Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Metso MP1250 Cone Crusher – Two Case Studies (f0f34b8b-9322-405b-9121-e0158cd99f3c)

    By S. Koski, M. Schmalzel, D. A. Jacobson, S. Crosby, P. Cook, M. Mular

    "Mining operations, whether new or existing, are constantly looking for ways to maximize production and improve energy efficiency, while keeping the footprint required to a minimum. The Nordberg MP125

    Jan 1, 2012

  • CIM
    Establishing Total Airflow Requirements for Underground Metal/Nonmetal Mines with Tier IV Diesel Equipment

    By J. D. Stinnette

    Traditionally, airflow requirements for diesel equipment operating in underground environments such as mines and tunnels were determined by multiplying the vehicle power by a ventilation rate that was

    Aug 1, 2013

  • CIM
    Sustainable use of Geotechnical Data for Improved Mine Planning and Design Through Multi-Parametric Modeling

    By Andrew D. Lapworth

    The use of geological and grade models has been standard practice in mine design for many years now, with a wide range of software available to create and analyze the models. Although geotechnical par

    May 1, 2007

  • CIM
    Roasting, Fluidized-Bed Separation, And Hydrometallurgical Treatment of Waste Tantalum Capacitor to Recover Purified Tantalum

    By H. Tokuichi, H. Ohta, K. Sato

    A physical separation technique of tantalum capacitors from waste print circuit boards is in a development phase in Japan. A tantalum capacitor consists of an exterior coating of resin (epoxy resin) m

    Jan 1, 2014

  • CIM
    Comparison of surface and underground disposal of tailings waste

    By D. Bois, F. P. Hassani, M. Hossein

    "A growing environmental awareness hos prompted the mineral industry to seek innovations in waste management and technology. It is estimated that over 500 million metric tonnes of solid waste each yea

    Jan 1, 1994

  • CIM
    The Benefits of Autogenous Grinding Milling When Processing the Fort A La Corne Kimberlites

    By J. E. Danoczi

    Shore Gold Inc. (Shore) is presently designing a diamond processing plant for the Star and the Orion South kimberlite deposits in the Fort à la Corne area kimberlite field in central Saskatchewan. The

    Nov 1, 2011

  • CIM
    The Cigar Lake Mining Test

    By Barry W. Schmitke, J. M. Marino

    "Cigar Lake Mining Corporation is presently operating an underground test mine in northern Saskatchewan, with a view to developing a high grade uranium deposit. The mining test is intended to demonstr

    Jan 1, 1992

  • CIM
    Impurity Effects on the Synthesis of Crystalline Scorodite

    By M. Abumiya, N. Onodera

    "The synthesis of large scorodite particles in non-ferrous metallurgical industries usually requires a high-cost operation involving heating and high-pressure autoclaving. To overcome these obstacles,

    Jan 1, 2012

  • CIM
    Fabrication of Porous Copper and Porous Copper Based Alloys with Controllable Pore Structure

    By Y. X. Li, L. R. Xiao, S. Gong, S. S. He

    Porous copper and porous copper based alloys with controllable pore structure have been manufactured successfully by sintering evaporation process. This process consisted of mixing copper or copper ba

    Jan 1, 2019

  • CIM
    Mining Methods at Copper Mountain

    By Walter I. Nelson

    THE geology of the Copper Mountain mine has been ably described by Dr. Victor Dolmage in Memoir 171 of the Geological Survey. Reference is invited to that paper for a more extended description of the

    Jan 1, 1941

  • CIM
    Increasing Capacity of Nickel Product at Niihama Nickel Refinery

    By H. Sato, Y. Sato, T. Ooishi, K. Sakamoto

    "Sumitomo Metal Mining Co., Ltd.(SMM)'s Niihama Nickel Refinery(NNR) produces high quality Nickel cathode, Cobaltcathode and other by-products using hydrometallurgical refining process called “MCLE”(M

    Jan 1, 2017

  • CIM
    Impurities of Secondary Zinc Oxides as Limiting Factors for the Primary Industry

    By C. Pichler, C. Benigni, J. Antrekowitsch

    "The recycling of steel mill dust results in zinc oxides which are sold to the primary industry in or-der to recover zinc in its metallic form. Due to the contained impurities - chlorine and fluorine

    Jan 1, 2017

  • CIM
    Geometallurgical and Mineralogical Characterization of Gold Ores

    By J. Zhou1

    "The extractive metallurgy of gold ores is largely driven by their grade and mineralogy. The concentration of gold in the crust is extremely low and highly variable, resulting ore variability in many

    Jan 1, 2017

  • CIM
    Laboratory Scale Extraction of Bismuth and Antimony from a Copper Electrorefining Electrolyte Using a Proprietary Phosphonic Acid Ester Extractant

    By Andrew Artzer, Michael Moats, Jack Bender

    Antimony and bismuth in copper electrorefining electrolytes can cause cathode contamination, leading to the careful control of their concentrations. This study examined the laboratory scale removal of

    Jan 1, 2019

  • CIM
    Effect of Ore Type and Operating Variables on High Rate Thickener Performance at Tata Steel

    By Vishal Shukla, Prateek Singh, D. P. Chakraborty

    "Continuous thickening by an operation called sedimentation is the separation of suspended solid particles from a liquid stream by gravity settling. The primary purpose of thickening is to increase th

    Jan 1, 2016

  • CIM
    Chalcopyrite: Bioleaching versus Pressure Hydrometallurgy

    By F. Habashi

    "While bioleaching of pyrite concentrates has been successfully used in industry to liberate gold from the sulphide matrix for subsequent cyanidation, the same technology cannot be recommended for lea

    Jan 1, 2012

  • CIM
    The Brewery Creek Heap Leach Project.

    By Brad Thrall

    "Viceroy Resource Corporation of Vancouver, B.C. has recently developed the Brewery Creek Mine, an open pit heap leach gold mine 55km East of Dawson City in Yukon, Canada. Mineable reserves are 17.1 m

    Jan 1, 1997

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • CIM
    UNFC (Multi-Jurisdiction) Draft 2009 - United Nations Framework Classification (UNFC) for Fossil Energy and Mineral Reserves and Resources Draft (20 March 2009)

    "The United Nations, through the secretariat of the United Nations Economic Commission for Europe (UNECE) and its Ad Hoc Group of Experts on Harmonization of Fossil Energy and Mineral Resources Termin

    Jan 1, 2003

  • CIM
    Arsine Poisoning at Bralorne Pioneer Mines Ltd.

    By E. H. Hall

    "Perhaps .I should start this talk on Arsine poisoning, by giving a brief background and history of the Bralorne Mill.The present Bralorne company started milling operations in 1932, with amalgamation

    Jan 1, 1964