Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    The Valuation of Advanced Mining Projects & Opera Ting Mines: Market Comparable Approaches

    By Craig Roberts

    "While various methods are available to estimate a mining project's value, value is only established through a transaction. Comparable methods allow the value estimated for a mining project to be benc

    Jan 1, 2003

  • CIM
    The Valuation of Ore in a Prospect

    By D. C. McKechnie

    To the examining engineer, the ever-recurring problem involving the valuation of ore in a prospect presents at different times highly divergent aspects- some entirely physical or mathematical, others

    Jan 1, 1930

  • CIM
    The value of decelerometer testing

    By Keith Jones, Largo Albert

    "Decelerometer testing of a rigid guide system in a mine shaft pro vides usefuI information to operating and maintenance people. High acceleration/deceleration rates can lead to high maintenance costs

    Jan 1, 1984

  • CIM
    The Value of Good Sampling and the Effects on Net Smelter Returns

    By Douglas Brand

    "The data that many mineral processing plants make use of, is provided by samples taken from sampling systems which are inadequately designed or improperly maintained, and therefore cause detrimental

    Jan 1, 2016

  • CIM
    The Value of Oil Emulsion Drilling Muds in Canada

    By John C. Luck Jr.

    "DEVELOPMENT of oil emulsion mud dates back to the early days of rotary drilling when oil was added to the drilling mud solely for the purpose of freeing stuck drill pipe. After the drill pipe was fre

    Jan 1, 1954

  • CIM
    The Value of Orebody Power Requirement Profiles for SAG Circuit Design

    By Chris Bennett, Glen Kosick

    "Process modeling and equipment sizing procedures for SAG circuits has advanced significantly over the past two decades. However, no matter how exact the hardness tests, models and scale-up calculatio

    Jan 1, 1999

  • CIM
    The Value of Topographical and Geographical Maps

    By K. G. Chipman

    The Geological Survey is the oldest map making department in the Canadian Government service, and when organized in 1842, one of the first principles to be recognized was the absolute necessity of hav

    Jan 1, 1924

  • CIM
    The vector equations of steeply dipping veins and their intersections from drillhole data

    By J. H. Archibald

    "This paper describes the use of vector analysis for determining the intersection of mineral deposit veins. The mathematical evolution of the analysis is outlined.IntroductionMany mineral deposits can

    Jan 1, 1983

  • CIM
    The ventilation challenge

    By S. G. Hardcastle, C. K. Kocsis

    "Worldwide, metal mines are going deeper. For example, in Canada there are six such mechanized mines planning production at 3000 m (10 000 ft). Working at such depths challenges all aspects of mining

    Jan 1, 2004

  • CIM
    The Ventilation Challenge ? A Canadian Perspective on Maintaining A Good Working Environment in Deep Mines

    By Stephen G. Hardcastle

    Worldwide, metal mines are going deeper. For example in Canada there are six such mechanized mines planning production at 3000m (10,000?). Working at such depths challenges all aspects of mining inclu

    May 1, 2003

  • CIM
    The versatility of a mobile hoist rope winder

    By R. A. McIvor, R. S. Rafuse

    "INCO Limited purchased a custom designed mobile hoist rope winder/tensioner in 1988 from TimberLand Equipment Limited to handle Large hoist ropes and serve as an emergency hoist. This paper describes

    Jan 1, 1995

  • CIM
    The Victor Project ? Ontario?s First Diamond Mine

    Agenda ? Where?s Victor ? What work was done to get approval to spend $982m ? a brief history ? Some project facts ? The triple bottom-line accomplishments to date ? Construction A Brief History

    May 1, 2006

  • CIM
    The Voisey?s Bay Project2002 ? 2006

    By Dave Stefanuto

    Voisey?s Bay Project Components ? Mine/Mill Port In Labrador ? Mini Plant in Mississauga ? Demonstration Plant in Argentia ? Supply Vessel (Umiak1) ? Transshipment Facility (Quebec) ? Concentr

    May 1, 2006

  • CIM
    The Wabana Iron Ore Properties

    By C. M. Anson

    Introduction The prosperity of any country today is dependent upon the efficiency and growth of its primary steel industry. The ?march of the United States of America to its present commanding positi

    Jan 1, 1951

  • CIM
    The Wabush Mines Concentrator

    By Timothy R. Eby

    "The Wabush Mines project was formed in 1956 to develop a large iron ore property in Western Labrador. The town of Wabush along with the mining and concentrating facilities are located 640 air miles f

    Jan 1, 1978

  • CIM
    The Wasamac Mill

    By H. W. Hughes

    "The Wasamac Gold Mines mill, situated 10 miles from Rouyn-Noranda on highway 59, commenced milling April 1st 1965 at a rate of 700 tons per day. This has gradually increased to over 1200 tons per day

    Jan 1, 1966

  • CIM
    The Wawa diamond enigma

    By J. Buckle

    "Recognition of the diamond potential of the Wawa subprovince was initially determined from regional data using a kimberlite model. The world’s largest stable Precambrian craton, the Superior Province

    Jan 1, 2002

  • CIM
    The wear of materials sliding against road surfaces

    By M. Fiset, D. Belley

    "To better understand the wear process of various materials that may be used as blades on snow removal equipment, the first step is to evaluate the influence of the load applied and the moving speed o

    Jan 1, 1990

  • CIM
    The Wedge Mine-Newcastle-Bathurst Area, N. B.

    By R P. Douglas

    During 1955, Cominco commenced an exploration pro-gram in northern New Brunswick; in the following year, what is now the Wedge mine was discovered. The mineralization is mainly pyrite, with associated

    Jan 1, 1965

  • CIM
    The weighting of assays and the importance of both grade and specific gravity

    By Peter A. Bevan

    "In massive and semi-massive deposits, it is essential to take samples continuously for specific gravity determination as well as for assays of the various metals of interest. Failure to use specific

    Jan 1, 1993