Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    Optimization of Cemented Rockfill Practices for Sublevel Stoping Mining System

    By Muhammad Zaka Emad

    ABSTRACT: Sublevel stoping mining methods with delayed backfill employs cemented rockfill (CRF) as a backfill material. It is used in underground mines to achieve ground control and reduce wall slough

    May 1, 2013

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • CIM
    Optimization of Cu SX by Control of the Acidity

    By B. Grinbaum

    The solvent extraction of Cu from acidic leach solutions is carried out using oxime extractants. The mechanism can be described as liquid ion exchange, where a labile H+ in the oxime replaces Cu++ ion

    Jan 1, 2007

  • CIM
    Optimization of Die Cooling in the Aluminum Alloy Wheel Casting Process

    By Jianglan Duan, Steve L. Cockcroft, Andre B. Phillion, Carl Reilly, Daan M. Maijer

    "In the aluminum alloy wheel casting process, careful design of the cooling system in the die and its operation (cooling channel timing) are critical to achieve quality and productivity goals. The pro

    Jan 1, 2014

  • CIM
    Optimization of Effective Parameters in Gold Extraction Process from Poly Metal Ore, Using Thiourea as a Cyanide Alternative and Sodium Cyanide

    By P. Karimi, A. Amini, H. Abdollahi, A. Mirzaeian

    Due to detrimental effects of cyanidation process on the environment in gold industry, application of cyanide alternatives such as thiourea are being highly considered in recent projects. In this stud

    Jan 1, 2016

  • CIM
    Optimization of Industrial Copper Electrowinning Solutions

    By Corby G. Anderson

    "Laboratory testing using industrial electrowinning solutions was performed to determine the best Faradic cell efficiency for copper cathode recovery. The variables tested were solution flow rate, rec

    Jan 1, 2016

  • CIM
    Optimization of Microwave-Ultrasound Assisted Leaching of Copper Anode Slime Based on Central Composite Design

    By Z. Y. Ma, H. Y. Yang

    The process of microwave-ultrasound assisted leaching of valuable metals from copper anode slime was proposed in this paper. Design of experiments has been used to study the effect of the main leachin

    Jan 1, 2014

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • CIM
    Optimization of POX-CIL Process for Refractory Gold-Bearing Concentrates Treatment

    By Y. Y. Yemelyanov, S. S. Gudkov, A. V. Boldyrev, A. V. Bogorodskiy, S. V. Balikov

    "A series of tests to optimize pressure oxidation- carbon-in-leach process (POX-CIL) of goldbearing flotation concentrate with the addition of sodium chloride and activated carbon were carried out. Fl

    Jan 1, 2016

  • CIM
    Optimization Of Proceeds in Changing Market and Mining Conditions

    By Stanley G. Butcher

    Predictions of coal cleaning plant performance from the washability data are traditionally used at the conceptual design stage of a coal preparation plant to confirm process selection. The development

    Jan 1, 1979

  • CIM
    Optimization of Process Variables During TLP Bonding of Nickel Superalloys

    By M. Medraj, M. A. Arafin, D. P. Turner, P. Bocher

    In this study, the kinetics of isothermal solidification during TLP bonding of Inconel 625 and 718 superalloys with nickel based multi-component filler alloy BNi-2 have been studied through a combinat

    Jan 1, 2006

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Optimization of Sputtered Ti/Mo/ Au Metallization System for Solder Bonding

    By S. Akhlaghi

    In many electronic/optoelectronic devices, interaction between the metal stack and solder is undesirable. If a reaction happens, a nonuniform joint containing spikes and voids is likely to form and as

    Jan 1, 2006

  • CIM
    Optimization of the building ventilation of a bath treatment plant of an aluminium smelter using CFD modelling

    By E. Dernedde

    Industrial plants located in the province of Quebec, Canada, are subjected to large variations of the ambient air temperature, Building ventilation systems of these plants must have some flexibility i

    Jan 1, 2005

  • CIM
    Optimization of the Damang Mine

    By Charles Amoah

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012