Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Onsite Data Acquisition Using Low Cost Open Source Microcontroller

    By Magdy Ibrahim

    This paper presents experimental design and development of a low-cost remote sensing hardware designed to support automated site data acquisition for near real-time progress reporting of construction

    Aug 1, 2013

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • CIM
    Basics of Dynamic Key Performance Indicators for Haulers in Motion

    By T. G. Joseph

    ABSTRACT: The Canadian oil sands provide some of the harshest mining conditions in the world. Asoperations demand ever bigger tools, the toll on large mobile mining equipment is high, with structura

    Jan 1, 2011

  • CIM
    Determining the oil sands mining limit with Lerchs-Grossmann optimization

    By L. Chunpongtong

    The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents a mathema

    Jan 1, 2014

  • CIM
    Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimization

    By L. Chunpongtong

    ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents

    Jan 1, 2014

  • CIM
    Wabana Iron Ore Deposits

    By John C. Lyons

    "The Wabana iron ore deposits occur as flat-dipping beds of oolitic hematite and chamosite, of Lower Ordovician age, which outcrop for 3 miles along the northwest coast of Bell Island, Conception Bay,

    Jan 1, 1949

  • CIM
    The Valuation of Advanced Mining Projects & Opera Ting Mines: Market Comparable Approaches

    By Craig Roberts

    "While various methods are available to estimate a mining project's value, value is only established through a transaction. Comparable methods allow the value estimated for a mining project to be benc

    Jan 1, 2003

  • CIM
    New Failure Prediction Method for Underground Excavations

    By D. Milne, G. Snell

    "A new method to predict stope hangingwall failure in underground excavations is proposed. This method compares movement rate for stope hangingwalls, determined from changes in strain or deformation,

    Jan 1, 2018

  • CIM
    Advantages of Bottom Entry Oxygen Introduction for Pressure Oxidation

    By J. Lammers, D. Adams

    Most pressure oxidation operations introduce oxygen through a large multi-use nozzle in the vapour space of the autoclave. Sparge pipes extend inside the vessel to the point of discharge below the com

    Jan 1, 2004

  • CIM
    Sustainable Mining and the Green Mining Initiative

    By Louise Laverdure

    The Canadian mining sector has to be innovative and invest in the development of sustainable mining technologies to maintain its international leadership. Natural Resources Canada (NRCan) collaborated

    May 1, 2011

  • CIM
    Flotation and Hydrometallurgy Research on Brunswick Tin Mine Ores

    By E. W. J. Thornton

    During the past six or seven years extensive research has been performed on ore samples procured at the Bruns1,vick Tin Mines which is located in the south-west corner of New Brunswi.ck. This property

    Jan 1, 1977

  • CIM
    Conventional Shaft Sinking Unconstrained by Equipment Availability

    By S. W. Henley

    "Shaft sinking design is typically driven by what has been successful in the past and the availability of sinking plant. This document considers a project where the sinking design and methodology is u

    Jan 1, 2019

  • CIM
    A Year of GPS at Fording Coal Limited, Greenhills operations

    By Robin Sheremeta

    Fording Greenhills first acquired GPS (Global Positioning System) technology with the commissioning of a GPS-based dispatch system in December 1994. The second exposure to satellite technology came wi

    Jan 1, 1996

  • CIM
    Optimal Synthesis of Energy Supply Systems for Remote Open Pit Mines

    By M. Carvalho

    The primary motivation underlying the proposal of polygeneration systems for mine sites is to increase the efficient use of natural resources by combining different technologies and energy resources w

    Aug 1, 2013

  • CIM
    Geology, alteration and zoning patterns of the Mt. Milligan copper-gold deposits

    By C. DeLong

    "The Mt. Milligan porphyry copper-gold deposits are in central British Columbia, 155 km northwest of Prince George. Mineralized outcrops and float were discovered in the Mount Milligan area by prospec

    Jan 1, 1995

  • CIM
    Geology of the Twin "J" Mine

    By John S. Stevenson

    THE Twin "J" Mine, operated by Twin "J" Mines, Limited, represents an amalgamation of the old Lenora, Tyee, and Richard III mines (see Figure 1) on mount Sicker, eight miles by road, northwesterly, fr

    Jan 1, 1945

  • CIM
    Meeting the Challenges of Gold Exploration through Earthprobe High Resolution Borehole and Surface IP

    By R. Gordon, J. Palich, W. Qian

    The EarthProbe DCIP system deploys tightly spaced electrodes connected to a centralized data acquisition system that enables arbitrary selection of current and potential electrodes through relays. Rap

    Jan 1, 2011

  • CIM
    Water Management in Hydraulic Fill Operations

    By M. Helinski

    In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,

    May 1, 2007

  • CIM
    Fine sizing by Cyclosizer and micro-sieve

    By M. Leroux, J. A. Finch

    "Sizing below 38 µm (400 mesh) is an increasing requirement in mill testing laboratories. The Cyclosizer is gaining wide acceptance in this role. A recent alternative is to use electro-formed sieves (

    Jan 1, 1982