Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recovery of Berryllia from Beryl

    By Lawrie DC

    Finely ground beryl was decomposed by mixing with ground limestone and soda ash andheating at 900¦C for,4-6, hours.The sintered material was then crushed and leached by boiling under reflux with 5N su

    Jan 1, 1963

  • AUSIMM
    Computer Enhancement of Landsat, Magnetic, and Other Regional Data

    The techniques originally developed to process digital images of Mars, later gained widespread acceptance when applied to Landsat data: they are now making a significant impact in fields of geolog

    Jan 1, 1986

  • AUSIMM
    A Methodological Approach Towards a Global Environmental Impact Assessment of Acid Mine Drainage Using Copper Mining Processes as an Example

    By M Ruhrberg, J Grassmann, C Bauer

    Within the context of acid mine drainage (AMD) associated with mining activities worldwide there has been a tremendous research effort to determine the extent of AMD and assess the influencing factors

    Jan 1, 2003

  • AUSIMM
    Production of Self-Fluxed Pellets and Improvement of Quality

    By Hanaoka K, Ikeda K

    Kakogawa Works, Kobe Steel, Ltd. has two pelletizing plants and one sintering plant, and the blast furnaces have been operated with 30 - 50% pellets. At Kakogawa Works, various improvements in pell

    Jan 1, 1980

  • AUSIMM
    Improving Fine Particle Flotation Selectivity at Hellyer

    By Richmond GD

    The Hellyer concentrator of Aberfoyle Limited commenced production in 1989 processing a fine grained, massive sulphide ore containing Zn, Pb, Ag, Cu and Au as values. Four concentrates are produced

    Jan 1, 1993

  • AUSIMM
    Technical Note on Upgrading of Contaminated Zinc Concentrate at Mount Isa Mines Limited

    About 11,000 tons of contaminated zinc flotation concentrate were available in the form of earth walls from dams used for atmospheric drying of the concentrate.Following successful laboratory tests th

    Jan 1, 1968

  • AUSIMM
    Geology and Ore Deposits of Masara Mine, Davao del Norte, Philippines

    By Estoque J, Lodrigueza L, Rebillon F

    Ore mineralization in Masara consists mainly of gold-silver veins, porphyry copper and pyrometasomatic deposits related to left-lateral movements along the Philip- pine fault system and a later sta

    Jan 1, 1987

  • AUSIMM
    Land Usage - Impact of Temporary Use

    In his introductory remarks Mr. MacKellar referred to three types of development which may be considered to compete with mining for land use. 1. Total Development - in which he cited urban developmen

    Jan 1, 1971

  • AUSIMM
    Opening Address (5eb675c1-7727-4226-8a83-797323192c83)

    Mr. Chairman, Distinguished Guests, Ladies and Gentlemen. I was delighted to be invited, and to accept the invitation, to welcome to this specialist meeting on an intriguing subject, the local par

    Jan 1, 1981

  • AUSIMM
    Case Study of Installation of Compact Bucket Wheel Excavators on Ironsands at N.Z. Steel

    By Hogan C. J

    The compact BWE system set up in 1984 to mine ironsand dunes and the underlying ironsand-clay has been an effective high volume produc- tion unit for New Zealand Steel Mining Ltd at the Waikato North

    Jan 1, 1989

  • AUSIMM
    Fundamental Study on Granulation of Sinter Raw Material Mixture

    By Sato S, Kawaguchi T

    The granulation and bed-permeability of sinter raw materials depend on interactions between the properties of various iron ores and water. The properties of individual iron ores are controlled by

    Jan 1, 1980

  • AUSIMM
    Some Applications of Two-Colour Pyrometry to Pyrometallurgical Research

    A very sensitive high-speed two-colour pyrometer was built to measure the temperature of single particles of sulphide mineral, typi- cally 50 pm in diameter, as they burnt while entrained in a hot

    Jan 1, 1984

  • AUSIMM
    Rogers Pass Tunnel - Bore and Blast

    By Hansmire WH

    The 14.7 km Mt. MacDonald Tunnel beneath Rogers Pass in Canada used both drill-and-blast and machine boring methods. A unique ventilation system provides for diesel operations. The design featured

    Jan 1, 1987

  • AUSIMM
    Retreatment/Flotation Rationalisation at Renison

    Revised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap

    Jan 1, 1991

  • AUSIMM
    HellyerÆs Innovative Escapeway

    By Will D. P

    A 328 m, 2.4 m diameter raise-bored shaft has been equipped with a modular ladderway system to provide a second means of egress from Aberfoyle's Hellyer Mine in Tasmania. The modular ladderwa

    Jan 1, 1988

  • AUSIMM
    Solvent Extraction at Rum Jungle

    Consideration was given to the.applicab on of a solvent extraction circuit to be'included in the process'for the-recovery of a high grade product from.:-the Rum Jungle Creek.South uranium or

    Jan 1, 1963

  • AUSIMM
    Platinum Group Metal Analysis-An Overview

    By Price B. D, Staunton W. P

    The Mineral Science Laboratory of the Government Chemical Laboratories has recently investigated various procedures for the analysis of the platinum group metals (PGMs). This investigation covered

    Jan 1, 1987

  • AUSIMM
    Influence of Blast Furnace Operating Parameters on Top Gas Temperature Distribution

    The recent installation of top gas temperature probes in blast furnaces at Australian Iron & Steel Pty. Ltd. - Port Kembla, has provided the means for studying radial gas flow distribution in blast f

    Jan 1, 1975

  • AUSIMM
    Kwinana Nickel Refinery - Recent Plant Changes

    By Troman L, Groutsch J. V

    The Kwinana Nickel Refinery began operations in 1970 processing sulphide concentrates from Kambalda using the Sherritt Gordon pressure leach and hydrogen reduction process to produce nickel metal as

    Jan 1, 1996

  • AUSIMM
    Museum Station -Construction

    By Withington J. T

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981