Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Future of Sustainability

    By Bruce Conard

    For many years, Bruce Conard has been engaged in reading about and discussing the desired sustainability of the mining and metals resource industry. He has, however, become concerned that there is a g

    Jan 1, 2014

  • CIM
    Normetal Mine

    By W. L. Brown

    "The Normetal mine is about 7 miles east of the Ontario-Quebec boundary, and 13 miles north of the town of Dupuy on the Canadian National railway. The mine workings are largely on lots 44 and 45 in th

    Jan 1, 1954

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • CIM
    Dual Phase Bainitic Linepipe Steels

    By E. Essadiqi, P. Poruks, D. Boyd, D. Emadi, I. Yakubtsov, T. Turi

    This paper reviews the results of an extensive study of microstructures and mechanical properties in bainitic linepipe steels. The research was carried out as a collaborative project between Queen&apo

    Jan 1, 2005

  • CIM
    New technology for hoist conveyance monitoring and analysis (ce4cfab2-0d27-4d96-82b0-9facfbf66b01)

    By M. J. Beus

    Many mines in Canada, the United States and South Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due to the excessive weight. It has been sugg

    Jan 1, 2002

  • CIM
    Interactive tools for learning basic geostatistical concepts

    By A. Vervoort, A. Govaerts

    Geostatistical concepts are often difficult for students to understand, even those with a strong mathematical background. One of the main problems is the link between the variation of the parameter va

    Jan 1, 2014

  • CIM
    Stabilité Géotechnique Des Ouvrages De Retenue Pour Les Résidus Miniers: Problèmes Persistants Et Méthodes De Contrôle

    By Michel Aubertin

    Les digues de retenue de résidus miniers devraient être conçues de façon à supporter les charges les plus défavorables qui puissent être anticipées. Les nombreux incidents survenus au cours des derniè

    Nov 1, 2002

  • CIM
    Modelling the high pressure leaching of laterite using Aspen Plus and OLI

    By V. G. Papangelakis, M. Cheung, M. Dry

    The high pressure acid leaching of laterite was modelled and simulated using a combination of two commercially available software packages, namely Aspen Plus 11.1 and the OLI Stream Analyzer. New kine

    Jan 1, 2005

  • CIM
    McKenzie Red Lake Mine

    By H. Clare Horwood

    "Three types of structures, the main shear zone, the north shear zone, and a series of hanging-wall fractures, contain all the orebodies so far discovered at the McKenzie Red Lake mine. Lenses and vei

    Jan 1, 1954

  • CIM
    Microcel Column Flotation Scale-Up and Plant Practice

    By Roe-Hoan Yoon

    "Industrial flotation columns often suffer from low recoveries and high maintenance requirements because of poorly-designed air spargers. The MicrocelTM bubble generators were developed at Virginia Te

    Jan 1, 1994

  • CIM
    Continuous Training – Insurance for Sustainable Operation

    By Richard Phiri, Mike Milupi, Jackson Kapobe, Anton Lemmer, Charles Mazala

    Sustainability of plant operations in a rapidly changing mining environment requires a well-trained workforce to ensure smooth running of operations. To ensure availability of trained labor, Mopani Co

    Jan 1, 2019

  • CIM
    The Design, Commissioning and Operation of the Golden Giant Paste Backfill Plant

    By Jim Dodd, Jim Paynter

    "We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi

    Jan 1, 1997

  • CIM
    G.L. Tiley & Associates Ltd.

    In the last 30 years numerous mining plants have been developed in North America but only a handful of these have required freezing the area where the shaft was sunk. The most recent mine shaft to be

    May 1, 2002

  • CIM
    Ready or Not?Here They Come

    By Stephen Hammond

    ?Our own prejudices form the greatest barrier to creating an inclusive working environment.? Have you witnessed? Racism or Negative Comments about an Aboriginal Person? ?You are free to compete wi

    May 1, 2008

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning Circuit

    By Andy Cole

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    May 1, 2002

  • CIM
    Reducing Water Management Risks Through Processing Changes

    By C. Kennedy, S. Jensen

    Traditionally, mineral processing plants are designed to achieve the highest recovery of valuable material with limited regard for the cost of managing waste products-both solid and water components.

    Jan 1, 2014

  • CIM
    Ensuring Adequate Safety When Using Hydrogen as a Fuel

    By D. Allan Coutts

    Demonstration projects using hydrogen as a fuel are becoming very common. Often these projects rely on project-specific risk evaluations to support project safety decisions. This is necessary becaus

    May 1, 2007

  • CIM
    Statistical Multi-Scale Method of Mechanics Parameter Prediction for Rock Mass

    By J. Z. Cui

    In this paper a statistical multi-scale method for the mechanics parameter prediction of the rock mass with random distribution of multi-scale cracks/joints is presented. First the micro-structure of

    May 1, 2009

  • CIM
    Estimation of liberation

    By T. Yalcin

    "This paper describes the development of a mathematical model for determining the liberation of an ore at various grinding sizes, based on the combined results of microscopic counting, grinding tests,

    Jan 1, 1985