Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Climate Change and Canadian Mining: Opportunities for Adaptation

    By Jason Prno

    Context ? Climate change an issue of global significance ? Research is lacking ? Study initiated by the David Suzuki Foundation, led by ArcticNorth Consulting Industry Surveying ? 34% and 48% of

    May 1, 2010

  • CIM
    High-Temperature Heat Pumps for Industry

    By Ron Ferris

    The Westinghouse Temptifier TM, using heat pump principles, recovers lowgrade waste heat in the 600P to 1600P temperature range and amplifies it to usable levels of up to 2200P. Coefficients of perfor

    Jan 1, 1979

  • CIM
    Mine planning and design integration

    By Earl Gebhardt

    The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain in

    Feb 1, 1993

  • CIM
    Flash Furnace Feed System Developments

    By M. Coleman, M. E. Reed

    The control of feed delivery quality to the flash furnace remains an unsolved problem. Many operations around the world still have limited control of feed quality to their flash furnace. Schenck Proce

    Jan 1, 2019

  • CIM
    The Jinia Copper Smelter

    By D. C. Treilhard

    After a brief history of the mining and smelting operations of Kilembe Mines Limited, this paper outlines the smelter layout and describes . the. daily operations at the Jinja plant. Particular attent

    Jan 1, 1966

  • CIM
    Underground Mining at Alwinsal Potash

    By A. H. Duffield

    "Forming part of the Prairie Evaporites, the sylvinite layer mined at Alwinsal underlies the Blairmore quicksands and the water-bearing Devonian formations. Production is achieved by a method of track

    Jan 1, 1972

  • CIM
    A Study of a Gas Jet Impinging on a Liquid Surface

    By Gordon A. Irons, H. Y. Hwang

    An impinging gas jet on a water surface was studied to understand momentum transfer in oxygen steelmaking. Depth, width and oscillation frequency of the jet cavity were measured and the splashes inter

    Jan 1, 2004

  • CIM
    Winter Operation of Heavy Equipment ... Pine Point Mines limited

    By J. M. B. Scarborough

    This paper deals with measures taken to maintain effective operation of heavy-duty equipment in open-pit mining. at Pine Point, N.W.T., during periods of extreme cold weather. The points covered inclu

    Jan 1, 1966

  • CIM
    Leaching and Recovery of Copper during the Cyanidation of Copper Containing Gold Ores

    In the leaching and recovery of gold from copper containing gold ores using cyanidation, some copper minerals also dissolve which can have a detrimental effect on the process efficiency and economics.

    Jan 1, 2005

  • CIM
    Mining and Milling at Dome, Hollinger, and McIntyre

    By James D. Hall

    THE Dome ore-bodies are more or less isolated and are mined. by shrinkage stoping. An interwoven system of veins is mined at Hollinger '.1.nd requires close filling. Deep mining is the problem at

    Jan 1, 1938

  • CIM
    Tantalum, Niobium, and Titanium Coating for Biocompatibility Improvement of Stainless Steel Dental Implant

    By M. H. Fathi

    The aim of this work was to prepare the metallic coatings on 316L stainless steel dental implant and evaluate the corrosion characteristics and thus the biocompatibility of the uncoated and metallic c

    Jan 1, 2007

  • CIM
    Cabot Corp. - Tantalum Mining Corporation of Canada Ltd.

    By William Ferguson, Claude Deveau, Wade Hazel, Stephen R. Young, Allen Lussier, Robert Copeland

    "LocationSometimes known as the Bernie Lake mine, the mine is located about 180 km east-northeast of Winnipeg on the northwestern shore of Bernie Lake, close to the Nopiming Provincial Park and the Ma

    Jan 1, 2000

  • CIM
    Nickel - Boron Plating on AZ31 Magnesium Alloy

    By X. Shi

    Magnesium, the lightest structural metal, has not yet been considered as a serious contestant for automotive use due to its weaknesses in corrosion. Electroless nickel-boron alloys are well known for

    Jan 1, 2006

  • CIM
    Building stakeholder trust through a credible ESG strategy and implementation plan

    By Morgan Schauerte, Laura Raimondi, Mariel Palomeque

    Executives in the mining industry are facing dramatically changing market expectations on reporting and transparency regarding the environmental and social impacts of projects, supply chains and produ

    Jan 1, 2023

  • CIM
    Onsite Data Acquisition Using Low Cost Open Source Microcontroller

    By Magdy Ibrahim

    This paper presents experimental design and development of a low-cost remote sensing hardware designed to support automated site data acquisition for near real-time progress reporting of construction

    Aug 1, 2013

  • CIM
    Development of a Total Station with a Concentric Circle Reticle and a Navigation System for Pile Driving

    By Kazuhide Nakaniwa

    In this research, we devised a measurement method using total stations (TSs) which have ?the Baum? which is a concentric circle reticle, as substitute for crosshairs. The Baum owes its name to the sim

    Aug 1, 2013

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Maximiser ? Beyond Pit Optimisation

    By M. A. Kelly

    Pit Optimisation using the Lerchs Grossman algorithm has been successfully applied in many deposits. Pit shells often form the basis for scheduling. Pre-assigned costs may not accurately reflect the c

    May 1, 2007

  • CIM
    The Equator Principles and Beyond

    By Tim Bekhuys

    Equator Principles ? Applies to projects > $10 million ? Voluntary agreement between 58+ EPFIs ? Categorized projects based on environmental risk, consequences ? Requirements for EA, EMP, use of s

    May 1, 2008