Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fluidized-bed firing of coal for steam generation

    By P. J. Adams

    Environmental regulations require means for controlling emissions of SO2 NOx and particulate when burning coal. The combustion of coal in limestone fluidized beds is one of the most promising techniqu

    Jan 1, 1979

  • CIM
    Precious Metal Refinery Process Selection - An Overview

    By G. Warren

    "In the past, smelting and refining of the precious metals recovered from ore has been generally looked upon as a small and relatively minor component of the business of gold mining. This is not surpr

    Jan 1, 2001

  • CIM
    SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore Grindability

    By F. O. Verret

    Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the

    Jan 1, 2012

  • CIM
    Working within metallurgical limitations in the successful repair welding of power-plant components

    By D. Mills, W. H. S. Lawson

    "The need to make repairs is seldom a major consideration in the design, fabrication and installation of major components of electrical generation plants. Repair welding, however, is a fact of life in

    Jan 1, 1981

  • CIM
    The Murray Deposit, Restigouche County, N. B. A Geochemical--Geophysical Discovery

    By H. W. Fleming

    In 1955, the results of a regional, geological interpretation of the northern portion of New Brunswick were used as a basis for selecting, for intensive exploration, three areas in which structural an

    Jan 1, 1961

  • CIM
    Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mine

    By U. Olsson, M. Ramström

    "The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen

    Jan 1, 2005

  • CIM
    Simulating the Iron (III) Precipitation Rate during Medium Temperature Chalcopyrite Oxidation in Batch and Continuous Autoclaves

    By J. D. T. Steyl

    "This paper presents a phenomenological model of the rate of iron(III) precipitation in batch and continuous autoclaves at medium temperature operating conditions. The rate expressions are based on in

    Jan 1, 2012

  • CIM
    Milling and Metallurgy at the Moneta Porcupine Mine

    By J. P. Dick

    THIS paper is a description of the milling practice and metallurgy at the Moneta Porcupine mine, Timmins, Ontario. The results obtained with an all-cyanide circuit and later with flotation followed by

    Jan 1, 1941

  • CIM
    Improving Construction Environmental Metrics Through Integration of Discrete Event Simulation and Life Cycle Analysis

    By H. Golzarpoor

    Life Cycle Analysis (LCA) is a methodology for evaluating the environmental impacts associated with a product during its life cycle. LCA is identified as the most reliable method for verifying environ

    Aug 1, 2013

  • CIM
    Savage River Mines -The World's First Long-Distance Iron Ore Slurry Pipeline

    By W. F. McDermott

    This paper covers the development, construction and operation of a 53-mile slurry pipeline operating in Tasmania, Australia. Special development techniques are discussed, as well as the operation of t

    Jan 1, 1970

  • CIM
    Numerical Modeling of Damage Patterns around Drifts in the Meuse/Haute-Marne Underground Research Laboratory

    By M. N. Vu, G. Armand, A. Noiret, D. Seyedi

    Extensive experimental observations have been performed around drifts and shafts at the Meuse Haute-Marne (North-Eastern France) Underground Research Laboratory (URL) to assess the extent and pattern

    Jan 1, 2015

  • CIM
    Ammonia Pressure Leach Process for Recovering Nickel, Copper, Nickel and Cobalt From Sulphide Concentrate

    By F. A. Forward

    "IntroductionTHE LYNN LAKE MINE, situated in Manitoba about 150 miles north of Sherridon, has been actively developed by Sherritt Gordon Mines, Limited, during the past seven years, resulting in the e

    Jan 1, 1953

  • CIM
    Analysis of Uranium Ores by Geiger Methods

    By The Staff

    "SummaryDetermination of uranium in ores may be made by measurement of their radioactivity.The method most commonly used is that of measuring beta radiations with the tray-type beta counter. This will

    Jan 1, 1950

  • CIM
    St. Joseph Lead Company's Viburnum Operations

    By Marvin E. Lane

    Viburnum, located in the foothills of the Ozarks in south-east Missouri, is the site of a modern lead mining and milling operation. Two mines are currently producing a total of 5,000 tons per day and

    Jan 1, 1964

  • CIM
    Heat Load Estimation of Conveyed Ore in Underground Mines

    By Jane Li, Kevin Tom

    "Research has shown that broken rock on conveyor transport systems can contribute upwards of 50% towards the overall heat load in underground mines. However, few studies have made significant efforts

    Jan 1, 2019

  • CIM
    Mining Gold Ore at Pioneer

    By Allan P. Fawley

    ONE hundred miles from Vancouver, at an elevation of 4,000 feet, is the Pioneer mine. It is situated on Cadwallader creek, a tributary of Bridge river, and is reached by travelling from Vancouver to S

    Jan 1, 1937

  • CIM
    Advanced Control of Pressure Hydrometallurgical Plants

    By R. K. Jonas

    "Pressure leaching and pressure oxidation in autoclaves are important alternatives in the extractive processing of gold, copper and nickel ores. The application of advanced control to pressure leach a

    Jan 1, 2012

  • CIM
    Metal Mine Ventilation (5a66f77a-e32a-4b69-828a-81ebc3b32b9e)

    By D. Harrington

    Ventilation of underground workings consists in establishment of such control of air currents that the underground workers may work in safety, with maximum comfort and efficiency, and without impairme

    Jan 1, 1933

  • CIM
    Relationship between Porosity and Surface Deposit Coverage for Wire and Arc Additive Manufactured Aluminium Alloy 2319

    By K. E. Harley, M. J. Whiting, T. J. Sabin, E. M. Ryan, J. F. Watts

    "Wire and Arc Additive Manufacturing (WAAM) has the potential to enable a very significant reduction in buy-to-fly ratio compared to conventional manufacturing through the ability to build near-net sh

    Jan 1, 2018

  • CIM
    Predictive Modeling For In Situ Recovery Operation

    By Gwenaële Petit, Ulan Massimkhanov, Gilles Joubert

    For its Zuuvch Ovoo uranium deposit in Mongolia, Badrakh Energy (partly owned by Orano Mining) is working on the prefeasibility study for exploitation by ISR (in situ recovery). As part of this projec

    Jan 1, 2020