Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Making money from wastes: a custom circuit within Clarabelle Mill

    By Alain Bouchard, Germain Labonté, Jim Barrett

    "Mill feed materials that are not run-of-mine ore are often a challenge for mineral processors and tend to accumulate in stockpiles, where they remain unprocessed for many years and become “slow movin

    Jan 1, 2002

  • CIM
    Challenges In Settling Leached Cigar Lake Ore

    By B. Holaday, H. McLaughlin

    Orano Canada Inc. (Orano) operates the McClean Lake mill, located in the Athabasca Basin region of northern Saskatchewan. It processes high concentration uranium ore, delivered in slurry form from the

    Jan 1, 2020

  • CIM
    The Continuous Separation of Tar Sands by Oil-Phase •Agglomeration

    By B. D. Sparks, I. E. Puddington, F. W. Meadus

    The continuous separation of bitumen from Athabasca tar sands, with a high clay content, has been demonstrated. Recoveries of 95 per cent or higher have been obtained. Further processing of this produ

    Jan 1, 1971

  • CIM
    Engineering and Construction Of Plant and Wharf Facilities

    By F. S. Thurner

    "This paper describes the engineering and construction activities of the ""design-build"" project awarded to the joint venture of Foundation-Comstock-Janin for the construction of the plant and wharf

    Jan 1, 1976

  • CIM
    The separation of chalcopyrite and pentlandite from Inco's Sudbury area ores pilot plant testwork

    By G. E. Agar, W. B. Kipkie, R. A. Tenbergen

    "This paper describes the successful pilot plant testing of a flowsheet, developed at Inca Ltd.'s J. Roy Gordon Research Laboratory (JRGRL), for improved separation of the constituent minerals in

    Jan 1, 1985

  • CIM
    Progress in Dust Control at Ontario Mines

    By Clifford S. Gibson

    A year ago a paper (1) was presented at the Annual Western Meeting of the Institute regarding silicosis in Ontario mines. It described the whole problem as we see it and discussed the means of prevent

    Jan 1, 1939

  • CIM
    The emergence of zinc as an engineering material

    By Gene O. Cowie

    "Zinc, which once enjoyed an unchallenged position in the field of decorative applications, has lost a substantial share of its markets to other materials, particularly plastics. This turn of events h

    Jan 1, 1983

  • CIM
    Microstructure and Hot Workability of Al-Mg-Si Alloy in the As-Cast and Homogenized State

    By P. Leo

    Al-Mg-Si alloys are widely used as medium-strength structural materials; extrusion is the most common processing route. In the present hot deformation investigation of a 6060 alloy, the microstructure

    Jan 1, 2011

  • CIM
    Mining Developments in Western Quebec During 1926 and 1927

    By A. O. Dufresne

    Introductory At the Annual Meeting of the Institute, held two years ago, I had the privilege of presenting a paper on Recent Mineral Discoveries in Western Quebec. In it were pointed out the areas

    Jan 1, 1928

  • CIM
    Eldorado's Port Hope Refinery -1969

    By R. M. Berry

    A brief outline of refining methods used to (1) upgrade yellowcake to nuclear purity and (2) convert the uranium to the chemical and physical forms required by the fuel fabricators is presented. The u

    Jan 1, 1969

  • CIM
    Copper and Tantalum Recovery from Printed Circuit Board

    By J. Sadaki, G. Dodbiba, S. Murakami, T. Fujita, S. Matsuo, H. Ono, K. Okaya

    Printed circuit boards (PCBs) from discarded personal computer (PC) and household appliances were crushed by mechanical crushing or water explosion to remove mounted parts. More parts were stripped fr

    Jan 1, 2011

  • CIM
    Application and Maintenance of Hydraulic Drive Systems in Sherritt’s Concentrators

    By L. H. Smith, D. S. Taylor

    "AbstractSherritt has been applying hydraulic drives to concentrator equipment since 1967. The initial application was made on a bank of 5- by 5-in. slurry pumps. This has now been extended to all slu

    Jan 1, 1977

  • CIM
    Effect of Silicon and Copper Content in the 3XX Series Aluminum Alloys on Thermal Processing and Mechanical Integrity

    By J. H. Sokolowski, R. I. MacKay

    The level of Si and Cu in the 3xx series of alloys affects the volume fraction of the a-Al dendritic phase and the Al-Si eutectic phase. The volume fraction of these phases in turn affects the feeding

    Jan 1, 2006

  • CIM
    Active area control in a fuel cell flow field

    By D. P. Wilkinson

    Flow field design is critical to determining fuel cell performance with respect to operating conditions. Flow fields are normally designed around their maximum power operating point with the goals of

    Jan 1, 2005

  • CIM
    Optimization of Sputtered Ti/Mo/ Au Metallization System for Solder Bonding

    By S. Akhlaghi

    In many electronic/optoelectronic devices, interaction between the metal stack and solder is undesirable. If a reaction happens, a nonuniform joint containing spikes and voids is likely to form and as

    Jan 1, 2006

  • CIM
    Arsenic Removal From Gold-Mine Waste Waters: Basic Chemistry of the Lime Addition Method

    By D. Laguitton

    The basic chemistry of a1•senic related to its dissolution and subsequent precipitation in gold-mine waste waters is discussed. The lime addition methods provides the most economic treatment of arseni

    Jan 1, 1976

  • CIM
    Mining and Geology at' Scully Mine

    By O. W. Borgeson, D. K. Honsberger, R. T. Bell

    The Scully Mine, situated in the Labrador Trough near the Quebec-Labrador boundary, is one of the world's largest continuous ore deposits. This paper outlines the sequence of the mining operations fro

    Jan 1, 1969

  • CIM
    Mechanical Properties of AA7068 Aluminum Alloy Fabricated by Twin Roll Casting and Rolling Process

    By Dong-Hyeun Koh, Yun-Soo Lee, Min-Seok Kim, Hyoung-Wook Kim

    High strength AA7068 (Al - 7.88 wt.% Zn - 2.68 wt.% Mg - 2.07 wt.% Cu) aluminum alloy strip was successfully fabricated by horizontal-type twin roll casting. A simulation technique was used to obtain

    Jan 1, 2015

  • CIM
    Optimization Initiatives at Altonorte on the Path to Becoming a World Class Smelter

    By Beatrice Pierre, Juan Carrasco

    Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001

    Jan 1, 2019

  • CIM
    Canada's Sovereignty in the Arctic Islands

    By W. H. Patterson

    The history and experience of early companies in the Islands is illustrated by the typical transactions of Trans-Western from 1959 to date. Trans-Western had entered into farmout agreements with compa

    Jan 1, 1969