Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mineral Liberation Analysis of Brunswick CuPb Rougher Flotation Streams

    By William Petruk, Donald Leroux, Michael Cooper

    "Brunswick's primary flotation circuit (CuPb) produces a low grade concentrate containing considerable amounts of undesirable sphalerite and pyrite. To determine the cause of the poor selectivity, a s

    Jan 1, 1996

  • CIM
    Recycling of Metal-Coated Plastic-Parts from End-Of-Life-Vehicles with Biotechnological Methods

    By F. Logsch, H. Pempel, J. Markowski, P. Ay

    "Due to the European Directive 2000/53/EC on end-of-life-vehicles, from 2015 on more than 95% of car materials have to be recycled. In order to recycle the materials back into the economic cycle, it i

    Jan 1, 2016

  • CIM
    Study on the Characteristic of Stress and Deformation of Shallow Buried Tunnel under the Foundation of Bridge

    By Xu Feng, Han Shufeng, Zhu Bin, Wang Mingming

    Due to urban subway tunnels mostly built in the cities with highly density buildings, the geological and construction conditions is complex, especially certain sections of the subway tunnel will pass

    Jan 1, 2015

  • CIM
    Particle-Based Simulation to Investigate Comminution of E-Waste for Effective Recycling Process

    By Yuki Tsunazawa, Shuji Owada, Sho Fukui, Chiharu Tokoro

    "Since the amount of e-waste has been rapidly increasing all over the world, there is a desire to develop the effective recycling process. E-waste has various kinds of electronic components with valua

    Jan 1, 2016

  • CIM
    Struggle for competitiveness: An industry perspective for the nineties

    By H. Bannach

    "This paper focusses on what seem to be the leading indicators of prosperity in the minerals industry during this decade: the geographical distribution of deposits, environmental impact, capital alloc

    Jan 1, 1992

  • CIM
    Valuation of mineral properties which do not contain exploitable reserves

    By Lionel C. Kilburn

    "This geological engineering method is based on jour main characteristics of mineral properties, viz; location: inclusion of valuable mineralization; inclusion of geophysical and/or geochemical target

    Jan 1, 1990

  • CIM
    Underground crusher and conveyor system at Ruttan Mine, Sherritt Gordon Mines Ltd.

    By S. K. Paul

    "This paper briefly describes the underground crushing and conveying system at Sherritt Gordon Mines' Ruttan Mine. A series of three steel-cord belted conveyors, with a total length of 2J55 metre

    Jan 1, 1980

  • CIM
    South African hoisting systems with emphasis on Blair multi-rope hoists

    By A. M. Girodo

    "Dorbyl Heavy Engineering has been manufacturing winders since 1949 mostly for the South African mining industry.Table 1 shows that the vast majority of winders have been double drum winders. At the g

    Jan 1, 1995

  • CIM
    Heavy water-the CANDU moderator

    By R. J. Twigg, S. D. Chang

    "The production of heavy water, the moderator in a CANDU reactor, is examined following a flow sheet of a typical Canadian plant. The process involves the extraction and concentration of deuterium fro

    Jan 1, 1983

  • CIM
    The Bullmoose Mille Project

    By R. Drozd

    "The Bullmoose Mine is currently under construction in the North East Coal area of British Columbia, and approximately $300 million will be spent to bring this 2.3 million-tonnes-per-year metallurgica

    Jan 1, 1983

  • CIM
    Coal cleaning by counter-current fluidized cascade

    By J. M. Beeckmans, S. G. Butcher, M. Goransson

    "The counter-current fluidized cascade is a novel and potentially efficient pneumatic gravity separation device. Data are presented on over 150 runs of cleaning Alberta thermal coals, covering several

    Jan 1, 1982

  • CIM
    A Texture-Based Model of Mineral Liberation

    By R. Mariano

    "The ability to optimise a concentrator from mill feed to final products requires a process simulator that integrates comminution, classification and separation stages. A key part of any such integrat

    Jan 1, 2016

  • CIM
    Canadian silica resources: a study of the processing of selected Quebec silica samples for glass and foundry sand

    By P. R. A. Andrews, R. K. Collings

    "In cooperation with le Ministère de l'Énergie et des ressources, Québec, le Centre de Recherches minérales, Sainte-Foy, Québec, and various silica producers, selected deposits of Quebec silica w

    Jan 1, 1987

  • CIM
    The geologic setting of the Aldermac copper deposit, Noranda, Quebec

    By A. D. Hunter, J. M. JR. Moore

    "The Aldermac deposit and associated prospects occur in the Noranda Archean volcanic centre of the Abitibi greenstone belt. Over two million tons of are grading 1.65% copper, with minor gold and silve

    Jan 1, 1983

  • CIM
    Geostatistics and ore reserve classification

    By Roland Froidevaux

    "The main object of ore reserve classification is to assess the reliability of an ore reserve estimate. Because traditional classification schemes fail to provide a means of calculating this reliabili

    Jan 1, 1982

  • CIM
    OsEIP: The Oil Sands – Equipment Interactions Program

    By T. G. Joseph

    "The Oil sands-Equipment Interactions Program (OsEIP) is a collaborative research venture between Syncrude Canada Ltd., James Progithin International Ltd. (JPi), the University of Alberta, P&H MinePro

    Jan 1, 2002

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama

    In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under

    Jan 1, 2019

  • CIM
    Strength and Grade Relationships For a Copper-Zinc Sulphide Ore

    By J. E. Udd

    A core sample for this study was taken from the sulphide ore of the Geco Mine. The subsequent research was based on the assumption that a part of the scattering of strength-grade data could be correla

    Jan 1, 1977

  • CIM
    Effects of Desulphurization Dry Additives on the Design of Coal-Fired Boiler Particulate Emission Control Systems

    By A. B. Walker

    The effects of the injection of dry limestone additives into boilers for the sorption of sulphur dioxide have been studied in pilot and full-scale systems. The effects of such injections on boiler mas

    Jan 1, 1971