Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analysis of the failure of a large hangingwall wedge: Kidd Mining Division, Falconbridge, Ltd.By M. Board, R. Pakalnis, S. Seldon, R. Brummer
The Kidd operation mines roughly 10 000 tpd of copper and zinc ore from underground and employs about 700 personnel. In the late summer and fall of 1997, major movements in the proximity of the east w
Jan 1, 2000
-
Massive Sulphide Deposits in New BrunswickBy A. L. McAllister
"MASSIVE sulphide deposits are found in two areas of New Brunswick, the St. Stephen area and the Bathurst-Newcastle area. In both, the geology in the immediate vicinity of the sulphide bodies is large
Jan 1, 1960
-
Mine Rescue Work in the Sudbury DistrictBy T. J. Fee
Introduction The International Nickel Company have been pioneers in mine rescue work in Ontario. Following the fire in the Hollinger mine in the spring of 1928, the Company purchased ten self-contain
Jan 1, 1935
-
Algoma Uranium DistrictBy Franc R. Joubin, Donald H. James
"The Algoma (or Blind River) uranium district is centred in an area of some 600 square miles on the north shore of Lake Huron, about half way between Sudbury and Sault Ste. Marie, Ontario (Figure 1).
Jan 1, 1949
-
Industrial Minerals and Rocks in British ColumbiaBy J. M. Cummings
CONSIPERABLE information on the industrial or non-metallic mineral resources of British Columbia has been published. For a general resume of the subject, reference may be made to a paper presented by
Jan 1, 1938
-
Maintenance management: IOC’s “Vision 2000” maintenance integration visionBy Grant J. Goddard
"The Iron Ore Company of Canada (IOC) has been in operation for over 30 years. Today, and in the future, technology and its application will play an ever more critical role in the company’s business s
Jan 1, 1996
-
Development of the Heavy Minerals Potential of the Athabasca Tar SandsBy Lloyd W. Trevoy
Titanium and zirconium heavy minerals occur in the tailings streams from processing plants which use the hot-water extraction process for recovery of bitumen from tar sand. In a research program cond
Jan 1, 1978
-
Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the FutureBy Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi
At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con
Jan 1, 2019
-
Improvements in use of Satellite Images for Monitoring Changes in Hydro-Environmental ConditionsBy Michael J. Rosko
Methods have been developed for processing and analyzing reflected solar radiation data obtained by Landsat 5 Thematic Mapper multispectral scanner. Spatial resolution for the Landsat series satellite
Oct 1, 2009
-
Improving Indoor Security Surveillance by Fusing Data from BIM, UWB and VideoBy M. Rafiee
Indoor physical security, as a perpetual and multi-layered phenomenon, is a timeintensive and labor-consuming task. Various technologies have been leveraged to develop automatic access control, intrus
Aug 1, 2013
-
Plant Expansions and CIL Optimization at Iamgold's Rosebel Operation in SurinameBy J. Grignon, C. Fleming
It is possible to reproduce the performance of an operating CIP or CIL plant in the laboratory, in small scale batch kinetic tests, coupled with mathematical models that translate kinetic data into pr
Jan 1, 2011
-
Gold Passivation: Some Fundamental Issues to HighlightBy A. Azizi, P. Blatter, A. Bouajila
"Due to the high reactivity of sulfide minerals in alkaline cyanide solutions, some parasitic reactions inflict a heavy gold surface passivation and excess cyanide consumption resulting in a dramatic
Jan 1, 2012
-
Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance TechniquesBy S. Makni, A. Faucher, F. Robichaud, A. Bouajila
"Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge
Jan 1, 2012
-
An Overview of Optimizing Strategies for Flotation BanksBy M. Maldonado, J. A. Finch
"A flotation bank consists of a serial arrangement of cells. How to optimally operate a bank remains a challenge. This article reviews three strategies for optimizing bank performance: air profiling,
Jan 1, 2012
-
Uranium Compounds as Thermoelectric MaterialsThe properties required for a com-pound to form useful thermoelectric materials are described. Uranium compounds which might have these properties are reviewed. Several of these compounds have been pr
Jan 1, 1963
-
Mine Ventilation Design using a Ventilation Improvement IndexBy Dong-kil Lee
A ventilation improvement index (VII) was developed in an effort to propose an optimal ventilation improvement measure for a designated mine. The index was designed to incorporate both ventilation eff
Aug 1, 2013
-
A Discontinuum Numerical Modelling Investigation of Failure Mechanisms at the Mitchell Creek Landslide, B.C., Canada.By M. A. Clayton, D. Kinakin
The Mitchell Creek Landslide is a large, structurally controlled, complex bedrock instability located in northwestern British Columbia. Characterization of the landslide using aerial photograph, explo
Jan 1, 2015
-
Automated Reconstruction of 3D as-Built Building Information Model for Building Energy Performance AssessmentBy C. Kim
The integration of three-dimensional (3D) data with infrared thermography has received much attention for its potential use as input data for building energy simulations. Therefore, researchers have p
Aug 1, 2013
-
Mining engineering education in developing countries: The case of IranBy H. Memarian
In the last few decades, many developing countries have tried to expand and improve upon higher education, which is acknowledged to be the leading factor for development. In this respect, develiping c
Jan 1, 2007
-
From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona MillBy Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux
"The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur
Jan 1, 2013