Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Systematic and Integrative Ore Characterization of Massive Sulfide Deposits: An Example from Voisey’s Bay Ni-Cu-Co Ovoid Orebody, Labrador, Canada

    By P. J. Sylvester, D. H. C. Wilton, R. I. Wheeler, M. A. E. Huminicki, D. Evans-Lamswood

    "Systematic characterization of the mineralogy of massive sulfide ore deposits can provide valuable insights into ore genesis and metallurgical processing that would not be apparent otherwise. We desc

    Jan 1, 2012

  • CIM
    Chapter III-Continued - Part 4. - Little Long Lac-Sturgeon River Area - General Structural Relationships of Ore Deposits in the Little Long Lac-Sturgeon River Area

    By H. Clare Horwood

    "In the Little Long Lac-Sturgeon River area of Thunder Bay district, Ontario, most of the known ore deposits occur in fractures, shear zones, and zones of brecciation, in folded sedimentary rocks . In

    Jan 1, 1954

  • CIM
    Improvements in Zinc Leach Residue Treatment by the Waelz Process at the Annaka Refinery

    By Y. Kusuda

    Since 1981, the Annaka refinery has recovered zinc from zinc leach residues by the Waelz Process. The important considerations of this process are the prevention of the growth of coating accretions in

    Jan 1, 2006

  • CIM
    Committee issues report on federal sales tax reform

    By Robert B. Parsons

    """I would be a rich man if I had a dime for every man hour spent by the bureaucracy on changing tax legislation."" Anonymous.The mind of a cynic might very well conjure thoughts about ""change for th

    Jan 1, 1983

  • CIM
    Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in Canada

    By D. J. Farmer

    Mining hoists are major components of any underground mine, however, the detailed design work required to get the actual power required for a particular hoist is outside the scope of preliminary feasi

    Jan 1, 1997

  • CIM
    What it takes to become a president

    By Douglas A. Sloan

    "Recently, a number of major mining companies seemed unable to find a president from within the industry, and were searching outside the industry. From this, one could conclude that managers within th

    Jan 1, 1982

  • CIM
    Kinetics of bainite transformation in hot-worked and ultrafine austenite of alloy steels.

    By E. V. Konopleva, H. J. McQueen

    "The isothermal bainite transformation kinetics of low- and medium-carbon alloy steels after hot deformation and the rmocycling treatment (TC) has been studied by the magneto - metric method. Deformat

    Jan 1, 1997

  • CIM
    A Dem Analysis of Rock Slope Stability in Presence of a Non-Persistent Joint

    By V. Bonilla-Sierra, M. Elmouttie, L. Scholtès, F. V. Donzé

    In the presence of joint sets sub-parallel to a slope face, the stability of the rock mass is controlled by the shear strength of the joints. On one hand, if the joints are persistent their shear stre

    Jan 1, 2015

  • CIM
    Use of Multivariate Geochemical Domains as a Validation Tool in the Classification of Predicted Resource Metal Extraction Recoveries. Fruta Del Norte Gold Deposit, Ecuador, Case Study

    By C. Dragusanu, J. Sims, J. Connolly

    Based on a statistical analysis of the categorical and numerical data from the established geological model, a geochemical classification of mineralization has been shown to be objective in nature and

    Jan 1, 2011

  • CIM
    Benefits of assessing line-of-sight from a LHD vehicle in a virtual environment

    By M. Djivre, T. Eger, A. Godwin, I. Bhattacherya

    Load-haul-dump vehicles (LHDs) are extensively used in underground mining, however, equipment design and operating conditions contribute to restricted operator sight lines. The inability to clearly se

    Jan 1, 2005

  • CIM
    Energy Saving Options for Continuous Transport Systems used in Mines, An Exploration

    By G. Lodewijks

    This paper explores the savings that can be achieved in the energy consumption of belt conveyors used in mines by changing the conveyor components, the operational parameters of the system or the belt

    Aug 1, 2013

  • CIM
    One ton of bismuth in the lead smelter and 60 years of Kroll-Betterton

    By Funsho K. Ojebuoboh

    With several “green” applications on the horizon, bismuth has become an even more important minor metal in the smelting and refining of lead. Smelters with a complex sulphide feed invariably deal with

    Jan 1, 1996

  • CIM
    Application of Huate® New Style Forced-Oil Cooling Vertical Ring Whims in Beneficiation

    By Baochun Wang, Hongli Jia, Zhaolian Wang, Fengliang Liu

    "Promote and apply a new beneficiation technology and equipment effectively processing the refractory and medium-fine grained weak-magnetic minerals. HUATE® Forced-oil Cooling Vertical Ring WHIMS adop

    Jan 1, 2016

  • CIM
    Preparation And Application Of Basic Zinc Sulfate For Iron Precipitation As Jarosite: A Strategy To Reduce The Loss Of Values In The Zinc Leaching Circuit.

    By Guadalupe Sanchez, Roel Cruz, Sergio Castro, Claudia Beltrán, Isabel Lázaro

    The recovery of zinc in refineries is strongly affected by the formation of zinc ferrites during the roasting of zinc concentrates. To achieve the highest zinc recovery most of these plants operate un

    Jan 1, 2014

  • CIM
    Refractory Performance and Campaign Life Extension of the Reverberatory Furnace at HBMS in Flin Flon

    By J. M. Cooper

    The HBMS reverb furnace in Flin Flon was originally designed in the late 1920s. Throughout the decades campaign life has been increased due to operational practices, technological changes and brick qu

    Jan 1, 2007

  • CIM
    The Change in Operating Philosophy After Converting the Comminution Circuit from a Single Stage SAG Mill to a SAG/Ball Mill Circuit ? The Tarkwa Experience

    The comminution circuit at Tarkwa Gold Mine was commissioned as a Single Stage SAG mill operated in closed circuit with hydrocyclones designed to process 4Mtpa. The circuit was later expanded by addin

    Jan 1, 2012

  • CIM
    Formation of H2O2 by Metal Sulfides and its Effect in Sulfide Mineral Flotation

    By K. Hanumantha Rao, A. Javadi

    Our recent studies revealed that the sulfide minerals in contact with water during grinding produced hydrogen peroxide (H2O2) where the amount of H2O2 production by the minerals found to be in the ord

    Jan 1, 2016

  • CIM
    Effects of Retained Calcium Ions in Iron Ore Concentrates on Filtration and Pelletization Performance

    By S. K. Kawatra, S. J. Ripke, T. C. Eisele

    It was determined by the authors that the water that remains in the filter cake after filtration in iron ore concentrators can contain several hundred times greater concentrations of calcium ions and

    Jan 1, 2004

  • CIM
    Effectiveness of Methane Drainage in the Coal Mines of Kompania Weglowa S.A. ? Existing Limitations

    By M. Uszko

    The paper presents the conditions for determining the selection of methods for methane drainage in Polish hard coal mines. Various factors for the evaluation of methane drainage performance are used,

    Aug 1, 2013

  • CIM
    Unsustainability of Very Large Gold Producers—12 Years Later

    By H. R. Bullis

    "A 2003 paper discussed the idea that as gold mining companies grow larger it becomes more difficult for them to discover or acquire new gold deposits large enough to replace extracted reserves on an

    Jan 1, 2019