Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Indicator kriging saves the day – improving reconciliationBy A Purton, C Taylor, E Conroy
The spatial modelling of geometallurgical domains is an important step in the characterisation of an ore deposit allowing for the quantification of various rock types, their differing rock properties
Mar 22, 2022
-
Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, AustraliaBy A Finch, C Pridmore
The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west
Aug 18, 2014
-
An investigation of gyratory crusher liner wear at the Telfer Operation using non-operational streamlined modellingBy J Harding, S Munro, R A. Bearman
Despite the importance of the primary crushing stage, performance optimisation is not well analysed with sufficient focus to give improvement opportunities. At the Newcrest owned Telfer operation, lin
Aug 24, 2022
-
Extending mine life through application of an in situ recovery approachBy D J. Robinson, L L. Kuhar
In-situ recovery (ISR) is accepted and applied across many geographies, and approximately 50% of the world’s uranium is currently extracted by using an ISR method (World Nuclear Association, 2014). T
Jul 25, 2018
-
Copper Price Uncertainties – Chaos Theory to Manage Risks in Mining ProjectsBy C Tapia Cortez, C Sammut, S Saydam, J Coulton
‘Like every other commodity, the value of the metals is subject to variation’ (Ricardo, 1817). Mineral commodity price uncertainties have always been a significant issue in mining business due to the
Nov 4, 2015
-
Subordinate Structures – Considerations and BenefitsBy M J. Nugus
The structural models developed by exploration and mining geologists are most commonly concerned with the ‘main structures’ or key constituents that pertain to the associated mineralisation. To this e
Aug 22, 2011
-
Environmental Impact Modelling for In Situ Leaching of UraniumBy A Roshal
It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th
Jan 1, 2008
-
Mining and the Resource Management Act 1991: Is the Playing Field Level? (27291526-e767-492f-a1b1-38f146759224)By Brown AP
Comparison of legal permits required for mining (as opposed to prospecting or exploration) in New Zealand, under the Mining Act 1971 and the Resource Management Act/Crown Minerals Act 1991. Mining ge
Jan 1, 1995
-
Removing some Subjectivity from Traditional BS 848 and ISO 5802 In Situ Fan Flow TestsTraditional in situ fan flow test methods under accepted standards require determinations to be made of both static pressures and total pressures during testing. This is to determine the resultant vel
Jul 1, 2013
-
Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold ConcentratorBy A Murphy, D Lauder, J Miranda
Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro
Jan 1, 2000
-
Resources and Reserves ù Their Impact on Financial Reporting, Valuations and the Expectations GapResources and reserves are critical inputs into the determination of an operating mineÆs financial results and balance sheets, but how well understood is this fact. Do the investors, directors, accoun
Jan 1, 2002
-
Management of Health and Safety in Tunnelling – Application of Australian Coal Mining KnowledgeBy G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch
Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a
Sep 17, 2014
-
Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite ConcentratorBy C Jenkins, M Mativenga, C Stanton, J Gerber
In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra
Jul 13, 2015
-
Mining and Metallurgical Education in VictoriaBy Worner H. K
Education has always been a topic to rouse the interest of mining and metallurgical engineers, but the recent activities of the Education Committee of the Australasian Institute of Mining and Metallur
Jan 1, 1950
-
Iran Mining Industry Based on the 20-Year Perspective 2025By F Rashidinejad
Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many
Nov 22, 2011
-
Fragmentation and its Impact on Downstream ProcessingThe perennial challenge facing mining and minerals operators is to improve productivity, usually by a combination of cost reduction and performance improvement. In a typical production situation inv
Jan 1, 1997
-
Effects of Specific Charge and Electronic Delay Detonators on Fragmentation in an Aggregate Quarry – Building Fragmentation Model Design CurvesBy M Olsson, U Nyberg, K Widenberg, P Svedensten, F Ouchterlony
During 2007 and 2008, the project Optimal Fragmentation in Blasting II was conducted at the Långåsen quarry of NCC Roads AB near Arlanda. The main goals were:an evaluation of the effect of u
Aug 24, 2015
-
The Challenges of Selective Mining within the Globe Progress Gold Mine, Reefton, South Island, New ZealandBy R Cooksey
The Globe-Progress Mine is an open pit gold mine that is part of the larger Reefton Goldfields deposit located on the West Coast of New Zealand. The regional geology comprises a series of north to sou
Aug 22, 2011
-
Innovation at the Hellyer ConcentratorBy G D RICHMOND, Campbell J. J
Aberfoyle Limited has developed the Hellyer complex base metal sulphide deposit located in North West Tasmania. As part of exploration and feasibility study, the ore was extensively tested, includin
Jan 1, 1992
-
Didipio - Learning the Lessons, Adapting and Getting Ready for ProductionBy R Redden
"The Didipio Gold-Copper project in the Philippines has been a well-defined reasonably high gold grade porphyry for almost two decades. OceanaGold are now bringing the project into production in late
May 24, 2012