Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Variables and Sensors of Importance to EVOPBy R. E. Hamilton
"The requirements for effective optimization of a mineral dressing operation are discussed, with specific reference to a flotation system . Also considered are the relation-ships between automatic con
Jan 1, 1967
-
Dehydration of Mine Tailings using Geocontainers (Mactubes). Case Study: Raura Mine - Huánuco ? PeruBy J. Oré
An alternative method for dewatering slurry (tailings) is the use of geocontainers (MacTubes). The practical application of this work was carried out in the concentrator plant of the Raura Mining Comp
Aug 1, 2013
-
Methodology for Quantifying Uncertainty Versus Data Spacing Applied to the Oil SandsABSTRACT The inevitable uncertainty in modelling spatial variables decreases as more data become available. This reduction depends on the properties of the variable being modelled. Spatially continuou
Jan 1, 2013
-
Engineered Completions Increase Oil RecoveryBy R. W. Coburn
The results of field experiments on wells which required stimulation indicated that engineered well-completions will cause an increase in ultimate recovery at reduced costs. Techniques and tools have
Jan 1, 1960
-
Co-Precipitation of Arsenic with Ferric Ions: Disposal Strategy for Inco's New Weak Acid Treatment Plant SludgeBy K. Hardy
As part of Inco's $115 million Fluid Bed Roaster SO2 Abatement Project, a new weak acid treatment plant (WATP) was constructed to treat bleed solutions from the Copper Cliff Smelting Complex gas-
Jan 1, 2006
-
Financing your Project: What will due diligence expose?By Chris McBean
Due diligence mistakes ? lost opportunity ? High profile write-downs and cost overruns ? Result ? tight market for financing ? Implications for due diligence ? need to get it right ? maybe only on
May 1, 2013
-
Water Quality Monitoring at the Site Of a Proposed Base Metal Mining ComplexBy C. J. Edmonds, R. Bland, W. C. Ferguson, R. Whitehead
"In 1969, the Environmental Science Division of James F. MacLaren Limited received authorization from The International Nickel Company of Canada, Limited to carry out a water quality monitoring progra
Jan 1, 1973
-
The Story of CementBy Oliver Bowles
Cementing materials of mineral origin were well known to the ancients. Ordinary lime and gypsum plasters were the first to be recorded by historians. The next development was the discovery that certai
Jan 1, 1933
-
Pacific Continental Margin"THE PACIFIC CONTINENTAL MARGIN OF CANADA is de-fined, for the purposes of this paper, as the area sea-ward from the present mainland coast of British Columbia to the foot of the continental slope. It
Jan 1, 1970
-
Application of Structural-Thermal Modelling to Negate the Need for Movement Joints within a Frozen Mine ShaftBy A. Pearson, Auld. F. A., S. O. Colbeck
"To minimise mine shaft maintenance over the long-term, some potash mine shaft sinking projects have required the provision of a continuous fully welded waterproof steel liner over a substantial depth
Jan 1, 2019
-
Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration PlantBy S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam
At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale
Jan 1, 2016
-
Bird River Chromite Deposits, ManitobaBy J. D. Bateman
DURING the summer of 1942 several chromite deposits were discovered in the Lac du Bonnet district about eighty miles northeast of Winnipeg. The deposits are confined to the Bird River complex, a folde
Jan 1, 1943
-
Characteristics and Application of Round, Flattened, and Locked Strand RopesBy H. Hitchen
THE PURPOSE of this paper is to indicate the working capacity of different types of ropes for various engineering and mining duties. ROPE CONSTRUCTIONS There are approximately one hundred different
Jan 1, 1957
-
The Square-Set Method of Stoping at ButteBy J. B. Mawdsley
From the view point of the mining engineer, the square-set method of stoping as practised at Butte, Montana, is one ?of the outstanding features of well conducted mining operations in that camp. The f
Jan 1, 1925
-
Renovation of the drainage system at Ineo's Pipe Open PitBy R. G. Achter, E. Wilson
"This paper describes the work undertaken to renovate the Pipe Open Pit drainage system, incorporating measures to improve effluent quality. It describes the technical feat of drilling an l l-inch-dia
Jan 1, 1980
-
The Tensile Strength of Light SteelBy E. W. Williams
THE Ontario Research Foundation has developed a process for producing low-density steel shapes by direct reduction of iron oxide powders. The process is a combination of reduction, sintering (without
Jan 1, 1957
-
An overview of Minnova's Ansil mineBy J. Desrosiers
"Minnova Inc. has five operating divisions thoughout Canada. One of them is Lac Dufault which was established in 1964.Lac Dufault is located 15 km north of Rouyn-Noranda, in what is known as Noranda v
Jan 1, 1991
-
Network Convergence for Underground MinesBy Matthew R. Ward
This paper aims to describe the reasons and methods to extend enterprise networks into underground mines. Currently mines use a number of communication networks for telephones, PLCs, two-way VHF radio
Apr 1, 2005
-
The Development of New Structural Steels 1n CanadaBy G. E. Willey
F OR many years, only one grade of structural steel has been used in volume in Canada. Its characteristics have not been altered appreciably and its long use speaks well for its performance. This stan
Jan 1, 1962
-
The Donalda gold deposit, Rouyn-Noranda, QuebecBy Gérald Riverin, Bernard Boily, Daniel Bernard
"The Donalda gold deposit is located in the southern part of the Noranda camp, approximately 2 /em east of the Horne deposit. Combined past production and current reserves total over 1.5 Mt grading 6.
Jan 1, 1990