Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Maximisation des revenus et du rendement financier par l'optimisation de l'information, de la planification et des pratiques minières

    During the past 10 years, research work to improve the survey of stope limits after mining supplied useful information, particularly for large open and sub-level stopes, regarding waste dilution cause

    Jan 1, 2005

  • CIM
    Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimization

    By L. Chunpongtong

    ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents

    Jan 1, 2014

  • CIM
    Mine Ventilation on Demand System at Nickel Rim South Mine; Testing Procedures, System Maintenance, and Results

    By E. McLaren, J. Sanftenberg, C. Cameron, H. Dello Sbarba

    "A Ventilation on Demand (VOD) system has been optimized and maintained at Glencore’s Nickel Rim South Mine (NRS) in Sudbury, Ontario, Canada for the past seven years. The system monitors and controls

    Jan 1, 2019

  • CIM
    What to do with CIL Carbon Fines? Iamgold’s Innovative Solution

    By J. Girard, V. Aubé, M. Barakate, S. Bellec, M. R. Eddahabi, Y. Chaik, M. Deshaies

    "The activated carbon used in the carbon-in-leach (CIL) process to absorb gold is subject to breakage. This carbon breakage can be minimized, but it will always be necessary to deal with fine carbon p

    Jan 1, 2017

  • CIM
    Adapting Gold Flotation Techniques to Resource Recovery from Municipal Waste

    By M. V. Rowley, D. D. Warkentin

    With high commodity prices, tightening operating budgets and increasing disposal costs, there is an increasing interest in processing municipal waste streams, such as the ash derived from combustion p

    Jan 1, 2017

  • CIM
    On the Calibration of the Potential Technique for Monitoring Corrosion Fatigue Crack Growth Using Finite-Element Method

    When selecting a method for monitoring crack growth in pipeline steel, the sensitivity or crack-size resolution plays a dominant role. Even though there are several visual and non-visual methods, the

    Jan 1, 2005

  • CIM
    General Geology and Ore-Grade Control at the Sherman Mine, Temagami, Ontario

    By R. C. Hartviksen, B. H. Boyum

    "The Sherman Mine, Temagami, Ontario, is an iron ore pellet operation rated at one million tons per year capacity. Mining is done from three open pits in two bands of Keewatin iron-formation intercala

    Jan 1, 1970

  • CIM
    Sustainability Research: Hot Workability for Higher Strength and Reduced Weight: HSLA Steel Products

    By E. V. Konopleva, H. J. McQueen

    Steels in high variety have been providing strength and ductility for more than a century mainly through complex heat treatments following hot shaping. The economical and sustainable goal was a steel

    Jan 1, 2015

  • CIM
    Opportunities for Energy Savings and Energy Recovery Using Indirect Heat Exchangers for Bulk Solids

    By Neville Jordison

    Indirect, gravity flow, heat exchangers have become a well established technology in mineral and metallurgical process plants. The technology is a conventional heat exchanger using high efficiency pla

    Jan 1, 2011

  • CIM
    Advantages And Methods For The Real-Time Detection Of Hydrocyclone Operating Problems

    By M. Mai Manga, M. Renaud, A. Faucher, C. Bazin

    ABSTRACT Grinding circuits are operated in the presence of disturbances resulting from ore changes and equipment malfunctions, such as hydrocyclone overloading, worn or partly plugged apexes, surging,

    Jan 1, 2011

  • CIM
    Studies on Hot Tearing Resistance and Permanent Mold Casting of Aluminum Alloys 535.0 and 206.0 for Automotive Applications

    By M. Sahoo, P. Burke, Y. Fasoyinu, J. P. Thomson

    The effects of grain refinement, mold temperature and chemical composition on the hot tearing resistance of aluminum alloys 535.0 and 206.0 has been studied by pouring constrained rod castings in meta

    Jan 1, 2006

  • CIM
    Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork Program

    By A. Allaire, J. Torrealba-Vargas, R. Welyhorsky

    Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the

    Jan 1, 2011

  • CIM
    Managing Technical Drilling in the Resource Exploration Program

    By Ben Cottrell

    In this paper technical drilling is referred to as the process of collecting engineering and metallurgical parameters for subsequent mine design considerations. Throughout the development of a mineral

    Aug 1, 2013

  • CIM
    Low Carbon Ironmaking Technology Developments in Europe by Sustainable Hot Metal Production with Top Gas Recycle Blast Furnace and Hisarna

    By Christiaan Zeilstra, Jan van der Stel, Koen Meijer, Gerard Louwerse, Tim Peeters

    The steel industry is producing about 5% of the world wide CO2 emission. Therefore the European steel industry has defined a research program to reduce the CO2 emission by 50% per ton: ULCOS. Since it

    Jan 1, 2015

  • CIM
    Water Powers of Manitoba, 1930

    By C. H. Attwood

    Introduction In presenting this paper on the water-power resources of the Province of Manitoba, it was considered that a brief resume of the power resources of Canada, of the power already develope

    Jan 1, 1930

  • CIM
    Bridging micro- and macro-scale transport in PEM fuel cell modelling

    By N. Djilali

    Many of the transport phenomena encountered in proton exchange membrane fuel cells occur intrinsically at the microscale level. Physically representative models that fully account for the salient phys

    Jan 1, 2005

  • CIM
    Optimization of the Damang Mine

    By Charles Amoah

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    The History of Basic Steel Manufacture at Sydney, Nova Scotia

    By M. R. Campbell

    "IntroductionON THE LAST DAY of December, 1951, a half-century of steel production was completed in the open hearth department of Dominion Iron & Steel, Limited, in Sydney, Nova Scotia.During that per

    Jan 1, 1952

  • CIM
    Drill-to-Mill: Efficient Drilling and Blasting Resulting in Increased Mill Throughput at Barrick Goldstrike

    By Mark Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at th

    May 1, 2003

  • CIM
    Network Convergence for Underground Mines

    By Matthew R. Ward

    This paper aims to describe the reasons and methods to extend enterprise networks into underground mines. Currently mines use a number of communication networks for telephones, PLCs, two-way VHF radio

    Apr 1, 2005