Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Troubleshooting Lonmin Rom Mill Treating Ores Produced by Two Mining Methods (ff932186-0b59-41f9-83e2-8d971c0ed7ba)By E. V. Manlapig, U. Erol, V. Ross, K. Tshimanga
Lonmin RoM ball mills are treating two types of feed ore produced by conventional mining and mechanised mining methods. It was reported that reduction in mill throughput was observed when treating the
Jan 1, 2012
-
Truck dispatching and simulation methods in open-pit operationsBy P. K. Chatterjee
"The operations of a large-scale open-cut mine are simulated to produce a user-oriented interactive digital model. SIMULA is chosen as the programming language and a sophisticated data base system is
Jan 1, 1981
-
Truck Lift System? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM
May 1, 2003
-
Truck Selection and Application at HiltonBy L. Price, R. Hortie
Movement of ore and waste from the Hilton Mines pit is accomplished by truck haulage. With the aim of reducing costs, a study of truck fleet replacement was initiated. The study included on-site short
Jan 1, 1971
-
Truck Shovel User GroupPurpose of TSUG Continuous Improvement in Mining Share Best Practises Exchange Ideas Network for Frontline Supervisors and Middle Management Meetings ? Two per Year -Spring and Fall ? Thirt
May 1, 2010
-
Truck Shovel Users GroupTSUG Presentation Overview What/Who we are? Objectives & Mandate How to become a member (who qualifies)? Meeting Agenda?s & Frequency Q & A SMART is an association of mining companies that meet
May 1, 2008
-
Truck-haulage economics of mining open pits by high benchBy Zhongxue Li
This paper reviews an analytical model that defines the relationship of weight-weighted or volume-weighted average haulage distance with bench height and other related parameters, presents the optimum
Jan 1, 1995
-
Truck-shovel optimization accounting for cost, safety, and operational practiceBy C. O. Aksoy, H. Kose, K. Ozfirat, T. Malli, A. Gonen, S. Gurgen
In selecting mobile mining equipment, factors including availability, useful economic life, maintenance and operating costs, and spare parts availability are considered. Given these factors, trucks an
Jan 1, 2005
-
TSM: A Case Study in Closing the Performance GapBy Gordon R. Peeling
The Problem Five years after the consensus of the Whitehorse Mining Initiative the industry was losing public confidence Public opinion surveys ranked mining just above the tobacco industry Proje
May 1, 2013
-
TSP-Based Model for on-Site Material Handling Operations with Tower CranesBy Amir Zavichi
Today, with the necessity of timely, on-budget and high quality completion of projects, proper use of construction equipment is essential to ensure project success. Construction equipment places a lar
Aug 1, 2013
-
TSX Company Manual – Appendix B - Disclosure Standards for Companies Engaged in Mineral Exploration, Development & Production"The standards set out requirements of the Toronto Stock Exchange for company’s providing information to investors, regulators and/or the media regarding their mineral properties. In addition, informa
Jan 1, 2003
-
TSX Venture Exchange Corporate Finance Manual – Appendix 3E - News Release Guidelines"These guidelines set out information on timely disclosure of news releases which are intended to provide, existing shareholders and potential investors, factual information on which a reasoned invest
Jan 1, 2003
-
TSX Venture Exchange Corporate Finance Manual – Appendix 3F - Mining Standards Guidelines"This document establishes standards and guidelines for scientific and technical disclosure by Issuers listed on the TSX Venture Exchange on their mineral properties. It incorporates and expands upon
Jan 1, 2003
-
TSX Venture Exchange Corporate Finance Manual – Appendix 3G - Valuation Standards and Guidelines for Minerals Properties (2004)"This document sets out the Exchange’s expectations and requirements for a valuation of mineral properties and outlines: the general purpose of valuation reports; guidelines respecting circumstances w
Jan 1, 2003
-
TUFFSTUDDS-A new wear protection systemBy V. Silins, J. Tameling, R. C. Cook
"A general review of the wear problems encountered in the mining industry is presented and current practice for wear protection systems is reviewed.A new concept in wear protection is described and co
Jan 1, 1982
-
Tulsequah AreaBy Alexander Smith
"The three principal known mineral deposits of the Taku River area lie in the Tulsequah synclinorium. The axis of this north-south trending structure is along Tulsequah River valley; about 6 miles eas
Jan 1, 1954
-
Tuluwaka Mine – From Greenfield to Production in 14 MonthsBy Ross Nairn
"Tulawaka Mine is a joint venture between Pangea Minerals Limited 70% (a wholly-owned subsidiary of Barrick Gold Corporation) and Northern Mining 30%. Tulawaka Mine is located in North West of Tanzani
Jan 1, 2006
-
Tumbler Ridge: a new approach to resource community developmentBy R. A. Rabnett, G. Paget, Patrick Walsh
"Tumbler Ridge, Canada's newest resource community, has been developed differently than have been other resource communities.Since its conceptualization, emphasis has been placed on the establish
Jan 1, 1983
-
Tungsten Carbide Bits at the Britannia MineBy P. W. Billwiller
Abstract The Britannia Mining and Smelting Company, Limited, have replaced diamond drills with percussion drills and tungsten: carbide bits for most of their blast hole drilling operations and have
Jan 1, 1950
-
Tungsten Carbide Drilling at the Sullivan MineBy J. W. Reynolds
Introduction The Sullivan mine, at Kimberley, B.C., is the principal source of ore for the Consolidated Mining and Smelting Company of Canada, Limited. Current production amounts to about 2,500,000 t
Jan 1, 1951