Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design & Development of the Barmac Rotopactor

    By Bryan A. Bartley

    "Jim Macdonald was promoted from Waterworks Engineer to Streetworks Engineer for the Wellington City Council. He thus took over the City quarry and responsibility for its performance. The crushing pla

    Jan 1, 1985

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles

    By L. Bloomquist

    This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t

    Jan 1, 2004

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles (8e8c3b94-ac75-4947-840c-a59d92585998)

    By L. Bloomquist, C. Arnoldi

    "This paper describes how Automated Mining Systems (AMS) is evolving the state-of the- art in guidance systems for autonomous underground vehicles. The techniques, tradeoffs, and lessons learned from

    Jan 1, 2004

  • CIM
    Flotation Circuit Design for Adanac Moly Corp using a Geometallurgical Approach

    By Dave Bulled

    "This paper describes the design of a molybdenite flotation circuit using FLEET technology applied to kinetics data produced from laboratory flotation testing and distributed across the blocks of a mi

    Jan 1, 2007

  • CIM
    Permeabilities of the Athabasca Oil Sands

    By K. A. Clark

    "The repacked mineral aggregates of good grade oil sands have permeabilities ranging between 15 darcys to 350 millidarcys. The variation is due to the silt contents of the aggregates. Few good grade o

    Jan 1, 1960

  • CIM
    Standardization of Data Formats as Basis for Future Efficient Mine Production

    By Christoph Mueller

    Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro

    May 1, 2002

  • CIM
    Ausmelt Technology; Developments in Lead And Zinc Processing

    By R. Matusewicz, A. Kaye

    Ausmelt Top Submerged Lancing (TSL) Technology has gained widespread commercial acceptance in non-ferrous applications, including the processing of lead and zinc primary concentrates and secondary (po

    Jan 1, 2008

  • CIM
    The Coarse Particle Recovery Process (4291cbe3-857c-4d99-bb64-06edaaa4dc85)

    By Gregg S. Hill, Bert J. Huls

    "This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate an

    Jan 1, 2005

  • CIM
    An Exploration Application for Lead Isotope Ratios, Stewart Mining Camp, Northwestern British Columbia

    By Dani J. Alldrick, Alastair J. Sinclair, Colin I. Godwin

    "Abstract - The Stewart mining camp has a long history of precious and base metal mining. The camp is abundantly mineralized, with more than 200 widespread, varied, vein prospects, deposits and orebod

    Jan 1, 1993

  • CIM
    VLF-EM Data Processing

    By D. C. Fraser

    "Geophysical Engineering and Surveys Limited of the Keevil Mining Group have routinely conducted ground surveys with VLF-EM receivers for the past two years. Both Crone's Radem and Ronka's EM16 have b

    Jan 1, 1971

  • CIM
    Microstructure And Mechanical Characterisation of FSW 7075-T6 Lap Joints

    By P. Bacher, L. Dubourg, M. Jahazi, G. Dezaise

    Effect of friction stir welding parameters and natural ageing on weld properties are reported. Using a Taguchi design of experiment, attempt is made to systematically examine the influences of the wel

    Jan 1, 2006

  • CIM
    Modifications of the CCD Circuit at Cameco's Key Lake Uranium Operation

    By Charles "Chick" Rodgers, Anthony Sarion

    "With declining feed grade and increased production targets, it became necessary to upgrade Key Lake's eight stage counter current decantation (CCD) circuit. Following laboratory trials, mill operatio

    Jan 1, 1998

  • CIM
    Aggregate resources in Nova Scotia

    By John H. Fowler

    "Most of the aggregate used in Nova Scotia is produced from numerous glaciofluvial and ice-contact deposits scattered throughout the province. Production from bedrock sources is increasing, with most

    Jan 1, 1982

  • CIM
    Uranium in Canada Project ?? Prospects and Process

    By Charlie Jefferson

    Main Goal: Resource Assessment 1. Incorporate existing data & results, old process. 2. NEW Quantitative Analysis (Chung and Chen) 3. Try mass balance of U and geochemical tracers 4. Use holistic p

    May 1, 2006

  • CIM
    The use of Bauxsol? Technology in Mine Site Management and Remediation

    By D. McConchie

    The use of Bauxsol? (physically and chemically modified alumina refinery residues) to treat acid rock drainage (ARD), and sulphidic waste rock and tailings, provides new options for managing some intr

    May 1, 2003

  • CIM
    Production of Paste from Total Tails in a Deep Cone Thickener A Case Study

    By Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary

    "In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo

    Jan 1, 2001

  • CIM
    Microseismic System Blast Identification Techniques

    By Pavel Vasak

    Microseismic monitoring is becoming standard practice in the Canadian mining industry, particularly as mines get deeper. Full-waveform microseismic systems allow the operator to distinguish the event

    Oct 1, 2010

  • CIM
    SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore Grindability (7d09426f-a588-4545-9380-122077c30324)

    By F. O. Verret, A. McKen, G. Chiasson

    Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the

    Jan 1, 2012

  • CIM
    Experiences on Process Control Computers at the Concentrator of Outokumpu Oy

    By Olli Aulio, Outokumpu Oy

    "GENERALThe Outokumpu Company is today an important European producer of metals from its own mines: copper nickel cobalt, ferro chrome and zinc being the main products. In 1972 about 4 million tons of

    Jan 1, 1973