Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Applications of Liquefied Gases for Mines and Introduction of a Cryogenic Ventilation Concept

    By J. K. Shaw

    The science of low temperature engineering is well entrenched in mining. Uses for common cryogens, including liquid oxygen (LOX), liquid nitrogen (LN2), and liquefied natural gas (LNG) in the gas and

    Aug 1, 2013

  • CIM
    Validation of Rolling and Steer Resistance of Articulated Tracked Robot

    By M. J. Lopatka

    This paper presents the results of field test and theoretical analysis driving resistance articulated 4x4 tracked robot test-bed. Tests were made on four different grounds. Designated elastomeric trac

    Aug 1, 2013

  • CIM
    Design of Extra-Large Coal Preparation Plant in China

    By Minghui Li

    China is the largest coal producer in the world. In 2012, the coal production in China is 3.65billion tonnes, accounting for approximately 49% of global coal production. The raw coal production in 201

    Aug 1, 2013

  • CIM
    The Impact of Copper Mine Tailings Dam on the Groundwater Quality

    By A. Torkian

    Process water from production of concentrates in Meydook copper sulfide mine is transferred to the 8.3 million m3 tailings dam and a water retention pond after initial thickening. Elevated concentrati

    Aug 1, 2013

  • CIM
    Rock Breakage by Hydraulic Hammer: Comparative Study Between Scale Model in Laboratory and in Numerical Simulations

    The dynamic breakage process of rocks by the impact of a hydraulic hammer is more complex than one normally assumes. It is even more difficult when one has to conduct the breakage under water. In such

    Aug 1, 2013

  • CIM
    Tracking Hauling Trucks for Cut-Fill Earthmoving Operations

    By Ali Montaser

    Hauling trucks are important part of equipment fleets for large earthmoving operations such as those encountered in dams and highway construction projects. This paper presents an automated methodology

    Aug 1, 2013

  • CIM
    Possiblity of Harvesting Heat from Backfilled Mine Stopes

    By S. A. Ghoreishi-Madiseh

    Underground mines, with their relatively high ground temperature and their extensive backfilled stopes provide a great opportunity for producing geothermal heat. The novel idea of installing a network

    Aug 1, 2013

  • CIM
    The Journey from Compliance-Based Safety to Safety; A way of Life

    By Richard Wells

    Peabody Energy is the largest pure-play publicly traded coal company in the world. We have been in business 129 years and like most of the coal mining companies in the United States, since 1969 the ma

    Aug 1, 2013

  • CIM
    Mapping the Future of Occupational Health and Safety in the Nigerian Mining Sector

    By Iwueze Anaekperechi Rose

    The International Labor Organization has declared mandatory adequate provision of safe workplace and safety for all workers in all occupations including the mining sector. Early scientists like Agrico

    Aug 1, 2013

  • CIM
    Development of Fail-Safety system for Building Wall Cleaning Robot

    By J. Huh

    Recently, there is growing trend to build the high-rise and install curtain walls. Following this trend, we developed robot for building wall cleaning work, which moves along Built-in guide rail of bu

    Aug 1, 2013

  • CIM
    Earth Observation to Sustain Interaction between Mining Industry, Regulatory Bodies and Local Stakeholders ? The EO-Miners Trialogue

    By H. Hejny

    Given the current status of political discussion in Europe about raw materials issues, the sustainable development of the extractive industry and the reduction of its environmental and societal footpr

    Aug 1, 2013

  • CIM
    How to Identify the Critical Stakeholders in an Interface Management System?

    By S. Shokri

    The increasing size and complexity of mega construction projects result in having several geographically distributed stakeholders, collaborating with each other to successfully deliver the project. El

    Aug 1, 2013

  • CIM
    A New Method for Determination of Outburst Threshold Gas Content Values and its Application at Guqiao Underground Coal Mine, Huainan, China

    By J. Xie

    In underground coal mining, the potential for an outburst of coal and gas is considered to be one of the major hazards. As such, considerable emphasis is given to understanding and preventing such eve

    Aug 1, 2013

  • CIM
    Current Status of the Pebble Creek (North Meager) Geothermal Project, Southwestern British Columbia

    By Mory Ghomshei

    Pebble Creek Geothermal Power project is associated with a massive recent volcanic eruption in Southwestern British Columbia Canada. Slim holes drilled to depths 1100 m in the prospect area, show very

    Aug 1, 2013

  • CIM
    Application of Ultra-Wide Band (UWB) Radar in Detecting Unexpected Utility Lines in Open Cut Operations

    By J. Zou

    Open-cut method is most widely used for shallow utility lines installation. In urban areas, unexpected utility lines buried underground potentially turn open-cut construction into a highly risky opera

    Aug 1, 2013

  • CIM
    Structural Geology and Bench Conditions in the Granite Pit

    By Samuel Nunoo

    Gibraltar Mine is an open pit copper-molybdenum mine in central British Columbia. The stability and potential failure modes of pit walls in the Granite Pit are controlled by the orientations of joints

    Aug 1, 2013

  • CIM
    Shield-Data-Based Horizon Control for Longwall Shearer Guidance

    By M. Holm

    Coal is an important fuel for energy generation, and since there are no adequate alternatives it will also be for the next decades. The deep lying hard coal is important in particular because of its h

    Aug 1, 2013

  • CIM
    Improved Model to Assess Stress Condition on Buried Pipelines Affected by Mine Subsidence

    By B. Qiu

    The large surface ground movements induced by underground mining could threaten the safety of the pipelines laid across the subsidence-prone area. Existing analytical methods for the stress analysis o

    Aug 1, 2013

  • CIM
    Research on Occupational Hazards Supervision Based on the Cloud

    By C. R. Tang

    Due to the current lack of sufficient occupational hazards supervisory staff in China, an occupational hazards supervision regulatory framework is proposed, based on the cloud. Data on respirable dust

    Aug 1, 2013

  • CIM
    Integration of BIM and Automation in High-Rise Building Construction

    By R. Heikkilä

    In this paper the utilisation of building information models (BIM) and construction automation on building sites is discussed. A lot of research has been carried out to develop new applications for us

    Aug 1, 2013