Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Maximiser ? Beyond Pit Optimisation

    By M. A. Kelly

    Pit Optimisation using the Lerchs Grossman algorithm has been successfully applied in many deposits. Pit shells often form the basis for scheduling. Pre-assigned costs may not accurately reflect the c

    May 1, 2007

  • CIM
    The Equator Principles and Beyond

    By Tim Bekhuys

    Equator Principles ? Applies to projects > $10 million ? Voluntary agreement between 58+ EPFIs ? Categorized projects based on environmental risk, consequences ? Requirements for EA, EMP, use of s

    May 1, 2008

  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    From Microbes to Plasma Spectrometer: An Evaluation of Ore Dissolution Efficiency

    By A. L. Williamson

    Bio-mining is a cost-effective, energy efficient and potentially environmentally protective method of exploiting a variety of ore deposits, from high-grade base metal deposits of nickel to lower-grade

    Aug 1, 2010

  • CIM
    Determining Fill Fence Stability During Increased Backfill Rates at an Underground Hard Rock Mine

    By K. K. Dehn

    This study focused on determining the stability of thin shotcrete fill fences at a hard rock mine in northwestern Ontario during increased pour rates of paste backfill. Determination of the stability

    May 1, 2007

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    Characterization of Laser Scanners for Detecting Cracks for Post-Earthquake Damage Inspection

    By Engin Burak Anil

    Objective, accurate, and fast assessment of damage to buildings after an earthquake is crucial for timely remediation of material losses and safety of occupants of buildings. Laser scanners are promis

    Aug 1, 2013

  • CIM
    The Serra Verde Rare Earth Deposit, Goias State, Brazil: Advancing to Production

    By Denilson Coutinho, Euler Soares, Paulo de Tarso, Jordana Ferreira, John R. Goode, Andreas Sprecher, Alexandre Rocha

    The Serra Verde Project is located in the northern part of Goiás state, Brazil, and comprises 49 mineral claims covering an area of 69,814 ha. The Serra Verde deposit is a rare earth element (REE) enr

    Jan 1, 2014

  • CIM
    Blast Improvements at the EKATI Fox Pit

    By Dwayne D. Tannant

    The Fox Pit at EKATI Diamond Mine reached a depth of approximately 150 m as of September 2005. The pit is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high

    May 1, 2006

  • CIM
    Cut-off grade calculations for an open-pit mine

    By H. T. John

    "The objective of this paper is to demonstrate how the optimum cut -off grade can be calculated for typical large tonnage openpit mines. In the examples, it is assumed that the concentrator tonnage is

    Jan 1, 1985

  • CIM
    An Update on the Geology of the Lupin Gold Mine, Nunavut, Canada

    By P. A. Geusebroek, N. A. Duke

    Abstract - The Lupin mine, located in the central Slave province just east of the western boundary of Nunavut Territory, is a world-class example of a Neoarchean-aged banded iron formation (BIF)-hoste

    Jan 1, 2004

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 2

    By D. Berkley

    The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining an

    Mar 1, 2003

  • CIM
    The SCR® Process Produces High Quality Copper Rod Around The World

    By P. W. Ware

    The majority of all refined copper is consumed to produce electrical conductors. Most copper conductors are drawn into wire from 8 mm ETP copper rod produced from high purity copper cathodes. Southwir

    Jan 1, 2007

  • CIM
    Mineral Resource Classification. How the Viability of your Project may Hang on a Qualified Person?s Judgement

    By P. R. Stephenson

    Mining projects depend on the amount and quality of the mineral reserves, which in turn depend on the amount and quality of the mineral resources. Only Measured and Indicated Resources may be converte

    May 1, 2011

  • CIM
    An Innovative Wireless Electrolytic Cell Monitorpowered By Ultra-Low Bus Voltage

    By E. You

    Kennecott Utah Copper Refinery and Outokumpu Technology have developed a wireless Electrolytic Cell Monitor (CellSensor) system to monitor cell voltage and temperature. The system is based on a robust

    Jan 1, 2007

  • CIM
    Integrated Computerized Underground Mine Design & Planning: Analyzing & Describing the Complexities Involved

    By Mario A. Morin

    Over the years, several sources have stressed the need to better integrate the underground mine design and planning processes. The belief is that with better integration, better designs and plans will

    May 1, 2001

  • CIM
    Arsenic Immobilization and Metal Recovery from El Teniente Smelter Dust

    By R. Ichimura

    This paper summarizes the results of a five-year project, which aimed at improving the current method to process the arsenic-bearing smelter dust of El Teniente. This project, which was started in 200

    Jan 1, 2007

  • CIM
    Analysis of Heap Leach Processes with Modeling and Simulation Tools

    By J. E. Gebhardt

    Advances in computational modeling provide unprecedented process simulation tools for the process engineer to examine and explore options for optimizing heap leach operations. A phenomenological model

    Jan 1, 2007