Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Effect of Biological Gas Generation on Oil Sand Fine Tailings

    By C. Guo

    The Mildred Lake Settling Basin (MLSB) is the largest disposal site for mature fine tailings (MFT) at the Syncrude Canada Ltd oil sands plant. Over the past years (since 1997), there has been a marked

    Apr 1, 2005

  • CIM
    FreedomCAR and Casting

    By J. A. Jr. Carpenter

    Expanding world economic prosperity, probable peaking of conventional petroleum production in the coming decades and environmental concerns require efforts to increase the efficiency of, and the devel

    Jan 1, 2006

  • CIM
    Influence of Rock Mass Anisotropy on Tunnel Stability

    Stress induced, gravity-assisted failure processes typically dominate long before stress levels approach the strength of the intact rock (at approximately smax > 0.4UCS where smax = 3s1 ? s3 and UCS i

    May 1, 2009

  • CIM
    The Milling Operation at McArthur River

    "The McArthur River uranium deposit is the single richest uranium ore body developed in the world to date. The ore body’s average grade is 15% U3O8. Proven reserves are in excess of 450 million pounds

    Jan 1, 2001

  • CIM
    CIP - Who Needs It? A combination circuit of Gravity, Flotation and Intensive Leach may provide the Optimal Environmental and Cost Outcome for Gold Plants.

    By Garry Johansen, Andrew McCallum, Sandy Gray, Gary Patrick, Jennifer Abols

    "The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold pro

    Jan 1, 2003

  • CIM
    Marked Ball Wear Testing

    By G. D. West, J. D. Purdue

    "Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea

    Jan 1, 1991

  • CIM
    Integrated Underground Mining and Processing Of Massive Sulphide Ores

    By Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber

    "It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min

    Jan 1, 2006

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    Was that Locked Cycle Test Any Good?

    By Mike Ounpuu

    "Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo

    Jan 1, 2001

  • CIM
    Start-Up and Early Optimization of the New Afton Concentrator

    By C. O’Hara, S. Roy, K. Swedburg, J. Katchen

    "New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve

    Jan 1, 2015

  • CIM
    Milling at Agnico-Eagle Gold Mines Limited

    By K. Mikulash

    "Agnico-Eagle Mines Limited is located at Joutel in North-Western Québec. The mine is about four miles north-west from the town on the left bank of the Harricana River. The present mining is 1,800 fee

    Jan 1, 1976

  • CIM
    Environment and the public

    By Desmond M. Connor

    "The State of the EnvironmentRecent data from a State of the Environment report prepared in January 1991 and released in April (see references) , indicates that the physical and biological environment

    Jan 1, 1991

  • CIM
    Donkin-Morien development project

    By J. J. Gillman

    "The coal deposits from Cape Perce on Cape Breton Island have been known to supply the coal requirements of the people living in or visiting the area for close to 300 years.A major block of coal has b

    Jan 1, 1982

  • CIM
    Improved Concentrate Grade and Recovery through the Application of the 6 Sigma Methodology at Noranda Matagami Mill

    By Martin Plante, Denis Hamel, Marie-Pier Bédard, Jeff McLaughlin

    "The results and methodology for the optimisation of the zinc flotation circuit at the Matagami Mill using the 6-Sigma methodology are shown in detail while only the base line and final results are pr

    Jan 1, 2001

  • CIM
    Earth Moving Equipment Safety Round Table - The EMESRT Story (2006-2008)

    Mining companies around the globe have long struggled with the need to ensure that earth moving equipment is designed to be operated and maintained under all site conditions without causing harm to pe

    May 1, 2009

  • CIM
    New tax rules for northern allowances

    By Robert B. Parsons

    "Starting January 1, 1987 employers, employees, and other taxpayers are confronted with a new set of rules dealing with the taxation of travel and housing benefits relating to isolated posts in Canada

    Jan 1, 1987

  • CIM
    Application of computer-based core logging to the Sustut copper deposit, north-central British Columbia

    By D. H. Wilton, C. I. Godwin, A. J. Sinclair

    "A computer-based drill core logging system used to examine computer-based drill core logging system used to examine copper mineralization hosted in volcaniclastic rocks at the Sustut deposit, in nort

    Jan 1, 1980

  • CIM
    Fording Coal Limited silo explosion

    By D. A. Stokes

    "In October of 1980, Fording's 15 000-ton capacity clean coal silo was put into operation. The silo was unique in that it was designed to allow the mass flow of material, coupled with a sophistic

    Jan 1, 1986

  • CIM
    Maintaining shaft access and services during headframe replacement

    By R. B. Smith, D. C. Brady

    "A review of the major renovation of the fifty-year old C-I headframe facilities at NERCQ's Con Mine, Yellowknife, N. W.T. is provided. The project was complete with only two 3-day shutdowns of t

    Jan 1, 1991