Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Carbon Scout – Automating Carbon Measurement and Control in CIP/CIL Circuits

    By W. Lodge, G. Rasmussen

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery technology since the 1980s. During all this time carbon measurement, and control of the carbon transfer pumps has been largely man

    Jan 1, 2018

  • CIM
    Asymetric Buckling Of Circular Rings in a Confined Environment. “Amstutz Buckling” – An Enhanced Approach

    By A. Pearson, F. A. Auld, S. O. Colbeck

    """The theory of buckling of shafts and Steel tunnel-linings"" was published by E. Amstutz in 1970 and commented on by S. Jacobsen in 1974. The authors have revised and enhanced Amstutz’s work to addr

    Jan 1, 2019

  • CIM
    Modeling the Post-Peak Strength Degradation on Tunnel Stability

    By F. Y. Hsiao, H. C. Kao

    Underground excavation in hard rock is normally stable at shallow depth except for wedge failure. However, the excavation depth is rapidly increasing recently. In high overburden stress condition, the

    Jan 1, 2015

  • CIM
    Evaluation of Agitated Milling at Heath Steel Mines

    By J. Wild, M. Ounpuu, G. Chevalier

    "The requirements for a finer grind at Heath Steele have resulted in the investigation of agitated milling as a cost effective alternative to conventional tumbling ball mills.The grinding unit is a ve

    Jan 1, 1993

  • CIM
    Modeling of CBM Recovery in the Amasra Coalfield, Turkey

    By K. Baris

    Methane (CH4) present in coal seams, generally known as Coalbed Methane (CBM), Coal Mine Methane (CMM) or Coal Seam Gas (CSG), is a major energy source, as it is the primary constituent of natural gas

    Aug 1, 2013

  • CIM
    Preface: The Pembrey Electrorefinery Technological Innovation and Realization in the Victorian Era

    By A. E. Wraith, J. Protheroe Jones, P. J. Mackey

    INTRODUCTION When Victoria became queen in 1837, that technical wonder of the 19th century—electricity— had progressed from being an exciting physical curiosity and was now a field of intense scientif

    Jan 1, 2019

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • CIM
    Linkages between Geological Branch studies, geological knowledge, and exploration success in British Columbia

    By A. Sutherland Brown

    "The ProblemMany science activities receive substantial funding from governments without much direct economic benefit accruing to state or individuals. In contrast, the search for knowledge has never

    Jan 1, 1986

  • CIM
    Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests

    By A. S. Moghaddam

    The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe

    May 1, 2007

  • CIM
    Enhanced Flotation of Platinum Mineral Fines through Feed Cavitation

    By A. Singh

    "Flotation of fine (< 10 µm) minerals is a challenge exacerbated by the emerging practice of fine grinding flotation feed to better liberate targeted minerals; however, the ability of conventional flo

    Jan 1, 2018

  • CIM
    The Development of a Small Scale Test for Rapid Characterisation of Flotation Response (JKMSI)

    "The characterisation of resources and description of variability across different ore domains is key to accurate prediction of probable metallurgical performance. Such characterisation testwork often

    Jan 1, 2013

  • CIM
    Meeting the Challenge of Goro

    The Project ? $1.4 billion project ? 59,000 tonnes of nickel and cobalt ? Large resource base ? First production end of 2004 The Place ? Half the size of Vancouver Island ? Population 210,000

    May 1, 2002

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Grinding Circuit Design for Similco Mines

    By Anita Marks

    In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197

    Jan 1, 2012

  • CIM
    Arctic Resource Development Challenges for Environmental Approvals

    By Nick Poushinsky

    OVERVIEW OF PRESENTATION ?Stantec?s Northern Presence ?Challenges for Northern Development ?Environmental Approval Challenges ?History/Expectations ?Baseline Data ?Consultation ?Regulatory Pr

    May 1, 2009

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    Quench-textured, pillowed metabasalts and copper mineralization, Maybrun Mille, northwestern Ontario

    By P. C. Thurston, T. Setterfield, D. H. Watkinson

    "The Maybrun copper deposit IS In a succession of pillowed basaltic flows in the Wabigoon sub-province, northwestern Ontario. The rocks have primary flow morphologies and remarkably well-preserved cry

    Jan 1, 1983

  • CIM
    Process Control at Heath Steele Mines Limited

    By Mike Sapiro

    "Heath Steele Mines is a base metal producer situated near Newcastle, N.B. presently treating 3500 TPD of complex Cu-Pb-Zn ore. The ore consists of massive fine grained sulfides averaging I. 1% Cu, 1.

    Jan 1, 1977

  • CIM
    Geology of the Brunswick Mining and Smelting Orebodies, Gloucester County, N.B.

    By E. R. Lea

    The B. M. & S. orebodies, consisting of the No. 6 (Brunswick) and the No. 12 (Anacn Leadridgz, have the distinction of being the first major 1base metal ore deposits to be found in the Province of New

    Jan 1, 1958

  • CIM
    Management of Copper Solvent Extraction Plants Running At Reduced Throughput

    By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu

    Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati

    Jan 1, 2019