Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • CIM
    New technology for hoist conveyance monitoring and analysis (ce4cfab2-0d27-4d96-82b0-9facfbf66b01)

    By M. J. Beus

    Many mines in Canada, the United States and South Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due to the excessive weight. It has been sugg

    Jan 1, 2002

  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • CIM
    The application of digital video plotter (DVP) systems to the location and orientation of open pit wall slope features

    By S. Klingmann, G. Blackwell

    "Terrestrial photogrammetry has been used for many years to build three-dimensional pictures for analytical purposes. Photographs can include images from open pit mine walls, ground topography, mine b

    Jan 1, 2003

  • CIM
    Experimental investigation of molten aluminium penetration into ceramic powders

    By R. Pelletier, Herny. E., C. Allaire

    Corrosion of refractory linings by molten metals is controlled by interactions between penetration and chemical reaction. Corrosion of aluminosilicates by molten aluminium is no exception. The early s

    Jan 1, 2004

  • CIM
    Achieving Project Quality Enhances Life Cycle Performance Of Industrial Projects

    By Brent Robertson

    Failure to meet quality objectives during the execution of any industrial project has lasting negative impacts on facility life cycle performance. Cost overruns, schedule delays, and rework are charac

    Nov 1, 2011

  • CIM
    Effect of Diesel Oxidation Catalysts on Nitrogen Dioxide Production from Diesel Mining Equipment

    By C. Allen, M. Gangal, J. Stachulak

    "Most underground diesel equipment is equipped with diesel oxidization catalysts (DOCs) to reduce carbon monoxide and hydrocarbon emissions. DOCs do not alter nitrogen oxides concentrations but can pr

    Jan 1, 2016

  • CIM
    COLOMBIA - Colombian Emerald Reserves Inferred from Leached Beryllium of their Host Black Shale

    By Gaston Giuliani, Jérome Massot, Didier Bourlès, Lionel Siame

    "Abstract - We present a new approach for the evaluation of the potential of emerald reserves in gem projects using beryllium (Be) mobility. The distribution of Be in the different phases of hydrother

    Jan 1, 1999

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test

    By S. Koppalkar

    ABSTRACT: The development and evolution of the gravity recoverable gold (GRG) test procedure at McGill University is reviewed in this paper. Since the late 1980s, the research group led by the late Pr

    Jan 1, 2010

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test (e99ef368-b956-4514-b763-0f43ee32fd51)

    By S. Koppalkar

    ABSTRACT: The development and evolution of the gravity recoverable gold (GrG) test procedure at McGill university is reviewed in this paper. Since the late 1980s, the research group led by the late Pr

    Jan 1, 2010

  • CIM
    Coupling Dynamic Data Reconciliation with Model Predictive Control for Real-Time Optimization of a Flotation Plant Simulator

    By A. Vasebi, É. Poulin, A. Desbiens, D. Hodouin

    Maximizing benefits generated by separation plants in the mineral processing industry is of prime importance. To achieve this goal, observers and controllers are both key tools playing a crucial role

    Jan 1, 2016

  • CIM
    Sag Mill Dynamics and Diagnostics: Case Studies Using Novel Noncontact Acoustic Measurement

    By Randolph A. Pax, Brian Cornish

    The operation of grinding mills in an ore processing circuit is supported by monitoring the input and output variables. These can include the feed ore size distributions, ore feed and water addition r

    Jan 1, 2016

  • CIM
    Application of a dynamic material balance program to an industrial flotation circuit

    By A. R. Trusiak, C. Bazin, D. Hodouin

    "The On-Stream Analyzer has proven, and is still proving to be, an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilizatio

    Jan 1, 1995

  • CIM
    Les Mines Selbaie Semi-Autogenous Grinding Circuit Expert System

    By M. Hall

    "SomarioEl circuito de molienda a Selbaie consta de molino semiaut6geno en un circuito cerrado y molino de balas en un circuito cerrado. El amperaje del motor de se usa controlar el tonelaje el molino

    Jan 1, 1994

  • CIM
    Grinding Circuit Control Optimization at Mine Doyon

    By Pierre Beaudoin, Michel Bourassa, Robert Lanthier, Samir Chéfaï

    "Mine Doyon, in collaboration with CRM's Process Control Division, improved the control strategy at the SAG mill I Ball mill grinding circuit. The project aimed at increasing operation stability and t

    Jan 1, 1995

  • CIM
    Rare Earth Element Impacts on Biological Wastewater Treatment

    By S. Fox, Y. Fujita

    Increasing demand for rare earth elements (REE) is expected to lead to new development and expansion in industries processing and or recycling REE. For some industrial operators, sending aqueous waste

    Jan 1, 2016

  • CIM
    The wear of materials sliding against road surfaces

    By M. Fiset, D. Belley

    "To better understand the wear process of various materials that may be used as blades on snow removal equipment, the first step is to evaluate the influence of the load applied and the moving speed o

    Jan 1, 1990

  • CIM
    Les Mines Selbaie Story Underground mining

    By Yve Fourmanoit

    "This paper discusses the exploitation of shallow underground deposits in a very altered geological environment. The methods, their adaptation to local conditions, their evolution, dilution control an

    Jan 1, 1990

  • CIM
    Back to basics: the feasibility study

    By C. R. Lattanzi, M. J. Davie, L. D. Smith, J. R. Goode

    "The feasibility study determines the technical and economic viability of a project at the level of accuracy required by the owner to make an investment decision. The economic analysis usually include

    Jan 1, 1991

  • CIM
    New Insights into the Wernecke Breccia iron oxide-copper-gold (±uranium) district, Yukon

    By Julie Hunt

    Rimfire Minerals Corporation: early stage precious metal exploration specialists with discovery opportunities in partnership with major and mid-tier gold producers or prominent junior exploration firm

    May 1, 2006