Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    A theory of cutter roof failure and its application

    By A. Baydusa, K. Barron

    A theory for cutter roof failure in coal mines has been developed. It is shown that the key parameters influencing the likelihood of cutter roof failure are the rock strength, the vertical stress (dep

    Jan 1, 1999

  • CIM
    Water Supply Sourcing Options for Oil Sands Mines

    By Leslie F. Sawatsky

    Each potential oil sands developer deals with the question of optional sources of raw water to supply large water demands that range from 50 to 80 million cubic metres per year for each of six existin

    May 1, 2004

  • CIM
    Flotation of REE Bearing Minerals from Silicate and Carbonate Host Deposits

    By T. Deng

    Flotation of rare earths is complicated by the number of mineral classes that carry rare earth elements, including carbonates, phosphates, and silicates that often co-occur within the same deposit. Ga

    Jan 1, 2014

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • CIM
    A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas

    By Anil K. Beersing

    Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring

    Apr 1, 2005

  • CIM
    Dynamic Testing of Friction Rock Stabilisers

    A rough simulated borehole has been developed for the installation and dynamic testing of rock bolts a the WASM Dynamic Test Facility. The rough simulated borehole is used for rock bolts that are sens

    May 1, 2009

  • CIM
    Evidence of an iron-gold corrosion cell during the Zadra pressure elution of loaded carbon

    By C. Taschereau, G. A. Vickell, A. R. Laplante

    Evidence in support of an iron-gold corrosion cell during the high-temperature/highpressure elution of loaded carbon is presented herein including, but not limited to, its discovery, mode of genesis,

    Jan 1, 2006

  • CIM
    The Effect of Fine Grinding on Copper and Zinc Metallurgical Performance at Sherritt Gordon Mines Limited Ruttan Mine, Leaf Rapids, Manitoba

    By C. B. Webber, W. A. Grell

    "Sherritt Gordon's Ruttan Mine is a copper-zinc operation located approximately 600 miles north-west of Winnipeg. Open pit mining began in 1973 at 10,000 Tpd., with a change over to underground mining

    Jan 1, 1982

  • CIM
    Geology and Mineral Deposits of the Gallinas Mountains REE Deposit, Lincoln and Torrance Counties, New Mexico, USA

    By Virginia T. McLemore

    The Gallinas Mountains are in northern Lincoln County and southern Torrance County, New Mexico, USA where a series of alkaline igneous bodies, including porphyritic latite, trachyte/syenite, andesite,

    May 1, 2011

  • CIM
    The Application of Rare Earth Element Analyses in the Exploration for Volcanogenic Massive Sulfide Type Deposits

    By G. H. Gale, M. A. F. Fedikow, L. B. Dabek

    Abstract-Rare earth element (REE) data are reported for ores, sulfide-bearing rocks and host rocks from massive sulfide deposits and barren sulfide facies iron formations in Proterozoic volcanic rocks

    Jan 1, 1997

  • CIM
    Effect of welding speed on Nd:YAG laser weldability of ZE41A-T5 magnesium sand castings

    By H. Al-Kazzaz

    The 2-mm butt joints of ZE41A-T5 sand castings were laser welded using 1.6 mm EZ33A-T5 filler wire and a continuous wave Nd:YAG system at a power of 4 kW, surface defocusing and various welding speeds

    Jan 1, 2005

  • CIM
    Magnetic Conditioning of Sphalerite at Red Dog Mine

    By B Lumsden, B Lacouture

    "Red Dog is one of the largest zinc mines in the world both in terms of reserves and annual production. In 2013, Red Dog produced 551,300 mt of contained zinc and 96,700 mt of contained lead. The mine

    Jan 1, 2016

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Enhancing Cobalt Recovery from Copper/Nickel Matte Producing Smelters

    By V. I. Lakshmanan

    Process Research ORTECH Inc. (PRO), with its in-depth knowledge on cobalt behaviour in nickel matte smelters and its novel mixed chloride hydrometallurgical processing, is developing a hybrid process

    Jan 1, 2019

  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004

  • CIM
    The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)

    By K. Meyer, M. E. Goddfellow

    "At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm

    Jan 1, 1991

  • CIM
    An agent-based framework for open pit mine planning

    By K. Awuah-Offei

    Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in

    Jan 1, 2008