copper metal and slags

    By C Chen, T Kan

    The distribution ratio of Pb (LPb s/m) between three types of slags (FeOx–SiO2, CaO–FeOx and FeOx– CaO–SiO2) and molten copper after equilibrium was measured at 1300°C and oxygen partial pressure (pO2

    Jun 19, 2024

  • AUSIMM
    Surface and Near Surface Gold at Vunda, Fiji

    Surface and near surface particulate gold occurs sporadically over an area of some60 km2 between Vunda and Navilawa on the west coast of Viti Levu, Fiji.Background grades of 0.01 ppm can be found in t

    Jan 1, 1984

  • AUSIMM
    Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG mill

    By N S. Weerasekara, S Town, E Lessing, J A. De Torres

    Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi

    Aug 29, 2018

  • AUSIMM
    Enhancing dragline safety – a multi-layered proximity detection system

    By B Murphy

    Seeking to reduce the likelihood of uncontrolled personnel entry into the operating footprint of a dragline, Coronado Global Resources initiated a review of proximity detection systems currently avail

    Sep 1, 2024

  • AUSIMM
    A New Type of Continuous Processing HGMS and its Magnet System

    By Chen J, Sun ZY

    The present paper gives the design of a new HGMS for magnetic separation of sulphides. The main characteristics of this HGMS are using iron-cladding saddle-shaped magnetic coil for instead of the or

    Jan 1, 1993

  • AUSIMM
    Can Mine to Mill Optimisation Succeed Under Complex Constraints?

    By D Thornton, B Smith, S Demey

    Mine to Mill (MTM) optimisation, a total systems approach to the reduction of energy and cost in mining and mineral processing operations, is well-established technology. However, successful applicati

    Jan 1, 2007

  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    Development of a Process Simulation Package for Mineral Processing Plants

    By Riley TW

    This paper describes a Process Simulation Package for modelling the steady-state operation of a mineral processing plant. There are two levels of input allowed into the package. The first allows simpl

    Jan 1, 1985