Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of the Kelsey Centrifugal Jig at Rio Kemptville Tin

    By H. Wyslouzil

    "The Kelsey Centrifugal Jig is a gravity separation device which utilizes the principles of the conventional mineral jigs but with the additional feature of being able to vary the apparent gravitation

    Jan 1, 1990

  • CIM
    Blast optimization and stability enhancement through geotechnical mapping at Highland Valley Copper

    By D. Assmus, S. Daly

    "Poor fragmentation, high toe areas, excessive shovel wear and tear and frequent re-drilling and blasting of certain tough waste rock zones in the Lomex pit in the early 1980snecessitateda better unde

    Jan 1, 1992

  • CIM
    Heat Treated Grinding Rods

    By R. W. Pugh, S. L. Ma

    "High carbon rods are typically used as the grinding media in rod mills. Usually an AISI I 090 grade of steel is used which provides the high hardness needed for abrasion resistance and sufficient tou

    Jan 1, 1993

  • CIM
    Analysis of Particle Size Distribution in Dump Leaching Using Aerial Image Analysis and Verification by Rock Blasting Models

    By Shuo Zhang, Wenying Liu

    "In dump leaching, the efficiency of metal extraction from ores is strongly influenced by the mechanisms of fluid flow. Particle size distribution acts as a fundamental parameter in the determination

    Jan 1, 2017

  • CIM
    Two-Stage Treatment of High Arsenic Synthetic Mine Water at Cold Temperature

    By A. L. Mackie

    Arsenic is a highly toxic element and a known human carcinogen. It is often a contaminant in mine water discharges, particularly from gold mining and roasting operations, and has been found at concent

    Aug 1, 2013

  • CIM
    The Grande Cache Coal project

    By P. Cain, B. Martens

    "Grande Cache Coal (GCC), an investor-owned Alberta company, is in the final stages of the regulatory process leading to the resumption of coal mining in the Smoky River Coal Field of Alberta. Althoug

    Jan 1, 2002

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    A Fundamental Investigation of the Caro’s Acid Cyanide Destruction Process

    By A. M. Simons

    Cyanide destruction by Caro’s acid is one process commonly employed by gold operations to meet regulatory requirements and/or the International Cyanide Management Code compliance for weak acid dissoci

    Jan 1, 2014

  • CIM
    Enzyme leach-based soil geochemistry of the Mountain Lake Diatreme, Alberta

    By D. Roy Eccles

    A multi-element geochemical response, with contrasts of up to 29 times background, was obtained in soil above the Mountain Lake Diatreme, northwestern Alberta. The overall geochemical signature is ind

    Jan 1, 2001

  • CIM
    Bench and Pilot Scale Test Programs to Specify Autogenous Grinding Circuits

    By C. J. Farrow, M. J. Smith

    "Bechtel has managed a number of test programs to establish autogenous grinding circuits and size mills for a variety of ores.This paper outlines the procedures whereby bench scale and pilot plant tes

    Jan 1, 1982

  • CIM
    Geology of the Cargill phosphate deposit iri northern Ontario*

    By PETER O. SANDVIK

    The Cargill deposit, located 32 km south west of Kapuskasing, Ontario, was discovered by International Minerals and Chemical Corporation in 1975 and has been evaluated through an extensive program of

    Jan 1, 1984

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Pretreatment of a Gold Refractory Concentrate: Pressure Oxidation vs Fine Grinding

    By Sergio Romo, Gerardo Fuentes, Adriana Garcés

    Refractory ores with gold entrapped in a sulfide matrix, must be processed in a first stage with chemical or physical treatment in order to liberate the gold for a subsequent step with cyanide. The go

    Jan 1, 2014

  • CIM
    Coal fields of the East Kootenay region, southeastern British Columbia

    By D. A. Grieve

    "Mineable coal seams in the East Kootenay region belong to the Mist Mountain Formation of the Jurassic -Cretaceous Kootenay Group. Three structurally separate coal fields (Crowsnest, Elk Valley and Fl

    Jan 1, 1985

  • CIM
    Improving Underground Mining/Ore Extraction Projects ROI Through Process Control

    By Charles Tkaczuk

    Key issues ? Process control is a corporate function implemented locally. ? Security and documentation is mandatory requiring standard practices. ? Publish and communicate activities (do not re-

    Apr 1, 2005

  • CIM
    An evaluation of groundwater at the Gays River Mine, Halifax County; Nova Scotia

    By T. Lamb, T. Aston

    "The Gays River Mine is located within a complex hydrological regime and underground mining environment. Early in the mine history, the operation was' affected by an inability to control mine wat

    Jan 1, 1993

  • CIM
    A Framework for Integrating Mine Ventilation Optimization (MVO) with Ventilation On Demand (VOD)

    By A. J. Basu

    Air quality in underground mining operations can fluctuate significantly during the working day, but until recently the only way to ensure a mine had sufficient air quality was to over-ventilate and,

    Aug 1, 2013

  • CIM
    The Optimal Block Size in the Block Caving Mining Method

    By J. Someehneshin

    Nowadays along with population growth, industry development, consumption of mineral resources and the fact that the reserves on hand are running out, the depth of surface and underground mines for fur

    Aug 1, 2013

  • CIM
    Surf Inlet and Pugsley Mines

    By J. E. Gill, A. R. Byers

    The Surf and Pugsley gold-copper mines; owned and operated by Surf Inlet Consolidated Gold Mines; Limited; are about 6 miles inland from; the head of Surf inlet; on Princess Royal island; Skeena minin

    Jan 1, 1954

  • CIM
    Using the Discrete-Element Method to Investigate Ball Milling Power Draw, Load Behaviour, and Impact Energy Profile (3f425fb8-db5a-45f1-9f1d-2e50996a242a)

    By M. B. Kime

    "Discrete-element method (DEM) modelling is a powerful tool for studying particulate systems within the mineral processing industry. DEM simulations were conducted to investigate the power draw, load

    Jan 1, 2017