Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)

    By P. G. Roden, G. A. Maki, P. J. Fullmann

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1986

  • CIM
    A Review of Iron Oxide Copper-Gold Deposits, with Focus on the Wernecke Breccias, Yukon, Canada, as an Example of a Non-Magmatic End Member and Implications for IOCG Genesis and Classification

    By D. J. Thorkelson

    New data indicate Wernecke Breccia-associated iron oxide copper-gold (IOCG) deposits likely formed from moderate-temperature, high-salinity, non-magmatic brines. The breccias formed in an area underla

    Jan 1, 2007

  • CIM
    Mineralization and Metallurgy of the Samatosum Project

    By P. J. Gron

    "The Samatosum Project is a base and precious metal deposit located in south central British Columbia. A dilute ore reserve of 766, 682 tonnes grading an average 1.1% copper, 3.0% zinc, 1.4% lead, 833

    Jan 1, 1990

  • CIM
    Lead Flotation from Rod and Ball Mill Discharge at Nanisivik Mines Limited

    By J. Goyman, K. R. Rawling

    "1.1 Location and Transportation ServicesNanisivik Mines Ltd. is located at latitude 73°, 3,200 km north of Montreal and 700 km north of the Arctic circle, on the south side of Strathcona Sound, which

    Jan 1, 1984

  • CIM
    A MultiGaussian Approach to Assess Block Grade Uncertainty

    By Julián M. Ortiz

    Uncertainty quantification of a spatially distributed variable at any scale can be handled through geostatistical simulation. Large computation time, storage, and post-processing of the realizations a

    May 1, 2004

  • CIM
    Bioleaching of Copper Sulphides in the Presence of Fluoride-Containing Gangue Minerals

    By V. A. Leão, M. L. M. Rodrigues, L. C. Sicupira, I. C. B. Rodrigues, T. C. Veloso

    Brazilian sulphide ores can contain a significant content of chloride and fluoride, which are harmful to bacteria and thus bioleaching. This work summarizes a four-year research investigation on the e

    Jan 1, 2014

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    Survey of Heavy Minerals in the Surface-Mineable Area of the Athabasca Oil Sand Deposit

    By J. W. Kramers, R. A. S. Brown

    "Samples from seven test wells distributed throughout the surface-mineable area of the Athabasca Oil Sands have been evaluated to determine the amounts of heavy minerals present and the titanium and z

    Jan 1, 1976

  • CIM
    Fast Track Reactivation -Jacobina Mine

    Mine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi

    May 1, 2006

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987

  • CIM
    Environmental Stewardship ? How do you balance impact with mitigation?

    By Carol E. Jones

    Outline ? Reclamation is a primary mitigation. ? Understand baseline environment and land use. ? Determine reclamation goals. ? Selecting reclamation technology. ? Determine technical risk. Rec

    May 1, 2008

  • CIM
    The Relations between Assarel-Medet JSC, Bulgaria, and the Municipality ?f Panagyurishte - A successful model for sustainable and socially responsible partnership

    By Lachezar Tsotsorkov

    Corporate social responsibility Is a principal trend of the corporate strategy for sustainable development of Assarel-Medet JSC ? the largest Bulgarian company for open pit mining and ore processing

    Aug 1, 2013

  • CIM
    La Ville de Fermont

    By Paul J. Bourassa

    Alin de pourvoir aux besoins d'hébergement des quel¬ques 1600 employes qui travailleront dans toutes les spheres opérationnelles de l'exploitation du gisement du Mont-Wright, ainsi que de le

    Jan 1, 1977

  • CIM
    Elements de Reflexion sur le Comportement Mecanique des Zones de Faille Dans un Modele 3D dem pour la Stimulation Hydraulique des Puits dans les Reservoirs Geothermiques

    By Arnold Blaisonneau, Théophile Guillon, Xavier Rachez, Sylvie Gentier

    "L’étude présentée ici vise à étudier l’influence, lors de stimulation hydraulique de puits dans les réservoirs géothermiques de type Enhanced Geothermal System (EGS), du comportement mécanique des zo

    Jan 1, 2015

  • CIM
    Treatment of a Gold Refractory Concentrate with Halogens

    By D. Lemieux

    A gold bearing pyrite concentrate was treated at the pilot scale for the extraction of gold. Mineralogical analysis of the concentrate identified gold to be mainly present in the form of a solid solut

    Aug 1, 2013

  • CIM
    Re-Thinking Underground Hard Rock Mining

    By Alex Henderson

    The underground hard rock mining industry has had little change since the mobile equipment era began in the 1970s. Equipment has become larger and faster but has not kept pace with the following chall

    May 1, 2011

  • CIM
    Increased Productivity by Condition-Based Maintenance Using Wireless Strain Measurement System

    By Chris V. Sellathamby

    Condition-based maintenance is replacing preventive maintenance in many industrial operations as a result of gains in productivity. Preventive maintenance is strictly time-based which means that as lo

    Oct 1, 2010

  • CIM
    Coal Research and Development in Canada - 1970

    "An unparalleled growth in the Canadian coal industry in 1970 coincided with increasing awareness by Canadians of their environment and their geography with its accompanying transportation factors. R

    Jan 1, 1971

  • CIM
    Improving Mineral Project Performance

    By Frederick Biery

    Outline ? Project Challenges ? Results from 100 recent projects ? What factors are driving the best and worst projects ? A look at recent mining projects ? Conclusions

    May 1, 2009