Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Reversed Hot Strain Effects on Aluminum Microstructures

    By H. J. McQueen

    Aluminum was hot worked at 400 - 500°C and strain rates (e ) of 0.004 -0.1s-1, under reversing strains (c) of 0.5 to 0.2 or 0.5 to 0 and also advancing from 0.5 to 1 or 0.5 to 5. Under similar test co

    Jan 1, 2007

  • CIM
    Copper Mountain: Overview on the Grinding Mills and their Dual Pinion Mill Drives

    By M. van de Vijfeijken

    This paper will first give a short overview of the Copper Mountain project in British Columbia, which just has started commercial operation earlier this year. The grinding process with one 34' x

    Jan 1, 2012

  • CIM
    The Wellington Lake Power Project

    By E. M. Stiles

    THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that

    Jan 1, 1940

  • CIM
    Slag Cleaning of Outokumpu Direct-to-Blister Flash Smelting Slags

    By J. Tuominen

    Outokumpu Direct-to-Blister Flash Smelting is currently in operation in two smelters, a third one is under construction and a fourth one is in the design phase. The two smelters in operation are the G

    Jan 1, 2007

  • CIM
    Specifics of Double Refractory Gold Concentrates Pressure Oxidation in the Presence of Chlorides

    By Y. M. Shneerson, P. V. Zaytsev, I. V. Fomenko, M. A. Pleshkov

    A thermodynamic description of the equilibrium in liquid and gas phases under specific conditions of refractory gold pressure oxidation was generated using the HKF theory. The gold behavior was consid

    Jan 1, 2014

  • CIM
    Base Metal Heap and Tank Leaching from a Platreef Flotation Concentrate using Ammoniacal Solutions

    By Jochen Petersen, Caroline Muzawazi

    The technical feasibility of ammonia leaching of PGM bearing Platreef flotation concentrates was investigated as an alternative method for the recovery of base metals prior to precious metal recovery.

    Jan 1, 2014

  • CIM
    Gold Gravity Recovery at the Mill of Les Mines Camchib Inc., Chibougamau, Québec

    By L. Lui, A. Cauchon, A. R. Laplante

    "The gravity circuit at Les Mines Camchib Inc. consists of two pinched sluices to bleed a feed to one of two 76 cm (30"") Knelson concentrator. The Knelson concentrate is upgraded to smeltable grade w

    Jan 1, 1990

  • CIM
    Beneficiation of Lean Iron Ores Solely by Selective Flocculation and Desliming

    By H. O. Lien

    Among the known iron deposits in Canada, many are of low grade and require beneficiation to produce an acceptable blast-furnace feed. Some of the deposits have never been considered for commercial exp

    Jan 1, 1978

  • CIM
    Rope Maintenance on Drum Hoists

    By Burns Sutherland

    Although some mine hoisting systems incorporating steel wire ropes on drum hoists experience completely dependable performance on the hoist ropes for many years, other rope records illustrate an errat

    Jan 1, 1970

  • CIM
    An overview of the early history of the metallurgical industry in Canada

    By P. Tarassoff

    Extractive metallurgy is concerned with the winning of metals from their ores and concentrates. It is therefore not unexpected that extractive metallurgy in Canada has always been closely linked with

    Jan 1, 1999

  • CIM
    Impact of superheat on the microstructural evolution of 356 alloy in SEED Slurry-on-Demand process

    By O. Lashkari

    Swirled Enthalpy Equilibration Device (SEED) is a new patented Slurry-on-Demand, SoD, processing route. The semi-solid slug preparation is carried out by off-center swirling of aluminum melt in a meta

    Jan 1, 2004

  • CIM
    Fine Particle Control to Improve Mineral Handling

    By A. Liem, R. L. Johnson, C. Sturgess, E. Kuzub

    New challenges in mineral processing arise as high-grade ores become less available and the mining industry is forced to exploit lower grade ores. One of the challenges in beneficiating lower grade or

    Jan 1, 2004

  • CIM
    Novel High Efficiency Gold Extraction Process Using Nanotechnology

    By Adil Aledresse, Louis Mercier, Laxman Amaratunga

    "The development of high capacity adsorbents with uniform porosity denoted, MP-HMS (Mercaptopropyl – Hexagonal Mesoporous Structure) using nanotechnology, and their ability to extract gold from soluti

    Jan 1, 2008

  • CIM
    Density and Porosity Concepts for Asbestos and , Other Minerals

    By M. Cossette, P. C. A?tcin

    At present there is considerable confusion in the asbestos industry with regard to density and porosity measurements of asbestos. In order to clarify the situation, various notions of porosity and den

    Jan 1, 1972

  • CIM
    Practical Sampling Techniques

    By M. M. K. McCrank

    "PRACTICAL SAMPLING TECHNIQUESIt is important to achieve reliability when sampling heterogeneous materials where there is a difference in composition, and non random distribution of the constituent pa

    Jan 1, 1989

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • CIM
    Copper and Cadmium Removal from Zinc Sulphate Solution

    By R. G. Helberg, S. M. Rebelo

    "Copper and cadmium are removed from the zinc sulphate solution in primary purification by cementation reaction followed by filtration. The solids are sent to the cake leach section where zinc and cad

    Jan 1, 2012

  • CIM
    Forensic engineering and drive lifetime

    By A. C. Stevenson

    "The most common theory is that, since thyristors, diodes, and insulated gate bipolar transistors (IGBTs) are “solid state” they will live forever. This is not so. They have wear-out mechanisms (e.g.

    Jan 1, 2000

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • CIM
    A Complete System for On-Stream Particle Size Analysis

    By B. F. Osborne

    "A new sensor cannot be considered in isolation from the process in which it is utilized. This paper, describing an on-stream particle size analyzer, therefore gives considerable emphasis to the slurr

    Jan 1, 1972