Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Introduction of sequential blasting at Mines Gaspe, Murdochville, Quebec

    By Robert J-M Ethier

    "Sequential blasting has been introduced at Mines Gaspe to reduce the harmful effects associated with the instantaneously primed blasting method. Three stages of modifications had been tried to improv

    Jan 1, 1984

  • CIM
    An Environmentaly Friendly Process for the Full Recovery of Zinc and Other Valuable Metals from Roasted Zinc Concentrates

    By Francisco Tamargo

    "This paper refers to a new process for the full recovery (above 98%) of zinc and other valuable metals (Pb, Ag, Au) accompanying zinc in its concentrates while iron is separated as a marketable produ

    Jan 1, 2016

  • CIM
    Moul Ton Hill Deposit

    By N. W. Martison, J. E. Hawley

    "The Moulton Hill deposit is in the Eastern Townships of Quebec, 3 miles northeast of Sherbrooke. It is complex, both structurally and mineralogically, consisting of a narrow, irregular, mineralized z

    Jan 1, 1954

  • CIM
    Re-Grind Practice at Canadian Exploration Limited

    By H. A. Steane

    THIS PAPER describes the re-grind section in the 2,000-ton per day, lead-zinc flotation mill of Canadian Exploration Limited, near Salmo, B.C. There are two re-grind units in operation, one in the l

    Jan 1, 1958

  • CIM
    Canam Deposit

    By W. R. Bacon

    "The Canam property is in southern British Columbia, 24 miles southeast of Hope. It is reached by 5 miles of road from Mile 26 on the Hope-Princeton Highway.Between the years 1930, when the property w

    Jan 1, 1949

  • CIM
    Deep-Seated Structurally Controlled Landslides of Corinth Gulf Rift Zone, Greece: The case of Panagopoula Landslide

    By S. Papanakli, Th. Rondoyanni, N. Sabatakakis, K. Kavoura, G. Tsiambaos

    "A representative composite fault-related landslide of the Corinth Gulf graben named “Panagopoula” is reported that considered to be one of the most prone to slope instability sites along the main mot

    Jan 1, 2015

  • CIM
    Highwall Coal Recovery

    "Line Creek Resources Ltd. produces three million clean tonnes per year of metallurgical and thermal coals for the international market. The mining operation, which is located in the mountains of sout

    Jan 1, 1995

  • CIM
    Effect of Grinding Method on Morphology of Iron Ore Concentrate

    By M. Saghaeian, R. Hejazi, Sheikhzadeh. V., A. Abazarpoor

    "The morphology of iron ore concentrate particles is known to influence several properties of iron ore pellets, including drop number, compression strength, and reduction properties. This study aimed

    Jan 1, 2016

  • CIM
    The Evolution of Uranium Mill Tailings Management

    By C. R. Edwards, D. G. Feasby

    "Over the last 50 years disposal of uranium mill tailings has evolved from dumping untreated tailings into the nearest depression to depositing chemically-stabilized tailings into highly engineered ma

    Jan 1, 1996

  • CIM
    Comparison of surface and underground disposal of tailings waste

    By D. Bois, F. P. Hassani, M. Hossein

    "A growing environmental awareness hos prompted the mineral industry to seek innovations in waste management and technology. It is estimated that over 500 million metric tonnes of solid waste each yea

    Jan 1, 1994

  • CIM
    Canadian Exploration Incentive Program

    By Robert B. Parsons

    "The Canadian Exploration Incentive Program (CEIP), which was announced by the federal government on May 3, 1988, promises to maintain the viability of flow-through shares as a financing mechanism whi

    Jan 1, 1988

  • CIM
    The Impact of Superfreighters and Nova Scotia Deepwater Ports on Bulk Mineral Distribution and Marketing

    By Roger M. Jones

    This paper comments on developments in bulk shipping which will be of direct interest to those who are considering the shipment of dry bulk minerals out of Nova Scotia by water. Various conveying syst

    Jan 1, 1971

  • CIM
    Operation and Maintenance of Grinding Circuits at Sidbec-Normines

    By Michael Jerome Wallace

    "This paper refers to the wet open circuit ball mil ls in operation at Sidbec-Normines'5 pelletizing plant at Port-Cartier, Quebec, which commenced operations in late November· 1977. Prior to detailin

    Jan 1, 1979

  • CIM
    Mako Single Stage Sag Mill Comminution Circuit Design, Commissioning and Ramp-Up

    By P. Scinto, P. Hudson

    "Modern day ore bodies are becoming increasingly harder, more abrasive and lower grade. The Mako deposit is located in Senegal and consists predominantly of primary mafic and felsic lithology that are

    Jan 1, 2019

  • CIM
    Modelling a semi-batch reactive precipitation of ferrihydrite

    By W. R. Richmond, T. S. Li, D. Ilievski

    The reactive precipitation of ferrihydrite was studied in a laboratory semi-batch precipitator, where a highly concentrated sodium hydroxide solution was fed into an iron nitrate solution. Instantaneo

    Jan 1, 2005

  • CIM
    Simulators for the Design, Optimization and Control of Gold Ore Processing Plants

    By L. R. P. de Andrade Lima, D. Hodouin

    The paper presents a survey of the possibilities of the simulation techniques for improving the design and operation of gold processing plants. The procedure to construct kinetic models that are used

    Jan 1, 2005

  • CIM
    Clean Coal Production from Coal Washing Plant Wastes

    By M. Özer, F. Boylu, G. Önal

    In this study, the fine coal waste subjected to the experiments is taken from the waste stockpile of Soma Coal Plant. The possibilities of its evaluation and the production of clean coal were investig

    Jan 1, 2004

  • CIM
    Volcanological Reconstruction of the Corbet Breccia Pile, and Cu-Zn Massive Sulfide Deposit, Noranda, Quebec (4e04e1fb-2588-4997-8220-6f15481d7d28)

    By M. Labrie, H. L. Gibson, G. Doiron, J. J. Watkins, D. H. Watkinson

    The Corbet deposit is one of 17 proximal Cu-Zn massive sulfide deposits located. within the Noranda Cauldron which occurs within the core of the Noranda Volcanic Complex. The deposit is located at the

    Jan 1, 1993

  • CIM
    Presidential Address (b1ebe2d7-0ccc-4016-9bb7-570339ad7bb8)

    By S. A. Willis

    For the past several months 1 have been considering the functions of this Society and its reasons for continuance. The fact that it is now sixty years old indicates that it must have been of value and

    Jan 1, 1947

  • CIM
    Numerical Modelling of Rock Fracture with the Embedded Discontinuity Approach Incorporating Heterogeneity

    By T. Saksala

    In this paper, the embedded discontinuity approach is applied to finite element modeling of rock fracture. A rate-dependent constitutive model based on the embedded displacement discontinuity theory i

    Jan 1, 2015