Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design of the New Lihir Gold Pressure Oxidation Autoclave

    By M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt

    Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island

    Jan 1, 2011

  • CIM
    Mining and Milling at Dome, Hollinger, and McIntyre

    By James D. Hall

    THE Dome ore-bodies are more or less isolated and are mined. by shrinkage stoping. An interwoven system of veins is mined at Hollinger '.1.nd requires close filling. Deep mining is the problem at

    Jan 1, 1938

  • CIM
    Removal of Heavy Metals from Tailings Recycle Water at Mattabi Mines Ltd.

    By Jean-Guy L. Gauthier

    "With the Ontario Ministry of the Environment stipulating that the cumulative concentration of copper, lead, zinc and nickel in mine mill effluent must be no greater than 1.0 milligram per litre, it h

    Jan 1, 1980

  • CIM
    A Web-based Approach to Control Loop Assessment in a Mineral Processing Facility

    By Dave Shook

    A Mineral Processing facility in Montreal has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition-based maintenance. This

    May 1, 2002

  • CIM
    Mine Hoists in Canada

    By J. M. Whatley

    "IntroductionFEW COUNTRIES equal Canada in the diversity of its mineral output, the range of size of its mine operations, and the extremes of climatic and topographic conditions under which its mining

    Jan 1, 1955

  • CIM
    Assessment of Properties and Microstructure of X100 Pipeline Girth Welds

    By D. V. Dorling, J. T. Bowker, J. A. Gianetto

    Over the last few years, interest in the development and construction of large diameter, high pressure pipelines from the Mackenzie Delta in northern Canada and Alaska's North Slope has steadily

    Jan 1, 2005

  • CIM
    Achieving business results through IT: Insuring controller performance benefits with web-enabled monitoring at Noranda

    By L. Lariviere, M. Grenier, R. Khalili, D. Shook

    A mineral processing facility near Montreal, CEZinc, Noranda Inc., has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition

    Jan 1, 2003

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Notes on Fire Prevention and Fire Insurance for Mine Buildings

    By W. G. Millar

    Until a fire occurs, insurance and prevention work are often looked on as unavoidable necessities, but as insurance is back of all business credit, it is essential to know that in case of damage money

    Jan 1, 1928

  • CIM
    Retention of Small Grinding Media inside Ball Mills

    By Jocelyn Bouchard, Claude Bazin, Sami Makni, Rolando Quispe

    "Finely disseminated minerals in ores require intensive size reduction to achieve sufficient liberation for the subsequent concentration process. The use of small grinding media in conventional ball m

    Jan 1, 2015

  • CIM
    Design and R&D Progress of China’s Largest Underground Nonferrous Mine—Pulang Copper Mine

    By Zhang Wei

    "Pulang Copper Mine is located in Shangri-La county, Diqing Prefecture, Yunnan Province, with currently defined copper reserve of 4.8 million tonnes of copper metal and an average grade of 0.34% Cu. T

    Jan 1, 2016

  • CIM
    Corrosion Behaviour of A1-B4c Metal Matrix Composites in H3BO3, K25O4 And NaCl Solutions

    By Ham. Y. M.

    The corrosion behaviour of Al-B4C metal matrix composites immersed in 2500 ppm boron-containing H3B03, 0.5 M K2SO4, and 3.5% NaC1 solutions was investigated. Effects of B4C particle volume fraction on

    Jan 1, 2011

  • CIM
    Feasibility Study of the Pellet Feed Production from the Concentrate in the 4th Concentration Plant at Golgohar Mining and Industrial Company

    By Amin Saravari, Jamal Jafari, Abbas Sam

    "The fourth concentrate production plant includes the comminution systems and the medium-low intensity magnetic separators (LIMS). Based on different conditions, two types of materials are fed into th

    Jan 1, 2016

  • CIM
    Engineering Challenges in Mining

    By C. E. White

    The depletion of higher grade mineral reserves will accelerate the trend toward production from progressively larger and lower grade deposits. The discovery of adequate reserves of leaner ores will re

    Jan 1, 1967

  • CIM
    A Study of the Capillary Pressure.-Hydrodynamic Relationship to Soil Accumulation in Stratigraphie Traps

    By Ben Habermann

    "The object of the work described in this paper was to increase the understanding of the relation that capillary pressure of a rock, hydro-dynamics, and accumulation of oil in stratigraphie traps have

    Jan 1, 1960

  • CIM
    Effects of microtexture on the d hydride formation in Zircaloy-4

    By W. Qin

    The nucleation of d hydride in Zircaloy-4 has been studied using electron backscatter diffraction. Hydrides prefer to nucleate at intergranular rather than intragranular sites. (0001) a -Zr//(111) d -

    Aug 1, 2010

  • CIM
    Surveying of Diamond Drill Holes at Sherritt Gordon?s Ruttan Mine

    By D. S. Speakman

    The copper-zinc orebody at Sherritt Gordon's Ruttan Mine occurs in a structurally complex area of the Rusty Lake greenstone belt in northern Manitoba. Problems in interpreting drill results indic

    Jan 1, 1978

  • CIM
    Process Mineralogy of Copper and Lead Concentrates: Uncertainties and Metallurgical Decisions

    By Mostafa Benzaazoua, Emilie Ré, Raphaël Mermillod-Blondin, Hassan Bouzahzah, Jean-François Wilhelmy, University of Québec in Abitibi-Témiscamingue

    "We analyzed two copper and lead flotation concentrates from the LaRonde mill using MLA technology (Mineral Liberation Analyzer) to identify the contaminants and to quantify their size and liberation.

    Jan 1, 2016

  • CIM
    Adra Tunnel: Fire and Rehabilitation

    By Dwayne D. Tannant

    The Adra tunnel near Naramata BC experienced a fire in 2010 that burned timber sets within the tunnel and caused severe spalling of rock from the roof and tunnel walls. The nature of the damage is doc

    Jun 1, 2012