Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Influence of Intact Rock Strength on Rock Mass Mechanical Properties

    By K. Esmaieli

    The Synthetic Rock Mass (SRM) approach has the potential to capture the mechanical behavior of large rock samples. In order for the method to be used with confidence it is necessary to gain a good und

    Aug 1, 2013

  • CIM
    Commissioning of a Mini REE SX Pilot Plant at SGS Minerals – Lakefield Site

    By Niels Verbaan, Ernesto Bourricaudy, Ronald Molnar, James Brown, Sunil Jayasekera

    "SGS Minerals commissioned an internal R&D program to develop in-house expertise to design, set up and operate REE separation pilot campaigns at its Lakefield, Canada site. A team approach was used th

    Jan 1, 2016

  • CIM
    Geology of the seabee gold deposit, tabbernor lake greenstone belt, saskatchewan

    By P. K. Gummer

    Gold was fir t di covered on the Seabee property in 1947 by the Con olidated Mining and Smelting Company Limited. Acquired by Claude Resource Inc. in 1984, the property is now being explored by Placer

    Jan 1, 1986

  • CIM
    SAG Mill Testing - An Overview of the Test Procedures Available to Characterize Ore Grindability

    By F. O. Verret

    Several grindability tests were developed over the years to design grinding circuits or optimize existing operations. Each test has its own strengths and weaknesses and it is imperative to select the

    Jan 1, 2012

  • CIM
    Phase relations in the Cu2S-FeS-ZnS and Cu2S-PbS-ZnS ternary systems at 1473°K: Extraction of zinc from sulphide ore using liquid copper as a reagent

    By S. Surapunt, C. M. Nyamai, K. Itagaki

    "The use of liquid copper as a medium for zinc extraction has been used in the Warner Process as a method of processing zinc-lead sulphide ore. The recovery of zinc metal is based on the reaction:ZnS(

    Jan 1, 2002

  • CIM
    Torstein Utigard: The Man - The Scientist - COM 2015 - 54th Annual Conference of Metallurgists held in Conjunction with AMCAA - America's Conference on Al Alloys

    By C. Díaz, M. Barati

    Prof. Torstein Utigard's untimely death, in the spring of 2012, put an abrupt end to a meritorious career in the field of high temperature chemical process metallurgy. As an academic in the Depar

    Jan 1, 2015

  • CIM
    Capacity Enhancement at Newmont Mining Corporation’s Twin Creeks Whole Ore Pressure Oxidation Facility

    By T. Krumins, F. C. Ruff, M. Eichhorn, L. Zunti

    Hatch Ltd. has recently completed a project to increase refractory gold ore processing capacity at Newmont Mining Corporation’s Twin Creeks facility. The objective of the project was to increase throu

    Jan 1, 2014

  • CIM
    Hydromechanical versus seismic fatigue in progressive failure of deep-seated landslides

    By O. Hungr, V. Gischig, G. Preisig

    Deep-seated landslides are characterized by slow time-dependent movements induced by constant gravitational creep, and periods of acceleration associated with stress changes within the rock and the pr

    Jan 1, 2015

  • CIM
    The Total Air Addition and Air Profile for a Flotation Bank

    By C. D. Smith

    Numerous studies have shown the potential of air rate profiling to significantly improve the flotation performance of a bank of cells. To date many profiles have been implemented; balanced, increasing

    Jan 1, 2009

  • CIM
    Implementing New Technologies in Metallurgical Processes: Building Plants that Work

    By B. Wasmund, B. Haneman, G. Sheehan

    Success in implementing new technology for metallurgical processes is not a foregone conclusion: This paper includes a survey of 23 new technology-based metallurgical plant start-ups, in which the aut

    Jan 1, 2011

  • CIM
    The Preservative Treatment of Mine Timbers

    By J. F. Harkom

    Introduction The importance of the preservative treatment of mine timbers need scarcely be stressed here. Increasing the life of mine timbers will reduce one of the major costs of mining and also c

    Jan 1, 1930

  • CIM
    A Model for PGE Enrichment Due to the Splitting of Freezing Magma Chambers by Suspended Crystal Loads

    By Alan Rice

    Abstract-The mechanism by which stratiform ore deposits of PGE (platinum-group elements) are laid down in ultramafic igneous complexes is not completely clear. Early studies by the author and coworker

    Jan 1, 1997

  • CIM
    A Model for PGE Enrichment Due to the Splitting of Freezing Magma Chambers by Suspended Crystal Loads

    By Alan Rice

    The mechanism by which stratiform ore deposits of PGE (platinum-group elements) are laid down in ultrama?c igneous complexes is not completely clear. Early studies by the author and coworkers on numer

    Jan 1, 1997

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • CIM
    Petroleum Possibilities? in Mackenzie River Valley, N.W.T .

    By J. S. Stewart

    THE Mackenzie River Valley proper extends from Great Slave lake to the Arctic ocean (see map, Figure 1). From Fort Providence, near Great Slave lake, to Aklavik, near the Arctic coast, the distance

    Jan 1, 1944

  • CIM
    Research and Natural Resources

    By N. H. Grace

    "IntroductionA STRIKING FEATURE of the past twenty years has been the application of organized scientific and industrial research to problems of national defence and security and to the development of

    Jan 1, 1952

  • CIM
    Heating Iron Ore Slurry to Improve Filtering Efficiency Prior to Pelletizing

    By Robert E. Wood

    Engineers have known for some time that the efficiency of filtering iron ore concentrate slurry can be significantly improved by pre-heating the slurry ahead of the filters. However, heating such larg

    May 1, 2010

  • CIM
    Theoretical and Experimental Study on the Flexible Barrier Optimization Against Debris Flow Risk

    By F. Vagnon, A. M. Ferrero, M. Pirulli, A. Segalini

    "The topic of this study is the design of flexible fences to mitigate the risk due to debris flow phenomena by means of theoretical and experimental studies analysed in framework of the Rock Engineeri

    Jan 1, 2015

  • CIM
    The Practical Examination of Mineral Prospects

    By J. A. Reid

    THE views and observations expressed herein on this old but constantly recurring question are our own, no effort having been made to align them with standard texts. Therefore, while they may find gene

    Jan 1, 1945

  • CIM
    Simulators for the Design, Optimization and Control of Gold Ore Processing Plants

    By L. R. P. de Andrade Lima, D. Hodouin

    The paper presents a survey of the possibilities of the simulation techniques for improving the design and operation of gold processing plants. The procedure to construct kinetic models that are used

    Jan 1, 2005